Search

found 2497 results

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Ascot TV. This has relocated further south on Colombo Street. Apparently their building on Cranford Street was also severely damaged. Note: these photos were taken on a cellphone; mind the qu...

Images, eqnz.chch.2010

The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. A second hand dealer store. This is next to Penny Lane which had to relocate down the street. Note: these photos were taken on a cellphone; mind the quality.

Research papers, University of Canterbury Library

Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.

Audio, Radio New Zealand

Te Pae, Christchurch's near $450 million convention centre, has been officially opened this afternoon with a pōwhiri and unveiling by Mayor Lianne Dalziel and Minister Megan Woods. Billed as a legacy for the city, it replaces the old centre which was demolished following the Canterbury earthquakes. Niva Chittock is at the ceremony and joins Lisa with the details.

Images, UC QuakeStudies

A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.

Images, UC QuakeStudies

A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.

Images, UC QuakeStudies

A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.

Images, UC QuakeStudies

An excavator bunching up scrap metal as part of efforts to clear the site of the demolished Hillary and Marshall Limited building on Manchester Street. A pile of scrapped wooden components can be seen at the back of the site, and a pile of masonry is visible in the foreground.

Images, UC QuakeStudies

A photograph submitted by Raymond Morris to the QuakeStories website. The description reads, "The New Zealand Express Co. Ltd. building (Manchester Courts) built in 1906 on the corner of Manchester and Hereford Sts. In its time it was Christchurch’s tallest office building. This painting is from the Raymond Morris Collection of earthquake demolished buildings.".

Images, UC QuakeStudies

A photograph of the site of a demolished building on the corner of Bealey Avenue and Victoria Street. Wire fencing has been placed around the site as a cordon. Signs on the fence indicate that many of the businesses which were in the area have moved and are still open.

Videos, UC QuakeStudies

A video of an interview with Zac Cassels, the co-owner of the Cassels & Sons Brewery bar, about the preparations for the bar's opening. The bar is to open in a historic building on Madras Street, despite CERA's plans to demolish the building and build a stadium.

Images, UC QuakeStudies

A digitally manipulated photograph of the sign for the Boulevarde restaurant. The photographer comments, "The title is very appropriate as this restaurant was closed after the February Christchurch earthquake. The area has been cordoned off for ages now and everything will probably be demolished.

Images, UC QuakeStudies

A digitally manipulated image of a broken window on Spicer House. The photographer comments, "One of the office blocks in Christchurch City, New Zealand. As the window has not been fixed I am presuming that this building will be slowly demolished at a later date".

Images, UC QuakeStudies

A photograph looking south down Colombo Street from the intersection of Gloucester Street. In the distance a crane is hanging over Cathedral Square. Below the crane is the partially-demolished tower of the ChristChurch Cathedral. A pile of rubble is sitting in front.