A thumbnail photograph of Whole House Reuse item 352, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A thumbnail photograph of Whole House Reuse item 33, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A thumbnail photograph of Whole House Reuse item 95, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
A thumbnail photograph of Whole House Reuse item 278, cropped for the catalogue. This item was salvaged from 19 Admiral Way in New Brighton as part of the Whole House Reuse project.
Imagine, if you will, that you were born in 1870. Your parents are colonists who journeyed to Christchurch to build a new life for themselves and their family. They’re not rich, but you live comfortably enough in this new country. … Continue reading →
The USAR [Urban Search and Rescue] Teams wrote their findings on the doors when they finished their search of a building. This building was cleared by a team from Queensland, Australia on 27 February 2011.
Built 1858-1865. This is just one end of what was once a very large building. Most of the rest has fallen.
The magnitude 7.1 earthquake that struck Christchurch on 4 September 2010 caused the parapet to topple, taking with it the verandah of this cafe where I had a few coffees.
The magnitude 7.1 earthquake that struck Christchurch on 4 September 2010 caused the parapet to topple, taking with it the verandah of this cafe where I had a few coffees.
This block of shops on Victoria Street was so badly damaged that it had to be demolished following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This block of shops on Victoria Street was so badly damaged that it had to be demolished following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This block of shops on Victoria Street was so badly damaged that it had to be demolished following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
The facade of this shop on Manchester Street was reduced to a heap of rubble during the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This shop at the Colombo Street / Tuam Street corner lost its side wall in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This shop at the Colombo Street / Tuam Street corner lost its side wall in the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This shop caught fire when power restored caused sparks that ignited leaking gas, in the aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Cracks in the parapet of this beautiful Madras Street building that I walk past to / from work everyday; aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Cracks in the parapet of this beautiful Madras Street building that I walk past to / from work everyday; aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
Cracks in the beam of this beautiful Madras Street building that I walk past to / from work everyday; aftermath of the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
I have always meant to go back here and get a shot without cars. thr facade of this building is so quaint iI loved it. Now too late
Red stickered door means that this pub on Madras Street is no-go due to structural damage suffered in the magnitude 7.1 earthquake that hit Christchurch on Saturday 4 September 2010.
There will be some very upset kids this Christmas, as Santa will not be able to deliver their presents; aftermath of the magnitude 7,1 earthquake that struck Christchurch on 4 September 2010.
Part of the parapet fell off from this Burger King outlet on Bealey Ave during the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
A PDF copy of signage for the Places of Tranquillity initiative. Healthy Christchurch lead the collaborative project to create six gardens of beauty and peace to fill in some of the grey demolition sites across Christchurch. The signage promotes the initiative and invites people to register to create tranquil gardens at healthychristchurch.org.nz. From healthychristchurch.org.nz: "Healthy Christchurch is leading this innovative collaboration creating six gardens of beauty and peace to fill in some of the grey demolition sites across Christchurch.These gardens are for peace and tranquillity as well as family and community use with spaces designed for both." "This is a Healthy Christchurch collaboration in partnership with the city's ethnic communities to include their traditions, cultures and spiritual beliefs. This ensures that these communities' voices and presence is more visible in the rebuild of our city. There are three key partners in this collaborative project. Greening the Rubble are providing expertise in temporary site development and project managing the creation. Lincoln University School of Landscape Architecture provided the student competition and are supporting the winning students and their designs into fruition. Community and Public Health (CDHB) provide the overall project management, networks and promotion." "In 2012 Lincoln University School of Landscape Architecture students created 40 beautiful designs for the Places of Tranquillity. Six winning designs were chosen from the 995 votes made online or at the displays at Community and Public Health and the Migrant Centre. The six winners were announced at the Healthy Christchurch Hui on the 31st May 2012. Each winning student received a Certificate and a $50 Scorpio Book Voucher. The awards were presented by Michelle Mitchell, General Manager of the CERA Wellbeing Team."
Predictive modelling provides an efficient means to analyse the coastal environment and generate knowledge for long term urban planning. In this study, the numerical models SWAN and XBeach were incorporated into the ESRI ArcGIS interface by means of the BeachMMtool. This was applied to the Greater Christchurch coastal environment to simulate geomorphological evolution through hydrodynamic forcing. Simulations were performed using the recent sea level rise predictions by the Intergovernmental Panel on Climate Change (2013) to determine whether the statutory requirements outlined in the New Zealand Coastal Policy Statement 2010 are consistent with central, regional and district designations. Our results indicate that current land use zoning in Greater Christchurch is not consistent with these predictions. This is because coastal hazard risk has not been thoroughly quantified during the process of installing the Canterbury Earthquake Recovery Authority residential red zone. However, the Christchurch City Council’s flood management area does provide an extent to which managed coastal retreat is a real option. The results of this research suggest that progradation will continue to occur along the Christchurch foreshore due to the net sediment flux retaining an onshore direction and the current hydrodynamic activity not being strong enough to move sediment offshore. However, inundation during periods of storm surge poses a risk to human habitation on low lying areas around the Avon-Heathcote Estuary and the Brooklands lagoon.
This report reviews the literature on regeneration requirements of main canopy tree species in Westland. Forests managed for production purposes have to be harvested in an ecologically sustainable way; to maintain their natural character, harvesting should facilitate regeneration of target species and ensure that their recruitment is in proportion to the extent of extraction. The reasons for species establishing at any point in time are unclear; however, they are probably related to the availability of suitable microsites for establishment, the size of the canopy openings formed by disturbance, and whether or not seeds are available at or around the time of the disturbance. Age structures from throughout Westland show that extensive, similar-aged, post-earthquake cohorts of trees are a feature of the region. This suggests that infrequent, massive earthquakes are the dominant coarse-scale disturbance agent, triggering episodes of major erosion and sedimentation and leaving a strong imprint in the forest structure. In other forests, flooding and catastrophic windthrow are major forms of disturbance. The findings suggest that, in general, large disturbances are required for conifer regeneration. This has implications for any sustained yield management of these forests if conifers are to remain an important component. Any harvesting should recognise the importance for tree establishment of: forest floor microsites, such as fallen logs and tree tip-up mounds; and the variable way in which canopy gaps are formed. Harvesting should maintain the 'patchy' nature of the natural forest—large patches of dense conifers interspersed with more heterogeneous patches of mixed species.This is a client report commissioned by West Coast Conservancy and funded from the Unprogrammed Science Advice fund.
Semi-empirical models based on in-situ geotechnical tests have become the standard of practice for predicting soil liquefaction. Since the inception of the “simplified” cyclic-stress model in 1971, variants based on various in-situ tests have been developed, including the Cone Penetration Test (CPT). More recently, prediction models based soley on remotely-sensed data were developed. Similar to systems that provide automated content on earthquake impacts, these “geospatial” models aim to predict liquefaction for rapid response and loss estimation using readily-available data. This data includes (i) common ground-motion intensity measures (e.g., PGA), which can either be provided in near-real-time following an earthquake, or predicted for a future event; and (ii) geospatial parameters derived from digital elevation models, which are used to infer characteristics of the subsurface relevent to liquefaction. However, the predictive capabilities of geospatial and geotechnical models have not been directly compared, which could elucidate techniques for improving the geospatial models, and which would provide a baseline for measuring improvements. Accordingly, this study assesses the realtive efficacy of liquefaction models based on geospatial vs. CPT data using 9,908 case-studies from the 2010-2016 Canterbury earthquakes. While the top-performing models are CPT-based, the geospatial models perform relatively well given their simplicity and low cost. Although further research is needed (e.g., to improve upon the performance of current models), the findings of this study suggest that geospatial models have the potential to provide valuable first-order predictions of liquefaction occurence and consequence. Towards this end, performance assessments of geospatial vs. geotechnical models are ongoing for more than 20 additional global earthquakes.
Despite the relatively low seismicity, a large earthquake in the Waikato region is expected to have a high impact, when the fourth-largest regional population and economy and the high density critical infrastructure systems in this region are considered. Furthermore, Waikato has a deep soft sedimentary basin, which increases the regional seismic hazard due to trapping and amplification of seismic waves and generation of localized surface waves within the basin. This phenomenon is known as the “Basin Effect”, and has been attributed to the increased damage in several historic earthquakes, including the 2010-2011 Canterbury earthquakes. In order to quantitatively model the basin response and improve the understanding of regional seismic hazard, geophysical methods will be used to develop shear wave velocity profiles across the Waikato basin. Active surface wave methods involve the deployment of linear arrays of geophones to record the surface waves generated by a sledge hammer. Passive surface wave methods involve the deployment of two-dimensional seismometer arrays to record ambient vibrations. At each site, the planned testing includes one active test and two to four passive arrays. The obtained data are processed to develop dispersion curves, which describe surface wave propagation velocity as a function of frequency (or wavelength). Dispersion curves are then inverted using the Geopsy software package to develop a suite of shear wave velocity profiles. Currently, more than ten sites in Waikato are under consideration for this project. This poster presents the preliminary results from the two sites that have been tested. The shear wave velocity profiles from all sites will be used to produce a 3D velocity model for the Waikato basin, a part of QuakeCoRE flagship programme 1.
The purpose of this research is to investigate men’s experiences of the 2016 7.8 magnitude Kaikōura earthquake and Tsunami. While, research into the impacts of the earthquake has been conducted, few studies have examined how gender shaped people’s experiences of this natural hazard event. Analysing disasters through a gender lens has significantly contributed to disaster scholarship in identifying the resilience and vulnerabilities of individuals and communities pre- and post-disaster (Fordham, 2012; Bradshaw, 2013). This research employs understandings of masculinities (Connell, 2005), to examine men’s strengths and challenges in responding, recovering, and coping following the earthquake. Qualitative inquiry was carried out in Northern Canterbury and Marlborough involving 18 face-to-face interviews with men who were impacted by the Kaikōura earthquake and its aftermath. Interview material is being analysed using thematic and narrative analysis. Some of the preliminary findings have shown that men took on voluntary roles in addition to their fulltime paid work resulting in long hours, poor sleep and little time spent with family. Some men assisted wives and children to high ground then drove into the tsunami zone to check on relatives or to help evacuate people. Although analysis of the findings is currently ongoing, preliminary findings have identified that the men who participated in the study have been negatively impacted by the 2016 Kaikōura earthquake. A theme identified amongst participants was an avoidance to seek support with the challenges they were experiencing due to the earthquake. The research findings align with key characteristics of masculinity, including demonstrating risky behaviours and neglecting self or professional care. This study suggests that these behaviours affect men’s overall resilience, and thus the resilience of the wider community.
In recent Canterbury earthquakes, structures have performed well in terms of life safety but the estimated total cost of the rebuild was as high as $40 billion. The major contributors to this cost are repair/demolition/rebuild cost, the resulting downtime and business interruption. For this reason, the authors are exploring alternate building systems that can minimize the downtime and business interruption due to building damage in an earthquake; thereby greatly reducing the financial implications of seismic events. In this paper, a sustainable and demountable precast reinforced concrete (RC) frame system in which the precast members are connected via steel tubes/plates or steel angles/plates and high strength friction grip (HSFG) bolts is introduced. In the proposed system, damaged structural elements in seismic frames can be easily replaced with new ones; thereby making it an easily and quickly repairable and a low-loss system. The column to foundation connection in the proposed system can be designed either as fixed or pinned depending on the requirement of strength and stiffness. In a fixed base frame system, ground storey columns will also be damaged along with beams in seismic events, which are to be replaced after seismic events; whereas in a pin base frame only beams (which are easy to replace) will be damaged. Low to medium rise (3-6 storey) precast RC frame buildings with fixed and pin bases are analyzed in this paper; and their lateral capacity, lateral stiffness and natural period are scrutinized to better understand the pros and cons of the demountable precast frame system with fixed and pin base connections.