A photograph captioned by BeckerFraserPhotos, "A view from the BNZ building in Cathedral Square, looking west".
Photograph captioned by BeckerFraserPhotos, "The Clarendon Tower under deconstruction, viewed from Cathedral Square. The Regent Theatre site is in the foreground".
The south side of the damaged cathedral, with boarded up windows. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.
Colour photograph of the ChristChurch Cathedral bells in the Tuning Shop at Taylor's Bell Foundry, Loughborough, United Kingdom, during an open afternoon on Sunday 30 September 2012.
None
A photograph of the damaged ChristChurch Cathedral.
A photograph of the Chalice in Cathedral Square.
A photograph of the damaged ChristChurch Cathedral.
A photograph of the damaged ChristChurch Cathedral.
A photograph of the damaged ChristChurch Cathedral.
Damage to the Cathedral of the Blessed Sacrament.
Damage to the Cathedral of the Blessed Sacrament.
Photograph captioned by BeckerFraserPhotos, "The Grant Thornton building in Cathedral Square being readied for deconstruction".
Photograph captioned by BeckerFraserPhotos, "Lowering a platform from the PricewaterhouseCoopers Building on Armagh Street at sunset, viewed from Cathedral Square".
The north side of the cathedral with its boarded-up windows. Shipping containers have been placed next to the cathedral to protect the street from falling rubble. The Citizens' Memorial stands to the right.
The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access.
Photograph captioned by BeckerFraserPhotos, "Millennium Hotel, Cathedral Square, with a set of stairs from the BNZ bank under demolition being craned from the building".
The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access.
The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access.
The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access.
The front of Christ Church Cathedral showing its broken tower. Bracing has been placed on the front wall to limit further damage. Security fences have been placed around the cathedral to restrict access.
Damage to the front of the Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the Cathedral.
The former mayor of Christchurch, Gary Moore, speaking to a woman at the Rally for the Cathedral in Cranmer Square. The rally protested the proposed demolition of the ChristChurch Cathedral.
A photograph captioned by BeckerFraserPhotos, "Detail of the roof of ChristChurch Cathedral. Taken from up high in the BNZ Building".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Back on the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Front on the new technical design for the Cathedral Rose Window".
A photograph of components of a model of the ChristChurch Cathedral being built from LEGO by Sam Butcher. Sam comments "Fixing a large variety of bits that were wrong/annoying/cheating (not purist) about the last model. The new one is set AFTER the Feb 22 earthquake. This newer, and much stronger model is also completely modular for easier transport. Obviously still a WIP, I'm currently waiting for a pretty large bricklink order at the moment, and will probably need to place a couple more after that too. Side of the new technical design for the Cathedral Rose Window".
Photograph captioned by BeckerFraserPhotos, "The Government Life building in Cathedral Square. This will be a dirty demolish (nothing salvaged as the building has extensive use of asbestos)".
Photograph captioned by BeckerFraserPhotos, "Cranes working on the Clarendon Tower and the Grant Thornton building, viewed from Cathedral Square".
Photograph captioned by BeckerFraserPhotos, "Looks as if they are building a platform for the high reach to work on the Grant Thornton building. Cathedral Square".