
Photograph captioned by BeckerFraserPhotos, "Clarendon Tower (left), Westpac Bank (centre), Grant Thornton building (white right of the Westpac in the distance), ANZ Bank (white with vertical stripes below the Grant Thornton), BNZ bank (red), and Holiday Inn (right) all under demolition, viewed from Alice in Videoland".
A photograph of street art on Dyers Pass Road at the Bromley wood and demolition yard, Silvan Salvage. The artwork depicts a tree on the left and tag writing on the right. The blue text says "Teaching old logs new tricks" and the white text says "The Silvan Salvage".
Photograph captioned by BeckerFraserPhotos, "The city blocks encompassed by Manchester Street, Gloucester Street, Latimer Square and Hereford Street are amongst those with the most demolished buildings in the city centre at the moment".
An aerial photograph captioned by BeckerFraserPhotos, "Central city blocks bounded by Colombo Street, Hereford Street, Cashel Street, and High Streets".
A photograph captioned by BeckerFraserPhotos, "The basement of the Louis Vuitton Building on the corner of Colombo Street and Cathedral Square, exposed now the building has been demolished. The Christ Church Cathedral can be seen in the background".
The progressive damage and subsequent demolition of unreinforced masonry (URM) buildings arising from the Canterbury earthquake sequence is reported. A dataset was compiled of all URM buildings located within the Christchurch CBD, including information on location, building characteristics, and damage levels after each major earthquake in this sequence. A general description of the overall damage and the hazard to both building occupants and to nearby pedestrians due to debris falling from URM buildings is presented with several case study buildings used to describe the accumulation of damage over the earthquake sequence. The benefit of seismic improvement techniques that had been installed to URM buildings is shown by the reduced damage ratios reported for increased levels of retrofit. Demolition statistics for URM buildings in the Christchurch CBD are also reported and discussed. VoR - Version of Record
Photograph captioned by BeckerFraserPhotos, "People at the cordon on the corner of Durham and St Asaph Street, soldiers watching by. In the background is the Environment Court building at 83 Armagh Street, formerly the Canterbury Society of Arts. This building was added to the CERA demolitions list on 5 March 2012".
An entry from Jennifer Middendorf's blog for 23 December 2012 entitled, "Pallets and pop-up tearooms".
A post on the NZ Raw blog written by Mark Lincoln on 3 March 2011. Mark says, "Sydenham Church - this is the one that was demolished and then suddenly everyone started asking why it was demolished - somewhere along the line there was a communication error and a demolition company knocked down the church without speaking to the Heritage Trust".
A photograph captioned by BeckerFraserPhotos, "Peter Majendie, in the middle of his installation '185 Empty Chairs', which remembers the 185 who died as a result of the 22nd February earthquake. The chairs are different so that you can find a chair to remind you in some way of the people who died. Peter told me about the important paintings of chairs, such as Van Gogh and Gaugin's paintings of chairs and the drawing of Dickens's Chair published above his obituary that influenced his decision to remember the lost lives with chairs".
A photograph of the former site of Westende Jewellers and Alva Rados, on the corner of Manchester Street and Worcester Street. The building was badly-damaged in the 4 September earthquake and was demolished soon afterwards. A two-storey building was built on the site and completed in July 2012. The building then had to be removed when the decision was made to widen Manchester Street as part of the draft transport plan for central Christchurch. The photograph was modelled after an image taken by Ian McGregor from Fairfax Media in September 2010.
An aerial photograph captioned by BeckerFraserPhotos, "Central city blocks bounded by Colombo Street, Hereford Street, Cashel Street, and High Street".
A pile of rubble from a demolished building on Worcester Street. In the background, the partially demolished Warners Hotel can be seen as well as the Novotel and the PricewaterhouseCoopers Building in the distance. A digger and long-reach excavator can also be seen.
An aerial photograph of the Christchurch central city near Cashel and High Streets. The photograph has been captioned by BeckerFraserPhotos, "The dense collection of buildings surrounding the Hotel Grand Chancellor with the two cranes being used for the demolition. What little of the street is visible running horizontally across the photograph is Hereford Street".
Photograph captioned by BeckerFraserPhotos, "The view from the top of Alice in Videoland towards Poplar Lane, showing how little is left there. Twisted Hop had a 'make safe' status at the time of this picture, now changed to demolish".
An aerial photograph of the Copthorne Hotel on Colombo Street. The photograph has been captioned by BeckerFraserPhotos, "When the PricewaterhouseCoopers building is demolished, the Copthorne Central Hotel will be alone on the block".
An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "Central city blocks bounded by Colombo Street, Hereford Street, Cashel Street and High Streets".
An aerial photograph of the Christchurch CBD. The photograph has been captioned by BeckerFraserPhotos, "This photograph shows the many tall CBD buildings, with the Hotel Grand Chancellor under demolition in the centre of the photograph. The street in the foreground running up the photograph from left to right is Lichfield Street with the old Bus Exchange clearly visible".
A photograph of the former site of Westende Jewellers and Alva Rados, on the corner of Manchester Street and Worcester Street. The building was badly-damaged in the 4 September earthquake and was demolished soon afterwards. A two-storey building was built on the site and completed in July 2012. The building then had to be removed when the decision was made to widen Manchester Street as part of the draft transport plan for central Christchurch. The photograph was modelled after an image taken by Ian McGregor from Fairfax Media in September 2010.
A photograph submitted by Gaynor James to the QuakeStories website. The description reads, "DTZ building going, 20 July 2011. A small crowd watches the demolition …There is an eerie silence- no excited buzz – people watching yet another part of their history turning into rubble. The wrecking ball, delicately positioned, drops and is followed by the cracking and rending of floor after floor and the debris tumbles down … It starts to clear and an extraordinary sight greets us. Hundreds and hundreds of sheets of paper drift down like giant confetti.".
A girl decorating the chalkboard sign at Gap Filler's "Film in the Gap!" project. The chalkboard outlines the programme for the evening of April 6th, 2011, reading, "Gap Filler: 1st - 10th of April. Free live music and films from 5pm onwards. 5: Radius Kink, 6: Runaround Sue, 7: films: NZ Shorts - 2Cars, 1 Night, Tama Tu, + Forgotten Silver. Bring - cushion, chair, blanket, picnic. Coffee from 4:30pm daily. Ex demolition site. Please be safety aware. Proper footwear must be worn!".
A girl decorating the chalkboard sign at Gap Filler's "Film in the Gap!" project. The chalkboard outlines the programme for the evening of April 6th, 2011, reading, "Gap Filler: 1st - 10th of April. Free live music and films from 5pm onwards. 5: Radius Kink, 6: Runaround Sue, 7: films: NZ Shorts - 2Cars, 1 Night, Tama Tu, + Forgotten Silver. Bring - cushion, chair, blanket, picnic. Coffee from 4:30pm daily. Ex demolition site. Please be safety aware. Proper footwear must be worn!".
A chalkboard sign outlining the programme for the evening of April 10th, 2011 at Gap Filler's "Film in the Gap!" project. The sign reads, "Gap Filler: 1st - 10th of April. Free live music and films from 5pm onwards. 5pm: Plasticine Heroes, I gave These Guys 5 Bucks, 6pm: The Eastern, 7pm: Film - Candyman. Bring - cushion, chair, blanket, picnic. Coffee from 4:30pm daily. Ex demolition site. Please be safety aware. Proper footwear must be worn!". The sign was stuck to the rear wall of Mitre 10 in Beckenham.
Two men converse on the site of Gap Filler's "Film in the Gap!" project. Behind them is a chalkboard sign outlining the programme for the evening of April 2nd, 2011. The sign reads, "Gap Filler: 1st - 10th of April. Free live music and films from 6pm onwards. Saturday: 5pm: The Captain Willis Trio, 6pm: Ed Muzik, 7pm: The Cracks in Everything, 8pm: Film - 4 Houses, 4 Decades (Christchurch Architecture). All welcome! Bring a blanket or cushion. Ex demolition site. Please be safety aware. Proper footwear must be worn!".
A chalkboard sign outlining the programme for the evening of April 8th, 2011 at Gap Filler's "Film in the Gap!" project. The sign reads, "Gap Filler: 1st - 10th of April. Free live music and films from 5pm onwards. 5pm: Mundi, 6pm: Lindon Puffin, 7pm: Film - Draquila (90mins). Bring - cushion, chair, blanket, picnic. Coffee from 4:30pm daily. Ex demolition site. Please be safety aware. Proper footwear must be worn!". The sign is stuck to the rear wall of Mitre 10 in Beckenham.
A chalkboard paper sign outlining the programme for the evening of April 1st, 2011 at Gap Filler's "Film in the Gap!" project. The sign reads, "Gap Filler: 1st - 10th of April. Free live music and films from 6pm onwards. 6 - Daren Tatom, 7 - The Blues Professor, 8 - Film 'Gordonia'.....Bring a blankie and a cushion. Ex demolition site. Please be safety aware. Proper footwear must be worn!". The sign is stuck to the rear wall of Mitre 10 in Beckenham, facing inwards to the site of the project.
The Manchester Courts building was a heritage building located in central Christchurch (New Zealand) that was damaged in the Mw 7.1 Darfield earthquake on 4 September 2010 and subsequently demolished as a risk reduction exercise. Because the building was heritage listed, the decision to demolish the building resulted in strong objections from heritage supporters who were of the opinion that the building had sufficient residual strength to survive possible aftershock earthquakes. On 22 February 2011 Christchurch was struck by a severe aftershock, leading to the question of whether building demolition had proven to be the correct risk reduction strategy. Finite element analysis was used to undertake a performance-based assessment, validating the accuracy of the model using the damage observed in the building before its collapse. In addition, soil-structure interaction was introduced into the research due to the comparatively low shear wave velocity of the soil. The demolition of a landmark heritage building was a tragedy that Christchurch will never recover from, but the decision was made considering safety, societal, economic and psychological aspects in order to protect the city and its citizens. The analytical results suggest that the Manchester Courts building would have collapsed during the 2011 Christchurch earthquake, and that the collapse of the building would have resulted in significant fatalities.
Two children running across the empty lot in Beckenham that housed Gap Filler's "Film in the Gap!" project. Behind them is a chalkboard sign outlining the programme for the evening of April 2nd, 2011. The sign reads, "Gap Filler: 1st - 10th of April. Free live music and films from 6pm onwards. Saturday: 5pm: The Captain Willis Trio, 6pm: Ed Muzik, 7pm: The Cracks in Everything, 8pm: Film - 4 Houses, 4 Decades (Christchurch Architecture). All welcome! Bring a blanket or cushion. Ex demolition site. Please be safety aware. Proper footwear must be worn!".
An aerial photograph of the IRD Building in the Christchurch central city and the surrounding area. The photograph has been captioned by BeckerFraserPhotos, "There are many empty sites in this part of the CBD. The street running up the photograph from the left to the right is Cashel Street. The empty site left of centre with the trees is where St John's Church has been demolished. To the left of the IRD building, is the site of the CTV Building".
The research presented in this thesis investigated the environmental impacts of structural design decisions across the life of buildings located in seismic regions. In particular, the impacts of expected earthquake damage were incorporated into a traditional life cycle assessment (LCA) using a probabilistic method, and links between sustainable and resilient design were established for a range of case-study buildings designed for different seismic performance objectives. These links were quantified using a metric herein referred to as the seismic carbon risk, which represents the expected environmental impacts and resource use indicators associated with earthquake damage during buildings’ life. The research was broken into three distinct parts: (1) a city-level evaluation of the environmental impacts of demolitions following the 2010/2011 Canterbury earthquake sequence in New Zealand, (2) the development of a probabilistic framework to incorporate earthquake damage into LCA, and (3) using case-study buildings to establish links between sustainable and resilient design. The first phase of the research focused on the environmental impacts of demolitions in Christchurch, New Zealand following the 2010/2011 Canterbury Earthquake Sequence. This large case study was used to investigate the environmental impact of the demolition of concrete buildings considering the embodied carbon and waste stream distribution. The embodied carbon was considered here as kilograms of CO2 equivalent that occurs on production, construction, and waste management stage. The results clearly demonstrated the significant environmental impacts that can result from moderate and large earthquakes in urban areas, and the importance of including environmental considerations when making post-earthquake demolition decisions. The next phase of the work introduced a framework for incorporating the impacts of expected earthquake damage based on a probabilistic approach into traditional LCA to allow for a comparison of seismic design decisions using a carbon lens. Here, in addition to initial construction impacts, the seismic carbon risk was quantified, including the impacts of seismic repair activities and total loss scenarios assuming reconstruction in case of non-reparability. A process-based LCA was performed to obtain the environmental consequence functions associated with structural and non-structural repair activities for multiple environmental indicators. In the final phase of the work, multiple case-study buildings were used to investigate the seismic consequences of different structural design decisions for buildings in seismic regions. Here, two case-study buildings were designed to multiple performance objectives, and the upfront carbon costs, and well as the seismic carbon risk across the building life were compared. The buildings were evaluated using the framework established in phase 2, and the results demonstrated that the seismic carbon risk can significantly be reduced with only minimal changes to the upfront carbon for buildings designed for a higher base shear or with seismic protective systems. This provided valuable insight into the links between resilient and sustainable design decisions. Finally, the results and observations from the work across the three phases of research described above were used to inform a discussion on important assumptions and topics that need to be considered when quantifying the environmental impacts of earthquake damage on buildings. These include: selection of a non-repairable threshold (e.g. a value beyond which a building would be demolished rather than repaired), the time value of carbon (e.g. when in the building life the carbon is released), the changing carbon intensity of structural materials over time, and the consideration of deterministic vs. probabilistic results. Each of these topics was explored in some detail to provide a clear pathway for future work in this area.