None
Photograph captioned by BeckerFraserPhotos, "The view from the top of Alice in Videoland towards Poplar Lane, showing how little is left there. Twisted Hop had a 'make safe' status at the time of this picture, now changed to demolish".
A photograph looking north out a window of the PricewaterhouseCoopers Building. In the distance there is a pile of rubble from the partially-demolished Pyne Gould Corporation Building on Cambridge Terrace. To the right is the Edmond's Band Rotunda.
A photograph looking north out a window of the PricewaterhouseCoopers Building. In the distance there is a pile of rubble from the partially-demolished Pyne Gould Corporation Building on Cambridge Terrace. To the right is the Edmond's Band Rotunda.
A photograph of a partially-demolished building next to the Team Hutchinson Ford Building on Tuam Street. Bricks and other rubble are piled on the footpath. Wire fences and road cones have been placed on the road as a cordon.
A photograph of a pile of rubble from a partially-demolished building on Tuam Street. The rubble is in front of the Team Hutchinson Ford building. Road cones and a wire fence have been placed on the street in the distance.
A photograph of the collapsed PGC Building, taken from Oxford Terrace across the Avon River. An excavator is sitting on top of the rubble from the building and is working to demolish the part of the building which is still standing.
A photograph of the former site of the house at 466 Oxford Terrace, taken from the site next door. The house was demolished after the land was zoned Red. Wire fencing has been placed around the site as a cordon.
A photograph captioned by BeckerFraserPhotos, "The basement of the Louis Vuitton Building on the corner of Colombo Street and Cathedral Square, exposed now the building has been demolished. The Christ Church Cathedral can be seen in the background".
Revisiting some of my images coming up to our one year anniversary of the 22 February 2011 Christchurch 6.3 earthquake. Blue Jean Cuisine (Old Sydenham Post Office) built in 1911 was badly damaged in the 2011 earthquakes was demolished 2012.
Exactly 2½ years (27/02/11 - 27/08/13) since the Queensland (Australia) SAR team TF1 spray painted this on a concrete fence in Armagh Street. Not many of these signs left now as many buildings have been demolished.
My house (bought in March 2004) till the government procured it in October 2012, is finally being demolished. It will be an empty section in a couple of days, once they rip up the concrete base. Note the rainbow on right.
The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. Ascot TV. This has relocated further south on Colombo Street. Apparently their building on Cranford Street was also severely damaged. Note: these photos were taken on a cellphone; mind the qu...
The September Canterbury earthquake. These pictures were taken of Colombo Street in Sydenham. A lot of masonry in this area has been damaged/fallen down. A second hand dealer store. This is next to Penny Lane which had to relocate down the street. Note: these photos were taken on a cellphone; mind the quality.
Over 900 buildings in the Christchurch central business district and 10,000 residential homes were demolished following the 22nd of February 2011 Canterbury earthquake, significantly disrupting the rebuild progress. This study looks to quantify the time required for demolitions during this event which will be useful for future earthquake recovery planning. This was done using the Canterbury Earthquake Recovery Authority (CERA) demolition database, which allowed an in-depth look into the duration of each phase of the demolition process. The effect of building location, building height, and the stakeholder which initiated the demolition process (i.e. building owner or CERA) was investigated. The demolition process comprises of five phases; (i) decision making, (ii) procurement and planning, (iii) demolition, (iv) site clean-up, and (v) completion certification. It was found that the time required to decide to demolish the building made up majority of the total demolition duration. Demolition projects initiated by CERA had longer procurement and planning durations, but was quicker in other phases. Demolished buildings in the suburbs had a longer decision making duration, but had little effect on other phases of the demolition process. The decision making and procurement and planning phases of the demolition process were shorter for taller buildings, though the other phases took longer. Fragility functions for the duration of each phase in the demolition process are provided for the various categories of buildings for use in future studies.
Te Pae, Christchurch's near $450 million convention centre, has been officially opened this afternoon with a pōwhiri and unveiling by Mayor Lianne Dalziel and Minister Megan Woods. Billed as a legacy for the city, it replaces the old centre which was demolished following the Canterbury earthquakes. Niva Chittock is at the ceremony and joins Lisa with the details.
A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.
A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.
A photograph of the front of the badly-damaged ChristChurch Cathedral. The Rose Window has been removed and steel bracing is holding up the remains of the front facade. A large pile of rubble from the partially-demolished tower can be see to the left.
An excavator bunching up scrap metal as part of efforts to clear the site of the demolished Hillary and Marshall Limited building on Manchester Street. A pile of scrapped wooden components can be seen at the back of the site, and a pile of masonry is visible in the foreground.
A photograph submitted by Raymond Morris to the QuakeStories website. The description reads, "The New Zealand Express Co. Ltd. building (Manchester Courts) built in 1906 on the corner of Manchester and Hereford Sts. In its time it was Christchurch’s tallest office building. This painting is from the Raymond Morris Collection of earthquake demolished buildings.".
The north side of the Christ Church Cathedral with the partially demolished tower visible, a pile of rubble in front. Bracing has been placed up against the front of the building to hold the wall together. The Citizens' Memorial can be seen to the left.
The north side of the Christ Church Cathedral with the partially demolished tower visible, a pile of rubble in front. Bracing has been placed up against the front of the building to hold the wall together. The Citizens' Memorial can be seen to the left.
A photograph of the site of a demolished building on the corner of Bealey Avenue and Victoria Street. Wire fencing has been placed around the site as a cordon. Signs on the fence indicate that many of the businesses which were in the area have moved and are still open.
A photograph captioned by BeckerFraserPhotos, "The painted piano at 636 Ferry Road. This is one of a group of painted pianos which were placed on the sites of demolished building by Gap Filler to enable impromptu and planned neighbourhood concerts".
A video of an interview with Zac Cassels, the co-owner of the Cassels & Sons Brewery bar, about the preparations for the bar's opening. The bar is to open in a historic building on Madras Street, despite CERA's plans to demolish the building and build a stadium.
Cracking below the window of the former Lyttelton Fire Station and Public Library. The photographer comments, "The building at 2 Sumner Road has been sadly damaged by the quake. I was unsure of its future, but now this building has been demolished".
A digitally manipulated photograph of the sign for the Boulevarde restaurant. The photographer comments, "The title is very appropriate as this restaurant was closed after the February Christchurch earthquake. The area has been cordoned off for ages now and everything will probably be demolished.
A digitally manipulated image of a broken window on Spicer House. The photographer comments, "One of the office blocks in Christchurch City, New Zealand. As the window has not been fixed I am presuming that this building will be slowly demolished at a later date".
A photograph looking south down Colombo Street from the intersection of Gloucester Street. In the distance a crane is hanging over Cathedral Square. Below the crane is the partially-demolished tower of the ChristChurch Cathedral. A pile of rubble is sitting in front.