A photograph of the new Press Building on Gloucester Street under construction. To the right, the former Theatre Royal can be seen with wooden beams placed under the awning for support.
Demolition along Kilmore Street. A digger can be seen as well as a construction worker with a high hat and high-visibility vest. The rubble has been separated into different piles.
Fencing in Poplar Lane cuts one side off from the other, but a City Council sign reads "Businesses open as usual during construction", indicating the stores and bars are still open.
A photograph looking west down Tuam Street. C1 Espresso can be seen on the right. On the left, construction hoarding and scaffolding surrounds the badly-damaged McKenzie & Willis building.
Photograph captioned by BeckerFraserPhotos, "The BNZ building on Armagh Street with the PWC building under construction and Copthorne Hotel being demolished behind. The Forsyth Barr building can also be seen".
A photograph of a mural on a wall in the former site of a building on Norwich Quay in Lyttelton. Sections of reinforcing steel have been laid up against the mural.
Orientation: Large-scale events such as disasters, wars and pandemics disrupt the economy by diverging resource allocation, which could alter employment growth within the economy during recovery. Research purpose: The literature on the disaster–economic nexus predominantly considers the aggregate performance of the economy, including the stimulus injection. This research assesses the employment transition following a disaster by removing this stimulus injection and evaluating the economy’s performance during recovery. Motivation for the study: The underlying economy’s performance without the stimulus’ benefit remains primarily unanswered. A single disaster event is used to assess the employment transition to guide future stimulus response for disasters. Research approach/design and method: Canterbury, New Zealand, was affected by a series of earthquakes in 2010–2011 and is used as a single case study. Applying the historical construction–economic relationship, a counterfactual level of economic activity is quantified and compared with official results. Using an input–output model to remove the economy-wide impact from the elevated activity reveals the performance of the underlying economy and employment transition during recovery. Main findings: The results indicate a return to a demand-driven level of building activity 10 years after the disaster. Employment transition is characterised by two distinct periods. The first 5 years are stimulus-driven, while the 5 years that follow are demand-driven from the underlying economy. After the initial period of elevated building activity, construction repositioned to its long-term level near 5% of value add. Practical/managerial implications: The level of building activity could be used to confidently assess the performance of regional economies following a destructive disaster. The study results argue for an incentive to redevelop the affected area as quickly as possible to mitigate the negative effect of the destruction and provide a stimulus for the economy. Contribution/value-add: This study contributes to a growing stream of regional disaster economics research that assesses the economic effect using a single case study.
A empty site in Bexley where a house once stood. The foundations for the house can still be seen. A sign reading, 'Danger construction site' hangs on the security fence that surrounds the area.
Urban Search and Rescue personnel escorting construction workers over a bridge on Colombo Street in the aftermath of the 22 February 2011 earthquake. The road and footpath have been severely warped by the earthquake.
Urban Search and Rescue personnel escorting construction workers over a bridge on Colombo Street in the aftermath of the 22 February 2011 earthquake. The road and footpath have been severely warped by the earthquake.
Piles of rubble along Kilmore Street. A digger can be seen in the background as well as a construction worker in a hard hat and high-visibility vest. The rubble has been separated into different piles.
Photograph captioned by BeckerFraserPhotos, "The new Westende Jewellers building on the corner of Manchester and Worcester Streets. The former building collapsed in the 4 September 2010 earthquake".
Construction workers examining the damaged top of the facade of the Lyttelton Coffee Company building on London Street in the basket from a crane. In the foreground, a pile of scrapped corrugated iron can be seen.
Construction workers examining the damaged top of the facade of the Lyttelton Coffee Company building on London Street in the basket from a crane. In the foreground, a pile of scrapped corrugated iron can be seen.
A construction worker using a saw to cut through a metal beam from the ruins of the Canterbury Television Building. Smoke is billowing from the ruins, which were still partly on fire when the photograph was taken.
The Windsor Hotel, on the corner of Montreal Street and Armagh Street. The building was red-stickered after the September 2010 earthquake and demolished after the February 2011 earthquake. Beside the hotel, construction has begun on a modern, tilt-slab building.
A plan which describes how SCIRT will manage the coordination of utility authority liaison and utility relocation or protection during the design and construction phases of the rebuild schedule. The first version of this plan was produced on 15 November 2011.
Construction materials outside a house on Canterbury Street in Lyttelton. The house is being demolished after the 22 February 2011 earthquake. Wire fencing and road cones cordon off the area, and a bulldozer and a digger are parked on the road.
A plan which outlines the function, roles and responsibilities of SCIRT during an emergency event affecting SCIRT construction works. The first version of this plan was produced on 30 April 2012. Note that personal details of key personnel have been removed from this document.
A natural disaster will inevitably strike New Zealand in the coming years, damaging educational facilities. Delays in building quality replacement facilities will lead to short-term disruption of education, risking long-term inequalities for the affected students. The Christchurch earthquake demonstrated the issues arising from a lack of school planning and support. This research proposes a system that can effectively provide rapid, prefabricated, primary schools in post-disaster environments. The aim is to continue education for children in the short term, while using construction that is suitable until the total replacement of the given school is completed. The expandable prefabricated architecture meets the strength, time, and transport requirements to deliver a robust, rapid relief temporary construction. It is also adaptable to any area within New Zealand. This design solution supports personal well-being and mitigates the risk of educational gaps, PTSD linked with anxiety and depression, and many other mental health disorders that can impact students and teachers after a natural disaster.
A photograph of the south side of the building at 112 Manchester Street. A contemporary billboard for Fortis Construction reads, "Let's build our new city together - kia kaha". It partly obscures an old painted sign for Polson's Decorators and Signwriters, which reads "Protect your investment. Paint your property regularly - and save money".
A PDF copy of The Star newspaper, published on Friday 13 July 2012.
A photograph of a temporary installation titled Highlight under construction in the Re:START mall car park on Cashel Street. The installation was created by students from Unitec Architecture Department for Canterbury Tales - a carnivalesque procession which was the main event of FESTA 2013.
A photograph of a temporary installation titled Highlight under construction in the Re:START mall car park on Cashel Street. The installation was created by students from Unitec Architecture Department for Canterbury Tales - a carnivalesque procession which was the main event of FESTA 2013.
A photograph of a temporary installation titled Highlight under construction in the Re:START mall car park on Cashel Street. The installation was created by students from Unitec Architecture Department for Canterbury Tales - a carnivalesque procession which was the main event of FESTA 2013.
A photograph of a temporary installation titled Highlight under construction in the Re:START mall car park on Cashel Street. The installation was created by students from Unitec Architecture Department for Canterbury Tales - a carnivalesque procession which was the main event of FESTA 2013.
A photograph of a temporary installation titled Highlight under construction in the Re:START mall car park on Cashel Street. The installation was created by students from Unitec Architecture Department for Canterbury Tales - a carnivalesque procession which was the main event of FESTA 2013.
On a walk around the neighbourhood, December 3, 2013, Christchurch New Zealand. www.stuff.co.nz/the-press/christchurch-life/avenues/featu...
Knox Church earthquake repair/rebuild on a walk around Christchurch December 11, 2013 New Zealand. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... All about our ear...
Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake. Behind them a team of Fire Service and Urban Search and Rescue personnel can be seen using a crane to check the Forsyth Barr building for trapped people.