Search

found 380 results

Videos, UC QuakeStudies

A video of a presentation by Professor Chris Kissling, Fellow of the Chartered Institute of Logistics and Transport, at the 2016 Seismics in the City Conference. The presentation is titled, "Transport Roles in Helping Shape Canterbury's Post-earthquakes Future".The abstract for the presentation reads, "The necessity for embracing integrated transportation solutions to meet emerging societal needs."

Images, Alexander Turnbull Library

A signpost pointing 'West' and 'East'. The sign pointing West is intact; that indicating East is broken and barely hanging on to the post. Refers to the condition of Christchurch City after the earthquakes of 2010 and 2011; the western wealthier suburbs were less damaged than the poorer Eastern suburbs. Also, progress on repair and rehabilitation of eastern housing had been slow. The redesign of the city centre seemed to be a western suburb priority which ignored the poverty and misery of living conditions on the east. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

The Canterbury earthquakes of 2010 and 2011 caused significant damage and disruption to the city of Christchurch, New Zealand. A Royal Commission was established to report on the causes of building failure as a result of the earthquakes as well as look at the legal and best-practice requirements for buildings in New Zealand Central Business Districts. The Royal Commission made 189 recommendations on a variety of matters including managing damaged buildings after an earthquake, the adequacy of building codes and standards, and the processes of seismic assessments of existing buildings to determine their earthquake vulnerability. In response the Ministry of Business, Innovation and Employment, the agency responsible for administering building regulation in New Zealand, established a work programme to assist with the Canterbury rebuild and to implement the lessons learned throughout New Zealand. The five primary work streams in the programme are: • Facilitating the Canterbury Rebuild • Structural Performance and Design Standards • Geotechnical and structural guidance • Existing Building Resilience • Post Disaster Building Management This paper provides more detail on each of the work streams. There has been significant collaboration between the New Zealand Government and the research community, technical societies, and engineering consultants, both within New Zealand and internationally, to deliver the programme and improve the resilience of the New Zealand built environment. This has presented major challenges for an extremely busy industry in the aftermath of the Canterbury earthquakes. The paper identifies the items of work that have been completed and the work that is still in progress at the time of writing.

Images, Alexander Turnbull Library

Text reads 'The new liquefaction?...' and the cartoon depicts a huge mass of 'insurance red tape' inside which is a man with a spade. Two people stare despairingly at the red tape and the man says 'How are we EVER gonna rebuild with this stuff bubbling up!' Context: The people are trying to rebuild their house after the Christchurch earthquakes and are having trouble with their insurance company. The Press has been contacted by people unable to get insurance to buy new homes, construct buildings or start businesses. Business leaders have called insurance delays a "cancer" eating away at the city's recovery, and Earthquake Recovery Minister Gerry Brownlee has acknowledged insurance is an "ongoing problem". (The Press - 24 August 2011) Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

Knowing how to rapidly rebuild disaster-damaged infrastructure, while deciding appropriate recovery strategies and catering for future investment is a matter of core interest to government decision makers, utility providers, and business sectors. The purpose of this research is to explore the effects of decisions and outcomes for physical reconstruction on the overall recovery process of horizontal infrastructure in New Zealand using the Canterbury and Kaikoura earthquakes as cases. A mixed approach including a systematic review, questionnaire survey and semi-structured interviews is used to capture perspectives of those involved in reconstruction process and gain insights into the effect of critical elements on infrastructure downtime. Findings from this research will contribute towards advancements of a systems dynamics model considering critical decision-making variables across phases of the reconstruction process to assess how these variables affect the rebuild process and the corresponding downtime. This project will improve the ability to explore alternative resilience improvement pathways and test the efficacy of alternative means for facilitating a faster and better reconstruction process.

Research papers, The University of Auckland Library

This thesis revisits the topic of earthquake recovery in Christchurch City more than a decade after the Canterbury earthquakes. Despite promising visions of a community reconnected and a sustainable and liveable city, significant portions of the city’s core – the Red Zone – remain dilapidated and “eerily empty”. At the same time, new developments in other areas have proven to be alienated or underutilised. Currently, the Canterbury Earthquake Recovery Authority’s plans for the rebuilding highlight the delivery of more residential housing to re-populate the city centre. However, prevalent approaches to housing development in Christchurch are ineffective for building an inclusive and active community. Hence, the central inquiry of the thesis is how the development of housing complexes can revitalise the Red Zone within the Christchurch city centre. The inquiry has been carried out through a research-through-design methodology, recognising the importance of an in-depth investigation that is contextualised and combined with the intuition and embodied knowledge of the designer. The investigation focuses on a neglected site in the Red Zone in the heart of Christchurch city, with significant Victorian and Edwardian Baroque heritage buildings, including Odeon Theatre, Lawrie & Wilson Auctioneers, and Sol Square, owned by The Regional Council Environment Canterbury. The design inquiry argues, develops, and is carried through a place-assemblage lens to housing development for city recovery, which recognizes the significance of socially responsive architecture that explores urban renewal by forging connections within the social network. Therefore, place-assemblage criteria and methods for developing socially active and meaningful housing developments are identified. Firstly, this thesis argues that co-living housing models are more focused on people relations and collective identity than the dominant developer-driven housing rebuilds, as they prioritise conduits for interaction and shared social meaning and practices. Secondly, the adaptive reuse of derelict heritage structures is proposed to reinvigorate the urban fabric, as heritage is seen to be conceived as and from a social assemblage of people. The design is realised by the principles outlined in the ICOMOS charter, which involves incorporating the material histories of existing structures and preserving the intangible heritage of the site by ensuring the continuity of cultural practices. Lastly, design processes and methods are also vital for place-sensitive results, which pay attention to the site’s unique characteristics to engage with local stakeholders and communities. The research explores place-assemblage methods of photographic extraction, the drawing of story maps, precedent studies, assemblage maps, bricolages, and paper models, which show an assembly of layers that piece together the existing heritage, social conduits, urban commons and housing to conceptualise the social network within its place.

Images, Alexander Turnbull Library

The cartoon shows the 'CCC Office' (Christchurch City Council) as a small ramshackle wooden building in a desert; bits of animal skeleton lie around and there are saguaro cactus and tumbleweed. A cowboy has arrived and asks 'So... Can I speak to the Deputy, Deputy, Deputy, Assistant Sheriff?' Context - A reference to layers of officialdom in Christchurch as the city struggles to rebuild itself as well as many councillors being away on holiday while the quake problems continue. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Passengers use the baggage carousel at the Christchurch Airport to sleep on as they are swept around. 'Such a unique concept... a revolving motel!' Shortage of accommodation in Christchurch, because of earthquake-damaged hotels and motels and workers coming in for the Rebuild, was a serious problem for travellers to Christchurch, leading many to sleep in the airport overnight. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

Principal contractors can achieve better financial performance in civil construction projects by increasing the proportion of works delivered by subcontractors. However, anecdotally the use of subcontractors is thought to be make principal contractors less competitive due to compounding profit margins. This study found that projects with a higher proportion of subcontracted work exhibit better financial results than projects with less work delivered by subcontractors. This study uses the Christchurch Infrastructure Alliance (known as the Stronger Christchurch Infrastructure Rebuild Team, SCIRT) as a case study to observe why principal contracting firms engage subcontractors and the effect subcontracting has on the overall performance of a construction project. Five top tier civil contracting firms (known as ‘delivery teams’) participated in the alliance. Each team was responsible for the delivery of individual projects. A sample of 334 individual SCIRT projects were analysed, and key delivery team staff were surveyed, to investigate the effect subcontractor engagement has on performance. Between the five delivery teams there were clear differences in how much work was delivered via subcontracts. The extent of this subcontractor engagement had a significant effect on the relative performance of the principal contractor. A positive correlation between subcontractor engagement and overall financial performance is observed, and a negative correlation is observed between subcontractor engagement and non-financial performance. Although the causes of these relationships appear complex, the primary reason appears to be that subcontracting fosters increased productivity by cascading financial performance incentives closer to the physical construction task. To maximise competitiveness and financial performance, principal contractors must embrace the use of subcontractors and develop efficient systems of managing subcontracted work.

Images, Alexander Turnbull Library

The cartoon shows the Minister for Earthquake Recovery, Gerry Brownlee, who wears a jacket with 'CERA' printed on it, reading from the 'Doomsday Book'. He reads 'The following suburbs and my hopes of a reputation as an effective minister, are now officially listed as munted...' Context - On 23rd June Prime Minister, John Key, officially announced which streets and suburbs in earthquake-ravaged Christchurch would be abandoned. For many residents, there has been too much delay and too little information regarding progress towards resolving questions about which land can or cannot be used for rebuilding for Gerry Brownlee's reputation to remain unsullied. Quantity: 1 digital cartoon(s).

Audio, Radio New Zealand

The bill to fix botched EQC repairs from the Canterbury earthquakes has hit $270 million - four times what the previous Government predicted just two years ago. The Minister responsible for the Earthquake Commission, Megan Woods, has asked Treasury to urgently crunch some figures to give the Government an idea of its future liability, with many experts warning thousands more homes may be affected. The former Canterbury Rebuild Minister Gerry Brownlee, who was in the job for six years until a year ago, speaks to Guyon Espiner.

Videos, UC QuakeStudies

A video of a panel discussion at the 2014 Seismics and the City forum. The theme of this section was Building Momentum, and it addressed panellists' views on the progress of the rebuild, the main obstacles, and how they can be resolved. The panellists are as follows: Christchurch Mayor Lianne Dalziel; Waimakariri Mayor David Ayers; Roger Sutton, CEO of CERA; Ian Simpson, CEO of the NZ Earthquake Commission; Peter Townsend, CEO of Canterbury Employers' Chamber of Commerce; and Joanna Norris, Editor of The Press.

Audio, Radio New Zealand

Opposition parties fear a new department to control the rebuilding of Christchurch will be Wellington-centric and not allow the community to have its fair say in decisions. The Labour Party's spokesperson on the Canterbury Earthquake Recovery, Clayton Cosgrove, spoke to our political editor Brent Edwards.

Images, Alexander Turnbull Library

'The Politician' cartoon strip. A member of the government staff reads in a newspaper 'These emergency powers they've given the minister are the equivalent of war powers' and he adds 'and he's making the most of them!' The second frame shows a minister wearing a military uniform with cap that includes copious braiding and medals; he is sitting behind a desk labelled 'Minister General'. Context - Canterbury Earthquake Recovery Authority (CERA) will be established as a stand-alone government department to enable an effective, timely and co-ordinated rebuilding and recovery effort in Canterbury. The controversial bill empowers the new Canterbury Earthquake Recovery Authority (Cera) to take control of councils it believes are failing on reconstruction work. Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A photograph of the rebuilt Blackwell's Department Store on the corner of Williams Street and Raven Quay in Kaiapoi. The department store was rebuilt after the previous building was damaged in the 2010 and 2011 Canterbury earthquakes. This photograph was modelled off an image taken by BeckerFraserPhotos in September 2010.

Research Papers, Lincoln University

There is a critical strand of literature suggesting that there are no ‘natural’ disasters (Abramovitz, 2001; Anderson and Woodrow, 1998; Clarke, 2008; Hinchliffe, 2004). There are only those that leave us – the people - more or less shaken and disturbed. There may be some substance to this; for example, how many readers recall the 7.8 magnitude earthquake centred in Fiordland in July 2009? Because it was so far away from a major centre and very few people suffered any consequences, the number is likely to be far fewer than those who remember (all too vividly) the relatively smaller 7.1 magnitude Canterbury quake of September 4th 2010 and the more recent 6.3 magnitude February 22nd 2011 event. One implication of this construction of disasters is that seismic events, like those in Canterbury, are as much socio-political as they are geological. Yet, as this paper shows, the temptation in recovery is to tick boxes and rebuild rather than recover, and to focus on hard infrastructure rather than civic expertise and community involvement. In this paper I draw upon different models of community engagement and use Putnam’s (1995) notion of ‘social capital’ to frame the argument that ‘building bridges’ after a disaster is a complex blend of engineering, communication and collaboration. I then present the results of a qualitative research project undertaken after the September 4th earthquake. This research helps to illustrate the important connections between technical rebuilding, social capital, recovery processes and overall urban resilience.

Research Papers, Lincoln University

Lincoln University and CBRE, a commercial real estate service provider, have conducted research to investigate the impacts of the Canterbury earthquake on the commercial office market in Christchurch. The 22 February 2011 Canterbury earthquake had a devastating impact on Christchurch property with significant damage caused to land and buildings. As at January 2012, around 740 buildings have either been demolished or identified to be demolished in central Christchurch. On top of this, around 140 buildings have either been partially demolished or identified to be partially demolished. The broad aims of our research are to (i) examine the nature and extent of the CBD office relocation, (ii) identify the nature of the occupiers, (iii) determine occupier’s perceptions of the future: their location and space needs post the February earthquake, and the likelihood of relocating back to the CBD after the rebuild, and (iv) find out what occupiers see as the future of the CBD, and how they want this to look.