Search

found 497 results

Images, UC QuakeStudies

A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.

Images, UC QuakeStudies

A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need for reinforcement. The clock has stopped at around 16:35, the time of the earthquake.

Images, UC QuakeStudies

A photograph looking south down Colombo Street from the intersection of Gloucester Street. In the distance a crane is hanging over Cathedral Square. Below the crane is the partially-demolished tower of the ChristChurch Cathedral. A pile of rubble is sitting in front.

Images, UC QuakeStudies

A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.

Images, UC QuakeStudies

Crack repairs on the Rendezvous Hotel in Gloucester Street. Cracks have been injected with epoxy resin using syringes. The epoxy resin leaves a peak around each hole which will be ground down to a smooth surface. The wall will then be repainted. This process actually makes the wall stronger than it was originally.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.

Images, UC QuakeStudies

The old Railway Station clock tower on Moorhouse Avenue with plywood and steel reinforcement covering two sides, and a crane hanging over top. The brickwork suffered extensive cracking during the earthquake making it in need of reinforcement. The clock has stopped at around 16:35, the time of the earthquake.