Search

found 2220 results

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "A digger working on the remains of Gough House with the fragile remains of the wooden heritage building, Shands Emporium (one of Christchurch's oldest retail buildings), still standing on Hereford Street".

Images, eqnz.chch.2010

Demolition of Robertson's Bakery building, Victoria Street, Christchurch. The Chandelier rescue ... Walking into work I saw the building I always wanted to buy (and run as a bookshop, perfumery, shoe shop) - the old Robertson's Bakery getting demolished. But the bigass digger gently reached into the wreckage and saved this chandelier, bringing...

Images, UC QuakeStudies

A photograph taken from the top of the BNZ building. The photograph is captioned by BeckerFraserPhotos, "Clarendon Towers, Rydges Hotel, Grant Thornton, Brannigans Building (under demolition), former Government Life Building and Farmers are the high buildings dominating the view in this picture".

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "Demolition site of the Allan McLean building, on the corner of Colombo Street and Oxford Terrace. The PricewaterhouseCoopers building is behind. The green digger is feeding the yellow concrete muncher while the red digger redistributes the munched up concrete".

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "Clarendon Tower (left), Westpac Bank (centre), Grant Thornton building (white right of the Westpac in the distance), ANZ Bank (white with vertical stripes below the Grant Thornton), BNZ bank (red), and Holiday Inn (right) all under demolition, viewed from Alice in Videoland".

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "People at the cordon on the corner of Durham and St Asaph Street, soldiers watching by. In the background is the Environment Court building at 83 Armagh Street, formerly the Canterbury Society of Arts. This building was added to the CERA demolitions list on 5 March 2012".

Images, UC QuakeStudies

A pile of rubble from a demolished building on Worcester Street. In the background, the partially demolished Warners Hotel can be seen as well as the Novotel and the PricewaterhouseCoopers Building in the distance. A digger and long-reach excavator can also be seen.

Images, UC QuakeStudies

A photograph captioned by BeckerFraserPhotos, "Peter Majendie, in the middle of his installation '185 Empty Chairs', which remembers the 185 who died as a result of the 22nd February earthquake. The chairs are different so that you can find a chair to remind you in some way of the people who died. Peter told me about the important paintings of chairs, such as Van Gogh and Gaugin's paintings of chairs and the drawing of Dickens's Chair published above his obituary that influenced his decision to remember the lost lives with chairs".

Images, UC QuakeStudies

An aerial photograph of the Christchurch central city near Cashel and High Streets. The photograph has been captioned by BeckerFraserPhotos, "The dense collection of buildings surrounding the Hotel Grand Chancellor with the two cranes being used for the demolition. What little of the street is visible running horizontally across the photograph is Hereford Street".

Images, UC QuakeStudies

An aerial photograph of the Christchurch CBD. The photograph has been captioned by BeckerFraserPhotos, "This photograph shows the many tall CBD buildings, with the Hotel Grand Chancellor under demolition in the centre of the photograph. The street in the foreground running up the photograph from left to right is Lichfield Street with the old Bus Exchange clearly visible".

Images, UC QuakeStudies

A photograph submitted by Gaynor James to the QuakeStories website. The description reads, "DTZ building going, 20 July 2011. A small crowd watches the demolition …There is an eerie silence- no excited buzz – people watching yet another part of their history turning into rubble. The wrecking ball, delicately positioned, drops and is followed by the cracking and rending of floor after floor and the debris tumbles down … It starts to clear and an extraordinary sight greets us. Hundreds and hundreds of sheets of paper drift down like giant confetti.".

Images, UC QuakeStudies

An aerial photograph of the IRD Building in the Christchurch central city and the surrounding area. The photograph has been captioned by BeckerFraserPhotos, "There are many empty sites in this part of the CBD. The street running up the photograph from the left to the right is Cashel Street. The empty site left of centre with the trees is where St John's Church has been demolished. To the left of the IRD building, is the site of the CTV Building".

Images, UC QuakeStudies

An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "This photograph shows nearly all of the CBD. The two streets which are prominent in this photograph are Manchester Street on the left and Colombo Street on the right of the photograph. This photograph is from the north, looking towards the southern part of the city. Cathedral Square is about half way up, towards the right. It shows the extent of demolition that has happened already close to the river and near the Manchester/Gloucester Street intersection where there is a lot of bare land surrounding Radio Network House".

Images, UC QuakeStudies

An aerial photograph captioned by BeckerFraserPhotos, "Victoria Square is at the centre of this picture with its green lawns and trees. The bare patch of earth in front s the demolition sites of the Allan McLean building, the Oxford on Avon, and Plunket House. The contract to demolish the Crowne Plaza Hotel has been let, while the fate of the Town Hall is still undecided. The Convention Centre is coming down. On the very bottom, slightly to the right is the Medlab building which is also to be demolished. In the bottom left corner is the PWC building which is also to be demolished".

Research papers, University of Canterbury Library

This poster presents preliminary results of ongoing experimental campaigns at the Universities of Auckland and Canterbury, aiming at investigating the seismic residual capacity of damaged reinforced concrete plastic hinges, as well as the effectiveness of epoxy injection techniques for restoring their stiffness, energy dissipation, and deformation capacity characteristics. This work is part of wider research project which started in 2012 at the University of Canterbury entitled “Residual Capacity and Repairing Options for Reinforced Concrete Buildings”, funded by the Natural Hazards Research Platform (NHRP). This research project aims at gaining a better understanding and providing the main end-users and stakeholders (practitioner engineers, owners, local and government authorities, insurers, and regulatory agencies) with comprehensive evidence-based information and practical guidelines to assess the residual capacity of damaged reinforced concrete buildings, as well as to evaluate the feasibility of repairing and thus support their delicate decision-making process of repair vs. demolition or replacement.

Research papers, The University of Auckland Library

Reinforced concrete buildings that satisfied modern seismic design criteria generally behaved as expected during the recent Canterbury and Kaikoura earthquakes in New Zealand, forming plastic hinges in intended locations. While this meant that life-safety performance objectives were met, widespread demolition and heavy economic losses took place in the aftermath of the earthquakes.The Christchurch central business district was particularly hard hit, with over 60% of the multistorey reinforced concrete buildings being demolished. A lack of knowledge on the post-earthquake residual capacity of reinforced concrete buildings was a contributing factor to the mass demolition.Many aspects related to the assessment of earthquake-damaged reinforced concrete buildings require further research. This thesis focusses on improving the state of knowledge on the post earthquakeresidual capacity and reparability of moderately damaged plastic hinges, with an emphasis on plastic hinges typical of modern moment frame structures. The repair method focussed on is epoxy injection of cracks and patching of spalled concrete. A targeted test program on seventeen nominally identical large-scale ductile reinforced concrete beams, three of which were repaired by epoxy injection following initial damaging loadings, was conducted to support these objectives. Test variables included the loading protocol, the loading rate, and the level of restraint to axial elongation.The information that can be gleaned from post-earthquake damage surveys is investigated. It is shown that residual crack widths are dependent on residual deformations, and are not necessarily indicative of the maximum rotation demands or the plastic hinge residual capacity. The implications of various other types of damage typical of beam and column plastic hinges are also discussed.Experimental data are used to demonstrate that the strength and deformation capacity of plastic hinges with modern seismic detailing are often unreduced as a result of moderate earthquake induced damage, albeit with certain exceptions. Special attention is given to the effects of prior yielding of the longitudinal reinforcement, accounting for the low-cycle fatigue and strain ageing phenomena. A material-level testing program on the low-cycle fatigue behaviour of grade 300E reinforcing steel was conducted to supplement the data available in the literature.A reduction in stiffness, relative to the initial secant stiffness to yield, occurs due to moderate plastic hinging damage. This reduction in stiffness is shown to be correlated with the ductility demand,and a proposed model gives a conservative lower-bound estimate of the residual stiffness following an arbitrary earthquake-type loading. Repair by epoxy injection is shown to be effective in restoring the majority of stiffness to plastic hinges in beams. Epoxy injection is also shown to have implications for the residual strength and elongation characteristics of repaired plastic hinges.

Research papers, The University of Auckland Library

The Canterbury earthquake sequence of 2010-2011 wrought ruptures in not only the physical landscape of Canterbury and Christchurch’s material form, but also in its social, economic, and political fabrics and the lives of Christchurch inhabitants. In the years that followed, the widespread demolition of the CBD that followed the earthquakes produced a bleak landscape of grey rubble punctuated by damaged, abandoned buildings. It was into this post-earthquake landscape that Gap Filler and other ‘transitional’ organisations inserted playful, creative, experimental projects to bring life and energy back into the CBD. This thesis examines those interventions and the development of the ‘Transitional Movement’ between July 2013 and June 2015 via the methods of walking interviews and participant observation. This critical period in Christchurch’s recovery serves as an example of what happens when do-it-yourself (DIY) urbanism is done at scale across the CBD and what urban experimentation can offer city-making. Through an understanding of space as produced, informed by Lefebvre’s thinking, I explore how these creative urban interventions manifested a different temporality to orthodox planning and demonstrate how the ‘soft’ politics of these interventions contain the potential for gentrification and also a more radical politics of the city, by creating an opening space for difference.

Research papers, The University of Auckland Library

High demolition rates were observed in New Zealand after the 2010-2011 Canterbury Earthquake Sequence despite the success of modern seismic design standards to achieve required performance objectives such as life safety and collapse prevention. Approximately 60% of the multi-storey reinforced concrete (RC) buildings in the Christchurch Central Business District were demolished after these earthquakes, even when only minor structural damage was present. Several factors influenced the decision of demolition instead of repair, one of them being the uncertainty of the seismic capacity of a damaged structure. To provide more insight into this topic, the investigation conducted in this thesis evaluated the residual capacity of moderately damaged RC walls and the effectiveness of repair techniques to restore the seismic performance of heavily damaged RC walls. The research outcome provided insights for developing guidelines for post-earthquake assessment of earthquake-damaged RC structures. The methodology used to conduct the investigation was through an experimental program divided into two phases. During the first phase, two walls were subjected to different types of pre-cyclic loading to represent the damaged condition from a prior earthquake, and a third wall represented a repair scenario with the damaged wall being repaired using epoxy injection and repair mortar after the pre-cyclic loading. Comparisons of these test walls to a control undamaged wall identified significant reductions in the stiffness of the damaged walls and a partial recovery in the wall stiffness achieved following epoxy injection. Visual damage that included distributed horizontal and diagonal cracks and spalling of the cover concrete did not affect the residual strength or displacement capacity of the walls. However, evidence of buckling of the longitudinal reinforcement during the pre-cyclic loading resulted in a slight reduction in strength recovery and a significant reduction in the displacement capacity of the damaged walls. Additional experimental programs from the literature were used to provide recommendations for modelling the response of moderately damaged RC walls and to identify a threshold that represented a potential reduction in the residual strength and displacement capacity of damaged RC walls in future earthquakes. The second phase of the experimental program conducted in this thesis addressed the replacement of concrete and reinforcing steel as repair techniques for heavily damaged RC walls. Two walls were repaired by replacing the damaged concrete and using welded connections to connect new reinforcing bars with existing bars. Different locations of the welded connections were investigated in the repaired walls to study the impact of these discontinuities at the critical section. No significant changes were observed in the stiffness, strength, and displacement capacity of the repaired walls compared to the benchmark undamaged wall. Differences in the local behaviour at the critical section were observed in one of the walls but did not impact the global response. The results of these two repaired walls were combined with other experimental programs found in the literature to assemble a database of repaired RC walls. Qualitative and quantitative analyses identified trends across various parameters, including wall types, damage before repair, and repair techniques implemented. The primary outcome of the database analysis was recommendations for concrete and reinforcing steel replacement to restore the strength and displacement capacity of heavily damaged RC walls.