Search

found 2787 results

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team standing on the intersection of Manchester and Lichfield Streets. In the background is the Majestic Theatre. Piles of rubble from earthquake-damaged buildings has been piled on the road below the building.

Articles, UC QuakeStudies

An edited copy of the pdf transcript of Laura's second earthquake story, captured by the UC QuakeBox Take 2 project. At the participant's request, parts of this transcript have been redacted. Interviewer: Jennifer Middendorf. Transcriber: Laura Moir.

Images, UC QuakeStudies

Damage to the Lyttelton Hotel on Norwich Quay. The top of the building has crumbled, bringing the roof down with it. Bricks have fallen on the awning and all along the footpath. Wire fencing and road cones have been used to create a cordon around the building.

Images, UC QuakeStudies

A photograph looking west down Cashel Street towards the Bridge of Remembrance. Rubble from earthquake-damaged buildings is piled on the road in the distance. Wire fencing has been placed in front of a seating area to the left and around a building in the distance.

Images, UC QuakeStudies

The damaged Cranmer Courts on the corner of Kilmore and Montreal Streets. The corner of the building has crumbled onto the street, which is now littered with broken masonry. Wire fencing placed around the building after the 4 September 2010 earthquake has managed to keep the debris away from the road.

Images, UC QuakeStudies

A view looking south down Durham Street. Two fire engines are driving north, and a pair of construction workers are walking up the road. Behind them is the damaged Provincial Council Legislative Chambers. The building's walls and roof have collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake.

Images, UC QuakeStudies

Damage to the Visitors Centre in Kaiapoi, after the September 4th earthquake. The foundations have lifted at the back of the building, giving it a forward lean. Cables have been attached to the balcony over the walkway and braced to posts cemented into the ground. This is to stop the building from slumping further.

Images, UC QuakeStudies

Damage to the Visitors Centre in Kaiapoi, after the September 4th earthquake. The foundations have lifted at the back of the building, giving it a forward lean. Cables have been attached to the balcony over the walkway and braced to posts cemented into the ground. This is to stop the building from slumping further.

Images, UC QuakeStudies

A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.

Images, UC QuakeStudies

The damaged Ozone Hotel on Marine Parade. Fallen bricks lie on the ground in front of the building, which is surrounded by security fencing. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. Some buildings are still standing. but don't look too healthy".

Images, UC QuakeStudies

A photograph of the earthquake damage to the former Canterbury Public Library on the corner of Hereford Street and Cambridge Terrace. The bricks in the corner of the building have crumbled and masonry can be seen on the footpath below. Wire fences have been placed around the building as a cordon.

Videos, UC QuakeStudies

A video taken from a vehicle driving through the CBD Red Zone inside the cordon. The video shows damage to roads and buildings, and workers clearing rubble and demolishing buildings. Mark says, "I took this video when a few of us from our office were escorted into the red zone to collect gear from our office (which is still inside a cordoned-off area today)".

Videos, UC QuakeStudies

A video taken from a vehicle driving through the CBD Red Zone inside the cordon. The video shows damage to roads and buildings, and workers clearing rubble and demolishing buildings. Mark says, "I took this video when a few of us from our office were escorted into the red zone to collect gear from our office (which is still inside a cordoned-off area today)".

Images, UC QuakeStudies

A photograph of the earthquake damage to Charlie B's Backpackers on Madras Street. The front of the building has collapsed, the bricks and other rubble spilling onto the road and footpath in front. Many of the walls inside the top storey of the building are now hanging loose from the ceiling.

Images, UC QuakeStudies

A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. the ceiling of the building has been braced with scaffolding. A red sticker on the door indicates that the building is unsafe to enter.

Images, UC QuakeStudies

A photograph of the earthquake damage to a house on Bealey Avenue near Springfield Road. The walls have crumbled, the bricks spilling onto the footpath in front. The ceiling of the building has been braced with scaffolding. Wire fencing and police tape has been placed around the building as a cordon.

Images, UC QuakeStudies

The northern side of the Christ Church Cathedral with the cafe and store in the foreground. Shipping containers have been placed around the eastern side of the Cathedral to protect the road from falling debris. Wire fencing has also been placed around the building as a cordon. To the right, the damaged and party deconstructed tower can be seen with the missing spire which fell during the 22 February 2011 earthquake.

Images, UC QuakeStudies

A photograph of the Wellington Emergency Management Office Emergency Response Team posing for a photograph on Lichfield Street. In the background is the earthquake-damaged John Burns & Co. Ltd Building. The top storey of the side wall of the building has collapsed and the rubble has spilled into the car park below. Several cars which were crushed by the falling rubble have been stacked next to the building.

Images, UC QuakeStudies

A photograph of the earthquake damage to The Volcano Café on London Street. The brick wall on the left side of the building has crumbled, and the bricks have spilt onto the footpath. A red sticker on the door indicates that the building is no longer safe to enter. Plywood has been used to board up the windows and wire fencing has been placed around the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake-damaged Our City O-Tautahi Building on the corner of Worcester Street and Oxford Terrace. Steel bracing has been placed against the building to secure the brick walls. The bracing is supported by large concrete blocks. Wire fences have also been placed around the bottom of the building as a cordon. Scaffolding has been erected around the tower to the right.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The wall of the top storey of the building has crumbled, and bricks have fallen onto the footpath. Wire fencing, road cones, and cordon tape have been placed around the building as a cordon. Scaffolding and steel bracing can be seen against the front of the building.

Research papers, University of Canterbury Library

Abstract This study provides a simplified methodology for pre-event data collection to support a faster and more accurate seismic loss estimation. Existing pre-event data collection frameworks are reviewed. Data gathered after the Canterbury earthquake sequences are analysed to evaluate the relative importance of different sources of building damage. Conclusions drawns are used to explore new approaches to conduct pre-event building assessment.