Search

found 484 results

Images, UC QuakeStudies

A large crack between a row of trees and the riverbank. A fence lining the riverbank has collapsed. The photographer comments, "On the 22 February 2011 we had an earthquake in Christchurch, which ripped us apart literally. This is what happened to the riverbank at New Brighton. Some trees stayed in place and others dropped 2 feet. The amazing thing was that they all stayed upright".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".

Images, UC QuakeStudies

Photograph captioned by Fairfax, "Engineers from ECAN and other areas in New Zealand have been inspecting the Waimakariri River stop banks on the coast side of State Highway 1 after the September earthquake. Brian McIndoe, ECAN Waimakariri Area Engineer, inspects one of the cracks which is causing concern on the stop bank".