At an event held to thank the Student Volunteer Army, Op Shop's Jason Kerrison signs a shovel representative of the hard work by the students.
At an event held to thank the Student Volunteer Army, Mayor Bob Parker signs a shovel representative of the hard work by the students.
Our city is a repository for the social and historical narrative of our past Each street, wall, facade, interior is an integral part of the people who walked passed them, shopped in them, worked in…
Heritage supporters are hoping that serious earthquake damage wrought upon Christchurch cemeteries will be repaired- but the issue of who funds that work remains unresolved.
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
Christchurch's tourism sector is poised for a strong rebound five years after the Canterbury earthquakes, but tourist operators and leaders say there is still work to do.
Cathederal Square has remained largely untouched by developers since the 2011 earthquake. That is about to change, with work beginning on a series of hotels.
The damaged clock tower on Victoria Street, wrapped and braced to prevent further damage. The photographer comments, "Diamond Jubilee Clock Tower in Christchurch. Its legs wrapped up for protection. Volcanic stone and limestone clock tower with ornate wrought iron work with coloured glass around part of the tower and four clock faces. Clock Tower built in this location to commemorate the Diamond Jubilee of Queen Victoria. Has two white marble plaques and one bronze plaque set on stone work above arches".
Best View - Press "L". After 36 million liters of water mysteriously disappeared from this reservoir on Huntsbury Hill following the February 22nd 6.3 earthquake in Christchurch work has started on repairing it. This image shows just how large the tank is with a work-truck parked inside it. See Video of TV3 News item:
Photograph captioned by Fairfax, "Staff at Halswell New World supermarket work to stock the shelves after the latest big quake".
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work on Hackthorne Road, Cashmere".
Photograph captioned by Fairfax, "Jeanette Stark and co-owner Tony Francis keen to get back to work at Henry Africa's".
The Canterbury earthquakes of 2010 and 2011 caused significant damage and disruption to the city of Christchurch, New Zealand. A Royal Commission was established to report on the causes of building failure as a result of the earthquakes as well as look at the legal and best-practice requirements for buildings in New Zealand Central Business Districts. The Royal Commission made 189 recommendations on a variety of matters including managing damaged buildings after an earthquake, the adequacy of building codes and standards, and the processes of seismic assessments of existing buildings to determine their earthquake vulnerability. In response the Ministry of Business, Innovation and Employment, the agency responsible for administering building regulation in New Zealand, established a work programme to assist with the Canterbury rebuild and to implement the lessons learned throughout New Zealand. The five primary work streams in the programme are: • Facilitating the Canterbury Rebuild • Structural Performance and Design Standards • Geotechnical and structural guidance • Existing Building Resilience • Post Disaster Building Management This paper provides more detail on each of the work streams. There has been significant collaboration between the New Zealand Government and the research community, technical societies, and engineering consultants, both within New Zealand and internationally, to deliver the programme and improve the resilience of the New Zealand built environment. This has presented major challenges for an extremely busy industry in the aftermath of the Canterbury earthquakes. The paper identifies the items of work that have been completed and the work that is still in progress at the time of writing.
Look through the cordon fence, a worker supervising the demoliton work on the Amuri Courts. Another worker and a digger can be seen in the background.
A photograph of an office in the Diabetes Centre. The office furniture has been pushed together to prepare the room for earthquake repair work.
Sam Johnson, Student Volunteer Army Organiser and Opshop's Jason Jerrison at an event held at NZi3 to thank the volunteers for the work being done.
More damage to the Christchurch Chinese Methodist Church following the 22 February earthquake. The church already had its spire removed so restoration work can be carried out.
Vice Chancellor Rod Carr preparing to enter and retrieve his work from the 6th floor of the Registry Building, with an emergency and security staff member.
More damage to the Christchurch Chinese Methodist Church following the 22 February earthquake. The church already had its spire removed so restoration work can be carried out.
The Minister for Earthquake Recovery, Gerry Brownlee, says the recovery process from Canterbury's earthquake is moving quickly, despite strong aftershocks yesterday setting back repair work.
Photograph captioned by Fairfax, "Christchurch Earthquake.The RNZN Rhys Heaven-Smith Able Marine Tech 2nd Class at work in Lyttelton".
Photograph captioned by Fairfax, "Christchurch earthquake. Chef Sam Tait is back at work at the Megawatt Cafe, despite losing his home".
Deputy Vice-Chancellor Ian Town preparing to enter and retrieve his work from the 6th floor of the Registry Building, with an emergency and security staff member.
Liam takes a work trip to Christchurch. Iris gets a part-time job but before she can start she gets a call from the school about Billy's reaction to an earthquake drill.
A section of street around the damaged Canterbury Provincial Council Buildings has been cordoned off. Remediation work is being carried out on parts while other section remain covered.
Deputy Vice-Chancellor Ian Town preparing to enter and retrieve his work from the 6th floor of the Registry Building, with an emergency and security staff member.
A temporary work place for the Fire Service has been set up in front of the Christchurch City Fire Station. Part of their original building has been fenced off.
Looking into the Red Zone through an observation window at the east end of Re:Start mall. Inside is a worker, and ongoing demolition work being carried out.
A temporary work place for the Fire Service has been set up in fron of the Christchurch City Fire Station. Part of their original building has been fenced off.
After an appeal from the families of Christchurch earthquake victims, a third lawyer is being appointed to the Royal Commission, to work specifically with them.