A pallet structure created by the Gap Filler staff, testing out different options.
A pallet structure created by the Gap Filler staff, testing out different options.
Pot plants laid in between two pallets.
Director of Gap Filler, Coralie Winn, photographed next to a stack of pallets. These are to be painted and constructed into the Pallet Pavilion.
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph captioned by Paul Corliss, "Central city, from Manchester Street".
A photograph of the Ash Keating mural, 'Concrete Propositions'. The photograph is captioned by Paul Corliss, "Central city, Manchester Street".
A photograph of a damaged house. The photograph is captioned by Paul Corliss, "192 Bridle Path Road, Heathcote".
A photograph of a damaged house. The photograph is captioned by Paul Corliss, "192 Bridle Path Road, Heathcote".
A photograph of a damaged house. The photograph is captioned by Paul Corliss, "192 Bridle Path Road, Heathcote".
A pallet structure created by the Gap Filler staff, testing out different options.
A sketched of how the the Pallet Pavilion's pallets will be put together.
The empty site of the Crowne Plaza Hotel, now demolished. Wire fencing surrounds the property. This is where the Pallet Pavilion is to be built. In the background, the Crowne Plaza can be seen.
Volunteers preparing trees to be transported to the site of the Pallet Pavilion.
A pallet structure created by the Gap Filler staff, testing out different options.
Volunteers at an event put on at the Pallet Pavilion to thank them for their hardwork and support.
Volunteers and Gap Filler staff in hard hats and high-visibility vests, photographed at the partially built Pallet Pavilion.
A digitally altered photograph of people playing games inside the Pallet Pavilion.
Lighting outside the Pallet Pavilion at night.
People listening to live music at the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
Pallets being stacked to form the walls of the Pallet Pavillion. Steel rods have been put in place to join the pallets together.
A member of Gap Filler with a hard hat and high-visibility vest, holding a tool to fill gaps in the Pallet Pavilion.
Volunteers standing on top of pallets during the construction of the Pallet Pavilion.
Pallets being stacked to form the walls of the Pallet Pavillion. Steel rods have been put in place to join the pallets together.
Volunteers in hard hats and high-visibility vests, lifting a pallet up to place on steel rods during the construction of the Pallet Pavilion.
A partially constructed wall of the Pallet Pavilion, beginning to take shape.
A volunteer in a hard hat and high-visibility vest, potting plants for the Pallet Pavilion.
Volunteers in hard hats and high-visibility vests, potting plants for the Pallet Pavilion.
Two volunteers in hard hats and high-visibility vests drilling holes in a pallet.