Search

found 324 results

Images, UC QuakeStudies

Members of the public speaking with police officers on the corner of Durham Street and Armagh Street in the aftermath of the 22 February earthquake. On the right the timber section of the historic Provincial Council Chambers can be seen, including the clock tower which has collapsed onto the road. Armagh Street leading into the city has been cordoned off by red tape.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Kenton Chambers Building on Hereford Street. Large cracks have formed in the columns between the building's windows. A section on the bottom storey has collapsed and the bricks have spilled onto the footpath in front. Steel fences have been placed across the street as a cordon.

Images, UC QuakeStudies

A photograph of earthquake damage to the Kenton Chambers Building on Hereford Street. Cracks have formed between the windows of the building. A section of the bottom storey has collapsed, the bricks spilling onto the footpath. Steel fencing and road cones have been placed on the street in front of the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street. Large sections of the masonry have collapsed, spilling onto the road. Wire fencing has been placed around the building as a cordon. Scaffolding erected up the side of the building after the 4 September 2010 earthquake has collapsed. In the distance, a crane is parked on the street.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Kenton Chambers Building on Hereford Street. Large cracks have formed in the columns between the building's windows. A section of the bottom storey has collapsed and the bricks have spilled onto the footpath in front. Steel fences have been placed on the street as a cordon. In the distance there are many other earthquake-damaged buildings.

Images, UC QuakeStudies

A fire engine driving past the damaged Provincial Council Legislative Chamber on Durham Street. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.