The Diamond Harbour Herald, August 2011, number 148
Articles, UC QuakeStudies
An electronic copy of the August 2011 edition of the Diamond Harbour Herald.
An electronic copy of the August 2011 edition of the Diamond Harbour Herald.
An electronic copy of the September 2013 edition of the Diamond Harbour Herald.
An electronic copy of the March 2013 edition of the Diamond Harbour Herald.
An electronic copy of the June 2013 edition of the Diamond Harbour Herald.
An electronic copy of the March 2014 edition of the Diamond Harbour Herald.
An electronic copy of the December 2013 edition of the Diamond Harbour Herald.
An electronic copy of the December 2010 edition of the Diamond Harbour Herald.
An electronic copy of the April 2014 edition of the Diamond Harbour Herald.
An electronic copy of the August 2012 edition of the Diamond Harbour Herald.
An electronic copy of the November 2011 edition of the Diamond Harbour Herald.
An electronic copy of the February 2012 edition of the Diamond Harbour Herald.
The agency in charge of fixing earthquake damaged pipes and roads in Christchurch was last night issued an excessive noise notice after keeping residents awake in the early hours.
Planning in New Zealand in 2014 has largely been dominated by housing and urban development, potential local government and legislative reforms, and water issues. This volume’s peer reviewed research, which combines Issues 1 and 2, focuses on these issues, but with perspectives and issues that are outside the mainstream. In our lead research article, John Ryks and his co-authors review the opportunities from Treaty settlements and legislative provisions and challenges for Māori participation in urban development, such as the balancing of matawaka and mana whenua perspectives. Water issues are picked up by Ronlyn Duncan and Phil Holland who each take constructively critical views toward some currently well-regarded approaches to resolutions. We have reflective and somewhat contrasting contributions from two highly respected semi-retired planners, Malcolm Douglass (FNZPI) and Derek Hall, that challenge aspects of New Zealand’s current approach to planning. In our outreach part of this Volume we include the response of some political parties to questions put to them about planning by LPR team member Nicole Read. Finally, Lincoln University appears to have turned a corner after the earthquakes, at least in the planning programmes.
A Packing Case on Wheels Local and General. Star, Issue 6789, 8 May 1900, Page 3 A weird-looking vehicle has recently been seen travelling through the streets of the city much to the amusement and …
Shows various sized boats for the 'tsunami-conscious' as show homes in Christchurch. Context: There is anxiety about the potential for a local source tsunami but the Christchurch City Council says on its website that there will be no time to issue an official warning for a local source tsunami. Quantity: 1 digital cartoon(s).
‘Housing affordability’ has been a term used to refer to a problem that arises when the costs of housing are seen as being unreasonably high in relation to incomes. In the United Kingdom and Australia the local town planning systems have been used to address housing affordability issues. This response in countries that share New Zealand’s town and country planning history raised the question for this research of the local government response to housing affordability issues in the city of Christchurch, New Zealand. This research was undertaken during the fifth year after the 2010/2011 Canterbury earthquake series. Research conducted by the Centre for Housing Research Aotearoa New Zealand and the New Zealand Productivity Commission present quite different pictures of the housing affordability problem, suggest different solutions and indicate different roles for levels of government, the community housing sector and the housing market. The research undertaken for this dissertation aimed to address the question of the role of the state, through the lense of a local response to housing affordability issues, in the context of a central government response focused on land supply and reforming the Resource Management Act 1991.
Group case study report prepared for lecturers Ton Buhrs and Roy Montgomery by students of ERST 635 at Lincoln University, 2013.The New Zealand Government’s decision to establish a unitary authority in the Auckland Region has provided much of the context and impetus for this review of current governance arrangements in the Canterbury region, to determine whether or not they are optimal for taking the communities of greater Christchurch into the future. A number of local governance academics, as well as several respected political pundits, have prophesised that the Auckland ‘Super City’ reforms of 2009 will have serious implications and ramifications for local governance arrangements in other major cities, particularly Wellington and Christchurch. Wellington councils have already responded to the possibility of change by undertaking a series of reports on local governance arrangements, as well as a major review led by Sir Geoffrey Palmer, to investigate options for governance reform. Alongside these developments, the Christchurch earthquakes beginning in September 2010 have raised a myriad of new and complex governance issues, which may or may not be able to be addressed under the status quo, while the replacement of Regional Councillors’ with centrally-appointed Commissioners is suggestive of government dissatisfaction with current arrangements. With these things in mind, the research group has considered local government in Canterbury and the greater Christchurch area in the wider governance context. It does not limit discussion to only the structure of local government in Canterbury but rather, as the brief (Appendix 1) indicates, considers more broadly the relationship between central, regional, and local tiers of government, as well as the relationship between local government and local communities.
The devastating magnitude M6.3 earthquake, that struck the city of Christchurch at 12:51pm on Tuesday 22 February 2011, caused widespread damage to the lifeline systems. Following the event, the Natural Hazard Research Platform (NHRP) of New Zealand funded a short-term project “Recovery of Lifelines” aiming to: 1) coordinate the provision of information to meet lifeline short-term needs; and to 2) facilitate the accessibility to lifelines of best practice engineering details, along with hazards and vulnerability information already available from the local and international scientific community. This paper aims to briefly summarise the management of the recovery process for the most affected lifelines systems, including the electric system, the road, gas, and the water and wastewater networks. Further than this, the paper intends to discuss successes and issues encountered by the “Recovery of Lifelines” NHRP project in supporting lifelines utilities.
Recovery from disasters is a significant issue faced by all countries in the world at various times. Governments, including central and local governments, are the key actors regarding post-disaster recovery because they have the authority and responsibility to rescue affected people and recover affected areas (Yang, 2010). Planning is a critical step in the recovery process and provides the basis for defining a shared vision for recovery, clear objectives and intended results. Subsequently, the concept of collaborative planning and ‘build back better’ are highly desirable in recovery planning. However, in practice, these concepts are difficult to achieve. A brief description of the recovery planning in Christchurch City following the Canterbury earthquakes 2011 is provided as an example and comparison. This research aims to analyse the planning process to develop a post-disaster recovery plan in Indonesia using Mataram City’s recovery plan following the Lombok Earthquakes 2018 as the case study. It will emphasise on the roles of the central and local governments and whether they collaborate or not, and the implications of decentralisation for recovery planning. The methodology comprised a combination of legislation analysis and semi-structure interviews with the representatives of the central and local governments who were involved in the planning process. The results indicate that there was no collaboration between the central and local governments when developing the recovery plan, with the former tend to dominate and control the planning process. It is because there are regulatory and institutional problems concerning disaster management in Indonesia. In order to improve the implementation of disaster management and develop a better recovery plan, some recommendations are proposed. These include amendments the disaster management law and regulations to provide a clear guideline regarding the roles and responsibilities of both the central and local governments. It is also imperative to improve the capacity and capability of the local governments in managing disaster.
This report focuses on the Waimakariri District Council's approach to earthquake recovery which was developed as an Integrated, Community-based Recovery Framework. This approach has been held up as exemplary in a number of fora and has received a great deal of interest and support both nationally and internationally. It has evolved as a result of the September earthquake and the thousands of aftershocks that have followed, along with the regulatory changes that have impacted on building safety and land availability since, but it builds on a set of pre-existing competencies and a well-established organisational culture that focusses on: * Working with communities and each other; * Keeping people informed; * Doing better everyday; * Taking responsibility; * Acting with integrity, honesty and trust. The report identifies, and speaks to, three themes or tensions drawn from either the disaster/emergency management literature or actual cases of recovery practice observed here in Canterbury over the last 2 years. These themes are the: 1. unique position of local government to undertake integrated or ‘holistic’ recovery work with community at the centre, versus the lack of clarity around both community and local government’s role in disaster recovery; 2. general consensus that good local government-community relationships are crucial to recovery processes, versus the lack of practical advice on how best to engage, and engage with, communities post-disaster; and 3. balancing Business as Usual (BaU) with recovery issues.Ministry of Civil Defence and Emergency Management.
A series of earthquakes has forced Christchurch to re-plan and rebuild. Discussions about rebuilding strategies have emphasized the intention of making it a city for the future, sustainable and vibrant. This paper discusses the relationship between microclimate and urban culture in Christchurch based upon the concept of urban comfort. It explores the relationships between environment, people and culture to help understand the local requirements for urban landscape design. In this paper we claim that cultural requirements also should be taken into account when looking for sustainable strategies. A distinctive feature of this research is its focus on the way people are adapting to both surviving prequake and new post‐quake environments. Preliminary findings from the first year of field work using participant observation and 61 in‐depth interviews with Christchurch residents are presented. The interviews were carried out in a variety of urban settings including: established sites (places sustaining relatively little damage) and emerging sites (those requiring rebuilding) during 2011‐2012. Evidence from the interviews highlight future challenges regarding sustainability and urban comfort issues. Post‐quake Christchurch presents a remarkable opportunity to design an urban landscape which provides environmental, economic, social and cultural sustainability. However, to achieve successful outcomes it is fundamental to respond to the local culture. Field data suggest that the strong connections between urban and rural settings present in local culture, lifestyle and landscape generate a particular aesthetic and recreation preference for urban spaces, which should be considered in the urban landscape design strategies.
PHIL TWYFORD to the Minister for Building and Construction: Does he agree with Mainfreight founder and Chairman Bruce Plested that housing is a “social disgrace”, that the market cannot sort out this problem, and that real leadership and intestinal fortitude is needed now? JONATHAN YOUNG to the Minister of Finance: What reports has he received on real after-tax wages rising in New Zealand? CHRIS HIPKINS to the Minister of Education: Will she apologise on behalf of the Government for the flawed handling of the Canterbury school mergers and closures after the 2011 earthquakes; if not, why not? ANDREW BAYLY to the Minister for Building and Construction: What progress has the Government made in improving the tenancy laws and guidance for dealing with the problem of methamphetamine testing and contamination? CARMEL SEPULONI to the Associate Minister for Social Housing: What motels has the Government purchased in response to the increased emergency housing demand, and how much has this cost? RON MARK to the Prime Minister: Does he stand by all his statements on the Clutha-Southland electorate office issue even if facts known to him make doing so extraordinarily difficult? MAUREEN PUGH to the Minister of Corrections: How is Budget 2017 investing in rehabilitation and reintegration outcomes for offenders? Hon DAVID PARKER to the Minister of Local Government: Does she agree with the Prime Minister’s answer yesterday that drinking-water contamination in Havelock North was “about local government performance and overseeing ratepayer-funded assets whose purpose is to deliver clean and healthy water to its local people. The extensive inquiry into that incident was warranted by widespread illness in the area ... it is about local body performance in overseeing their clean water system”? BRETT HUDSON to the Minister of Local Government: What recent announcements has she made regarding Wellington’s resilience to natural hazards? JULIE ANNE GENTER to the Minister of Transport: Will the Government start building rail to the airport sooner if Auckland hosts the next America’s Cup regatta or will Aucklanders still have to wait 30 years? STUART NASH to the Minister of Police: Does she have any concerns about any of the results of the New Zealand Police Workplace Survey 2017; if so, what in particular? ALASTAIR SCOTT to the Associate Minister of Education: What recent announcements has he made to improve school infrastructure in the Wairarapa?
This thesis addresses the topic of local bond behaviour in RC structures. The mechanism of bond refers to the composite action between deformed steel reinforcing bars and the surrounding concrete. Bond behaviour is an open research topic with a wide scope, particularly because bond it is such a fundamental concept to structural engineers. However, despite many bond-related research findings having wide applications, the primary contribution of this research is an experimental evaluation of the prominent features of local bond behaviour and the associated implications for the seismic performance of RC structures. The findings presented in this thesis attempt to address some structural engineering recommendations made by the Canterbury Earthquakes Royal Commission following the 2010-2011 Canterbury (New Zealand) earthquake sequence. A chapter of this thesis discusses the structural behaviour of flexure-dominated RC wall structures with an insufficient quantity of longitudinal reinforcement, among other in situ conditions, that causes material damage to predominantly occur at a single crack plane. In this particular case, the extent of concrete damage and bond deterioration adjacent to the crack plane will influence the ductility capacity that is effectively provided by the reinforcing steel. As a consequence of these in situ conditions, some lightly reinforced wall buildings in Christchurch lost their structural integrity due to brittle fracture of the longitudinal reinforcement. With these concerning post-earthquake observations in mind, there is the underlying intention that this thesis presents experimental evidence of bond behaviour that allows structural engineers to re-assess their confidence levels for the ability of lightly reinforced concrete structures to achieve the life-safety seismic performance objective the ultimate limit state. Three chapters of this thesis are devoted to the experimental work that was conducted as the main contribution of this research. Critical details of the experimental design, bond testing method and test programme are reported. The bond stress-slip relationship was studied through 75 bond pull-out tests. In order to measure the maximum local bond strength, all bond tests were carried out on deformed reinforcing bars that did not yield as the embedded bond length was relatively short. Bond test results have been presented in two separate chapters in which 48 monotonic bond tests and 27 cyclic bond tests are presented. Permutations of the experiments include the loading rate, cyclic loading history, concrete strength (25 to 70 MPa), concrete age, cover thickness, bar diameter (16 and 20 mm), embedded length, and position of the embedded bond region within the specimen (close or far away to the free surface). The parametric study showed that the concrete strength significantly influences the maximum bond strength and that it is reasonable to normalise the bond stress by the square-root of the concrete compressive strength, √(f'c). The generalised monotonic bond behaviour is described within. An important outcome of the research is that the measured bond strength and stiffness was higher than stated by the bond stress-slip relationship in the fib Model Code 2010. To account for these observed differences, an alternative model is proposed for the local monotonic bond stress-slip relationship. Cyclic bond tests showed a significant proportion of the total bond degradation occurs after the loading cycle in the peak bond strength range, which is when bond slip has exceeded 0.5 mm. Subsequent loading to constant slip values showed a linear relationship between the amount of bond strength degradation and the log of the number of cycles that were applied. To a greater extent, the cyclic bond deterioration depends on the bond slip range, regardless of whether the applied load cycling is half- or fully-reversed. The observed bond deterioration and hysteretic energy dissipated during cyclic loading was found to agree reasonably well between these cyclic tests with different loading protocols. The cyclic bond deterioration was also found to be reasonably consistent exponential damage models found in the literature. This research concluded that the deformed reinforcing bars used in NZ construction, embedded in moderate to high strength concrete, are able to develop high local bond stresses that are mobilised by a small amount of local bond slip. Although the relative rib geometry was not varied within this experimental programme, a general conclusion of this thesis is that deformed bars currently available in NZ have a relative rib bearing area that is comparatively higher than the test bars used in previous international research. From the parametric study it was found that the maximum monotonic bond strength is significant enhanced by dynamic loading rates. Experimental evidence of high bond strength and initial bond stiffness generally suggests that only a small amount of local bond slip that can occur when the deformed test bar was subjected to large tension forces. Minimal bond slip and bond damage limits the effective yielding length that is available for the reinforcing steel to distribute inelastic material strains. Consequently, the potential for brittle fracture of the reinforcement may be a more problematic and widespread issue than is apparent to structural engineers. This research has provided information that improve the reliability of engineering predictions (with respect to ductility capacity) of maximum crack widths and the extent of bond deterioration that might occur in RC structures during seismic actions.
An exceedingly large 'Gerry' Brownlee, the Minister for Earthquake Recovery, rises from a chair, holding a briefcase labeled 'CERA' and calling for 'Bob' Parker, the mayor of Christchurch. The thin Parker was flattened against Brownlee's enormous rear, when Brownlee sat on the chair. Brownlee and Parker had a strained relationship, with the government taking an increasing amount of control in local decision making. After ongoing assurances by Parker that Christchurch City Council would meet all of International Accreditation New Zealand's requirements on issuing building consents, Brownlee announced in June 2013 without Parker's prior knowledge that the authority had withdrawn its accreditation. Quantity: 1 digital cartoon(s).
The recent Christchurch earthquakes provide a unique opportunity to better understand the relationship between pre-disaster social fault-lines and post-disaster community fracture. As a resident of Christchurch, this paper presents some of my reflections on the social structures and systems, activities, attitudes and decisions that have helped different Canterbury ‘communities’ along their road to recovery, and highlights some issues that have, unfortunately, held us back. These reflections help answer the most crucial question asked of disaster scholarship: what can recovery agencies (including local authorities) do - both before and after disaster - to promote resilience and facilitate recovery. This paper – based on three different definitions of resilience - presents a thematic account of the social recovery landscape. I argue that ‘coping’ might best be associated with adaptive capacity, however ‘thriving’ or ‘bounce forward’ versions of resilience are a function of a community’s participative capacity.
The New Zealand Kellogg Rural Leaders Programme develops emerging agribusiness leaders to help shape the future of New Zealand agribusiness and rural affairs. Lincoln University has been involved with this leaders programme since 1979 when it was launched with a grant from the Kellogg Foundation, USA.At 4.35am on 4th September 2010, Canterbury was hit by an earthquake measuring 7.1 on the Richter scale. On 22nd February 2011 and 13th June 2011 a separate fault line approximately 35km from the first, ruptured to inflict two further earthquakes measuring 6.3 and 6.0 respectively. As a direct result of the February earthquake, 181 people lost their lives. Some commentators have described this series of earthquakes as the most expensive global insurance event of all time. These earthquakes and the more than 7000 associated aftershocks have had a significant physical impact on parts of Canterbury and virtually none on others. The economic, social and emotional impacts of these quakes spread across Canterbury and beyond. Waimakariri district, north of Christchurch, has reflected a similar pattern, with over 1400 houses requiring rebuild or substantial repair, millions of dollars of damage to infrastructure, and significant social issues as a result. The physical damage in Waimakiriri District was predominately in parts of Kaiapoi, and two small beach settlements, The Pines and Kairaki Beach with pockets elsewhere in the district. While the balance of the district is largely physically untouched, the economic, social, and emotional shockwaves have spread across the district. Waimakariri district consists of two main towns, Rangiora and Kaiapoi, a number of smaller urban areas and a larger rural area. It is considered mid-size in the New Zealand local government landscape. This paper will explore the actions and plans of Waimakiriri District Council (WDC) in the Emergency Management Recovery programme to provide context to allow a more detailed examination of the planning processes prior to, and subsequent to the earthquakes. This study looked at documentation produced by WDC, applicable legislation and New Zealand Emergency Management resources and other sources. Key managers and elected representatives in the WOC were interviewed, along with a selection of governmental and nongovernmental agency representatives. The interview responses enable understanding of how central Government and other local authorities can benefit from these lessons and apply them to their own planning. It is intended that this paper will assist local government organisations in New Zealand to evaluate their planning processes in light of the events of 2010/11 in Canterbury and the lessons from WDC.
"Prior to the devastating 2010-2011 Canterbury earthquakes, the city of Christchurch was already exhibiting signs of a housing affordability crisis. The causes and symptoms were similar to those being experienced in Auckland, but the substantial damage to the housing stock caused by the earthquakes added new dimensions and impetus to the problem. Large swathes of the most affordable housing stock in the east of the city were effectively destroyed by the earthquakes. In itself this would have pushed the mean house price upwards, but compounding problems exacerbated the situation. These include the price effects of reduced supply of both rented and owned housing and increased demand from both displaced residents and an influx of rebuild workers. The need for additional temporary housing while repairs were undertaken and the associated insurance pay-outs bidding up rents with improved rental returns leading to increased interest in property investment. Land supply constraints and consenting issues inhibiting the build of new housing and political infighting and uncertainty regarding the future of parts of the city leading to a flight of development activity to peripheral locations and adjoining local authorities. Concerns that the erosion of the city council rating base combined with inadequacy of insurance cover for infrastructure will lead to large rates increases, increased development costs and reduced amenities and services in future years. These and other issuers will be elaborated on in this paper with a view to exploring the way forward for affordable housing Christchurch City."
SHANE ARDERN to the Minister of Finance: What reports has he received on the economy? DAVID SHEARER to the Prime Minister: Does he expect all his Ministers to comply with the responsibilities set out in the Cabinet Manual? JONATHAN YOUNG to the Minister of Justice: What steps is the Government taking to improve public services in law and order? GRANT ROBERTSON to the Minister of Local Government: Will he take the same approach to compliance with the Cabinet Manual as Minister for Local Government as he did as Minister for ACC? DENIS O'ROURKE to the Minister for Canterbury Earthquake Recovery: Does he stand by all his recent statements? EUGENIE SAGE to the Prime Minister: Does he stand by his statement, “I am not going to do something silly with the Department of Conservation estate”? Hon DAVID CUNLIFFE to the Minister for Economic Development: What, if any, are the capital costs, write-downs and redundancy costs expected from the merger of the Ministry of Economic Development with the Ministry of Science and Innovation, Department of Labour and Department of Building and Housing? Dr PAUL HUTCHISON to the Minister of Health: What progress is being made in relation to the Government’s key result of increasing infant immunisation rates and reducing the incidence of rheumatic fever? Hon MARYAN STREET to the Minister of Health: Does he support Pharmac’s provisional decision to engage Auckland company, Pharmaco, to be the sole supplier of new diabetic meters? PESETA SAM LOTU-IIGA to the Minister for Social Development: Has she received any reports on the Future Focus welfare changes in 2010? Hon PHIL GOFF to the Minister of Foreign Affairs: Have New Zealand heads of mission overseas been recalled to a meeting in Wellington on 2 April, and if so what is the cost of holding this meeting? Dr KENNEDY GRAHAM to the Minister for Climate Change Issues: Is he concerned by a recent report of an international team of scientists that, even with a two degree celsius rise in average global temperature, future generations could face sea levels of up to 12 to 22 metres higher than at present?
1. Rt Hon WINSTON PETERS to the Prime Minister: Has he had time to read and digest the judgement of Justice Miller regarding the Crafar farm deal; if so, does he stand by his comments made in the House yesterday? 2. Hon DAVID PARKER to the Minister for Land Information: Does he believe he and the Government have conducted themselves competently and appropriately in relation to the decision to approve the purchase of the Crafar farms by a foreign buyer; if not, what did they do wrong? 3. JONATHAN YOUNG to the Minister of Finance: What reports has the Government issued on the economy? 4. JACINDA ARDERN to the Minister for Social Development: Does she have confidence that Work and Income meets their own "case management approach" expectations? 5. JAN LOGIE to the Minister for Social Development: Does she have concerns that changes to the eligibility for the Training Incentive Allowance are causing single parent beneficiaries to consider working in the sex industry? 6. Dr CAM CALDER to the Minister of Health: What improvements have there been to services for patients as a result of greater collaboration between District Health Boards? 7. Hon CLAYTON COSGROVE to the Minister for State Owned Enterprises: Does he still intend to sell 49 per cent of the four State-owned energy companies? 8. JAMI-LEE ROSS to the Minister of Local Government: What analysis has he received on rate increases across New Zealand's 78 councils following the enactment of new local government legislation in 2002? 9. Hon LIANNE DALZIEL to the Minister for Canterbury Earthquake Recovery: Does he stand by the part of his statement of 27 January, announcing the extension of the red zone offer to retirement villages, that letters of offer would be sent to each resident and CERA would work with village owners as quickly as possible to ensure the residents are assisted; if not, why not? 10. Dr RUSSEL NORMAN to the Minister for Land Information: Did Overseas Investment Office officials meet with Chinese political consul Cheng Lei late last year; if so, did they discuss Shanghai Pengxin's bid for the Crafar farms? 11. CLARE CURRAN to the Minister of Broadcasting: What is the name of the documentary which was withheld in the papers released publicly by NZ On Air titled "Records of decisions made at working group meeting"? 12. Hon TAU HENARE to the Minister for Economic Development: What progress has he made declaring the Volvo Ocean Race Stopover a major event under the Major Events Management Act 2007?
Environmental assessment in New Zealand is governed by the provisions of the Resource Management Act (RMA) 1991. The Act requires persons wishing to undertake certain activities to apply for resource consent from their local or regional council - a procedure termed the Resource Consent Process. The key component of a resource consent application is an Assessment of Environmental Effects (AEE) report; a statement of the environmental effects of a proposed activity. Problems arise when environmental assessments are complicated by uncertain and abnormal circumstances such as natural hazards. Natural hazards (including earthquakes, floods, tsunami, and coastal erosion) can be catastrophic to an environment. If hazards are not avoided or successfully mitigated, they can result in serious consequences to proposed development and to the environment which the proposal relates. The aim of this study is to assess the adequacy of the resource consent process (as outlined in the Resource Management Act 1991) for dealing with proposed development affected by natural hazards. This study reviews the context of the resource consent process for dealing with natural hazards to identify potential issues in the assessment process. Guidance criteria for assessing natural hazards (termed Natural Hazard Assessment) are developed to evaluate against two resource consent applications affected by natural hazards. The findings of the consent process review and case study evaluation are discussed to determine the adequacy of the consent process for dealing with natural hazards. From the review of the consent process it was evident that the process has a number of problems for accommodating natural hazards into the assessment. Although many important traits are provided for in the process, such traits are not always reflected in environmental assessments. Evaluation of two resource consent applications against the process of Natural Hazard Assessment (NHA) showed that these consent applications did not adequately detail key information relating to natural hazards. Many problems evident in these applications were not amended by the Consent Authorities in the review process and subsequently consent was granted to information-deficient applications. Problematic issues identified in this study include: • A distinct lack of guidance (legal or otherwise) for the applicant and Consent Authority regarding the boundaries of inclusion of an effect; • Deficiencies in planning documents are reflected in AEE reports, the review of the consent application and in the end-decision; • Under-utilisation of "experts" throughout the consent process; • Minimal identification and account for the degree of uncertainty throughout the consent process; • Resource consents are being granted even though information in consent applications, and the means for assessing the information is deficient. These issues reflect that decisions are not being made based on all elements involved in a potential hazard. Subsequently, the resource consent process is not adequate for dealing with all aspects of natural hazards. The Natural Hazard Assessment process provides educated assessment criteria to assess development affected by natural hazards. By accounting for the problems evident in the consent process, the introduction of a three-tier identification, risk and vulnerability assessment, and evaluation process to account for uncertainties, Natural Hazard Assessment provides a platform for a thorough assessment of natural hazards. The application of the principles of Natural Hazard Assessment to the consent applications affected by natural hazards showed that many key issues were not covered in the assessment under the consent process. The nature of a natural event is that one may not occur in a given region over many lifetimes, however they will occur at some stage and planning and environmental assessment needs to provide for the associated hazards. Implementation of Natural Hazard Assessment is needed to help provide answers for the problems experienced in the resource consent process. Natural Hazard Assessment would allow decision-makers to make informed judgements on the situation at hand, leading to better planning and land-use options. Change to current practice is needed, as following the current path of environmental assessment will be the hazard in the end.