Following the 2010 and 2011 earthquakes Christchurch is undergoing extensive development on the periphery of the city. This has been driven in part by the large numbers of people who have lost their homes. Prior to the earthquakes, Christchurch was already experiencing placeless subdivisions and now these are being rolled out rapidly thanks to the efficiency of a formula that has been embraced by the Council, developers and the public alike. However, sprawling subdivisions have a number of issues including inefficient land use, limited housing types, high dependence on motor vehicles and low levels of resilience and no sense of place. Sense of place is of particular interest due to its glaring absence from new subdivisions and its growing importance in the literature. Research shows that sense of place has benefits to our feeling of belonging, well-being, and self-identity, particularly following a disaster. It improves the resilience and sustainability of our living environment and fosters a connection to the landscape thereby making us better placed to respond to future changes. Despite these benefits, current planning models such as new urbanism and transit-oriented design tend to give sense of place a low priority and as a result it can get lost. Given these issues, the focus of this research is “can landscape driven sense of place drive subdivision design without compromising on other urban planning criteria to produce subdivisions that address the issues of sprawl, as well as achieving the benefits associated with a strong sense of place that can improve our overall quality of life?” Answering this question required a thorough review of current urban planning and sense of place literature. This was used to critique existing subdivisions to gain a thorough understanding of the issues. The outcomes of this led to extensive design exploration which showed that, not only is it possible to design a subdivision with sense of place as the key driver but by doing this, the other urban planning criteria become easier to achieve.
A graphic estimating costs for major projects in the Christchurch Central Recovery Plan.
A graphic listing major facilities planned to be built by Christchurch City Council.
A page banner promoting an article titled, "New Regent Street plans on track".
An infographic illustrating building height limits outlined in the draft Central City Plan.
Word clouds comparing the draft Central City Plan to Share an Idea contributions.
A photograph of a speaker giving a presentation on the Sumner master plan.
An infographic showing retail floor size limits in the draft Central City Plan.
Christchurch's plan to have 20,000 people living in the city centre within the next few years looks increasingly set to fail. Official figures from last year show the Central Business District's population hovering at around 7000, stubbornly lower than before the earthquakes struck more than a decade ago. Reporter Anan Zaki has more.
A video of a presentation by Associate Professor Leonardo Duenas-Osorio of Rice University in Texas on "On-going and planned activities of the TCLEE Lifeline Systems Interdependence Committee". The presentation was delivered at the learning forum on Interdependencies of Lifeline Systems as part of the University of Canterbury's Lifeline Week.
A pdf copy of a post from the One Voice Te Reo Kotahi blog. The post is titled, "Transition to Regeneration Plan - Have Your Say!". Note that video material originally included on the page has been removed for display reasons.
The purpose of this assessment is to compare records of known inanga spawning sites in the waterways of Ōtautahi Christchurch from before and after the Canterbury earthquakes, with particular emphasis on information used in the design of planning methods for spawning site protection.
Please contact supervisor Lin Roberts at Lincoln University to request a copy of this dissertation to read.Cities around the world are becoming greener, with many striving to make their cities as green as possible. Christchurch was devastated by an Earthquake in 2011, which resulted in many fatalities. Though this impacted the city negatively, this sad event was used as an opportunity for the broken city to become a better one. The Christchurch City Council (CCC) ran an exercise called ‘Share an Idea’, which asked the public what they wanted the new city to look like. The main theme extrapolated by researchers was that people wanted the city to be greener. A draft plan was created by the CCC but was deemed not good enough and replaced by a new plan called the Blueprint Plan created by the government. Through the process of public consultation to the finalized plan and the implementation of the finalized plan, there were many changes made to the inclusion of nature into Central Christchurch’s urban regeneration. The aim of this research is to assess the role of nature in the urban regeneration of Christchurch, by evaluating the recovery process, and comparing the level of greenness the public wanted by looking at what they said in Share an Idea, and then seeing how that translated into the proposed plans, and then finally looking at what is being implemented.
We're joined now by the Earthquake Recovery Minister, Gerry Brownlee - who is in Christchurch.
There were angry scenes at a Christchurch meeting last night as residents tried to stop a dump for earthquake debris being built in their suburb.
Christchurch businesses, councils, MPs and individuals have banded together to turn the rubble of the Canterbury earthquake green.
The creation of a new unit within the Canterbury Earthquake Recovery Authority to oversee the rebuilding of central Christchurch is being welcomed by business leaders.
Christchurch has a big bill to contend with, if it still wants the multi-use stadium that's been in the works since the earthquakes 11 years ago. The problem-plagued project has blown out another $150 million, meaning it's going to cost $680 million and counting. The finish date's been pushed out too - to April 2026. Christchurch City Council's punting the hefty decision making back to the ratepayers. The options - increase the budget, scale back the project, or halt work altogether. Tessa Guest reports, and Crusaders CEO Colin Mansbridge talks to Lisa Owen.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A brick wall has fallen from this house, exposing the rooms within and leaving a pile of rubble in front. The ceiling has slumped and is held up with jacks. The photographer comments, "This was probably the result of the shallower February Christchurch earthquake rather than the bigger September one".
The Canterbury Earthquake Sequence (CES) was a monumental natural disaster in Aotearoa New Zealand that permanently altered Ōtautahi Christchurch’s geography. Following the earthquake events, the central city was in need of recovery and regeneration to return to being an enhanced and thriving space. The Christchurch Central Recovery Plan (CCRP) was developed to outline the aspirations, visions and challenges associated with rebuilding the central city. The purpose of this research was to review the current status of the CCRP, with a particular focus on identifying the projects that have or have not progressed. This research sought to understand which aspects of a post-disaster recovery plan have contributed to successful post-disaster recovery in Ōtautahi Christchurch. Secondary data was used to identify successes and failures in this regard. The results highlighted the top-down approach taken by the central government in the recovery process and a notable lack of community engagement throughout the CCRP. However, there were some projects and aspirations that have enabled Ōtautahi Christchurch to become a thriving city and express its regenerated identity at a local, national, and international level.
A map showing the location of major urban projects planned by Orion in Christchurch.
A photograph of community members at a meeting to discuss the Sumner master plan.
A photograph of a planning meeting for the Info Gap temporary outdoor display space.
A photograph of community members at a meeting to discuss the Sumner master plan.
A photograph of community members at a meeting to discuss the Sumner master plan.
A map showing the location of major rural projects planned by Orion in Canterbury.
A poster created by Empowered Christchurch to advertise their submission to the CERA Draft Transition Recovery Plan on social media.The poster reads, "Submission, CERA Draft Transition Recovery Plan. Future Insurability. In an article in the New Zealand Herald of 5 November 2014, the CEO of IAG refers to cooperation with the NZ Government on a strategic intent in 2011 to avoid depopulation of Christchurch. Now that the ICNZ has signalled its intention to withdraw from high-risk areas and the CCC also plans to redefine the boundaries of the city so as to exclude properties below the Mean High Water Springs. We ask whether a 'recovery' involves abandoning people once the insurance and bank sectors have managed a retreat? We need a city that is driven by the people that live in it, and enabled by a bureaucracy that accepts and mitigates risks, rather than transferring them to the most vulnerable of its residents".
A photograph of a workstation in Crack'd for Christchurch's workshop. The workstation includes pieces of broken china, a pair of cutters for breaking up china, a plastic container to hold china pieces, and two mosaic plans. One of the plans has a piece of mesh laid over the top. The other is being used to lay out the mosaic.Crack'd for Christchurch comments, "Marie begins the very first flower. It is so difficult and time consuming that we are all in despair. Will this take forever? No-one is getting paid and we all have jobs and lives in some chaos thanks to the earthquakes."
The 11 frame cartoon strip tells a story about planning for a new Christchurch city post-earthquake. After filling the plan with every possible thing he can think of the planner puts the artist in an empty corner and the whole thing is delivered into a black hole that represents 'The real world'. Quantity: 1 digital cartoon(s).