Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Barbeque at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Anglican and Catholic churches will unite today, holding services with cathedral bells tolling throughout the country in remembrance of those who died in the Christchurch earthquake.
The 4th of September 2010 Mw 7.1 Darfield (Canterbury) earthquake had generated significant ground shaking within the Christchurch Central Business District (CBD). Despite the apparently significant shaking, the observed structural damage for pre-1970s reinforced concrete (RC) buildings was indeed limited and lower than what was expected for such typology of buildings. This paper explores analytically and qualitatively the different aspects of the "apparent‟ good seismic performance of the pre-1970s RC buildings in the Christchurch CBD, following the earthquake reconnaissance survey by the authors. Damage and building parameters survey result, based on a previously established inventory of building stock of these non-ductile RC buildings, is briefly reported. From an inventory of 75 buildings, one building was selected as a numerical case-study to correlate the observed damage with the non-linear analyses. The result shows that the pre-1970s RC frame buildings performed as expected given the intensity of the ground motion shaking during the Canterbury earthquake. Given the brittle nature of this type of structure, it was demonstrated that more significant structural damage and higher probability of collapse could occur when the buildings were subjected to alternative input signals with different frequency content and duration characteristics and still compatible to the seismicity hazard for Christchurch CBD.
Student Army leader Sam Johnston and Patsy Te Are lighting a flame to signify the presence of God at the Christchurch Earthquake Memorial Service in Hagley Park.
Church bells will ring worldwide ring for Christchurch today as tens of thousands of people attend today's National memorial service for the victims for the Christchurch earthquake.
Lyttelton Port is still only operating at 40 percent of its full capacity, nine days after the Christchurch earthquake, but the Port company says its core services are all working and within a week it will be almost at full strength.
Students eating lunch at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
Earthquake Recovery Minister Jerry Brownlee, Prime Minister John Key, and Vice-Chancellor Rod Carr at the Community Engagement Awards 2011.
Students eating lunch at the Ohoka/Mandeville Showgrounds where mechanical Engineer students are having their lectures following the 2011 earthquake.
The sequence of earthquakes that has greatly affected Christchurch and Canterbury since September 2010 has again demonstrated the need for seismic retrofit of heritage unreinforced masonry buildings. Commencing in April 2011, the damage to unreinforced stone masonry buildings in Christchurch was assessed and recorded with the primary objective being to document the seismic performance of these structures, recognising that they constitute an important component of New Zealand’s heritage architecture. A damage statistics database was compiled by combining the results of safety evaluation placarding and post-earthquake inspections, and it was determined that the damage observed was consistent with observations previously made on the seismic performance of stone masonry structures in large earthquakes. Details are also given on typical building characteristics and on failure modes observed. Suggestions on appropriate seismic retrofit and remediation techniques are presented, in relation also to strengthening interventions that are typical for similar unreinforced stone masonry structures in Europe.
The region in and around Christchurch, encompassing Christchurch city and the Selwyn and Waimakariri districts, contains more than 800 road, rail, and pedestrian bridges. Most of these bridges are reinforced concrete, symmetric, and have small to moderate spans (15–25 m). The 22 February 2011 moment magnitude (Mw) 6.2 Christchurch earthquake induced high levels of localized ground shaking (Bradley and Cubrinovski 2011, page 853 of this issue; Guidotti et al. 2011, page 767 of this issue; Smyrou et al. 2011, page 882 of this issue), with damage to bridges mainly confined to the central and eastern parts of Christchurch. Liquefaction was evident over much of this part of the city, with lateral spreading affecting bridges spanning both the Avon and Heathcote rivers.
None
A photograph of the crowds at the National Memorial for the victims of the 22 February 2011 earthquake. The service was held in Hagley Park on 18 March 2011.
Members of the New Zealand Search and Rescue (USAR) team in Latimer Square. After the 22 February 2011 earthquake, emergency service agencies set up their headquarters in Latimer Square.
Members of the Singapore Civil Defence Force outside a tent in Latimer Square. After the 22 February 2011 earthquake, emergency service agencies set up their headquarters in Latimer Square.
A team of Fire Service and Search and Rescue personnel using a crane to check the Forsyth Barr building for people trapped by the 22 February 2011 earthquake. A sign reading, "Help" has been stuck to a window in the floor below.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.
A earthquake simulation structure built at the College of Engineering, it is designed to demonstrate a retrofit of seismic strengthening to a structure.