Search

found 363 results

Images, Alexander Turnbull Library

Text at top left reads 'Earthquake... aftershock... or "new event"... one thing remains constant...' Below is a snail with 'EQC payments' printed on its shell. Context - This is a reference to the problems that Christchurch people are having in getting payments from the EQC (Earthquake Commission) Disgruntled tradespeople who are owed hundreds of thousands of dollars by EQC are considering legal action. Remaining unpaid can mean that companies may have to consider laying people off. The Amalgamated Workers Union says delays in EQC payments for housing repair work in quake-hit Christchurch are building to a crisis point. Two versions of this cartoon are available Quantity: 2 digital cartoon(s).

Research papers, University of Canterbury Library

In order to provide information related to seismic vulnerability of non-ductile reinforced concrete (RC) frame buildings, and as a complementary investigation on innovative feasible retrofit solutions developed in the past six years at the University of Canterbury on pre-19170 reinforced concrete buildings, a frame building representative of older construction practice was tested on the shake table. The specimen, 1/2.5 scale, consists of two 3-storey 2-bay asymmetric frames in parallel, one interior and one exterior, jointed together by transverse beams and floor slabs. The as-built (benchmark) specimen was first tested under increasing ground motion amplitudes using records from Loma Prieta Earthquake (California, 1989) and suffered significant damage at the upper floor, most of it due to lap splices failure. As a consequence, in a second stage, the specimen was repaired and modified by removing the concrete in the lap splice region, welding the column longitudinal bars, replacing the removed concrete with structural mortar, and injecting cracks with epoxy resin. The modified as-built specimen was then tested using data recorded during Darfield (New Zealand, 2010) and Maule (Chile, 2010) Earthquakes, with whom the specimen showed remarkably different responses attributed to the main variation in frequency content and duration. In this contribution, the seismic performance of the three series of experiments are presented and compared.

Research papers, The University of Auckland Library

The 2010–2011 Canterbury earthquakes, which involved widespread damage during the February 2011 event and ongoing aftershocks near the Christchurch Central Business District, left this community with more than $NZD 40 billion in losses (~20 % GDP), demolition of approximately 60 % of multi-storey concrete buildings (3 storeys and up), and closure of the core business district for over 2 years. The aftermath of the earthquake sequence has revealed unique issues and complexities for the owners of commercial and multi-storey residential buildings in relation to unexpected technical, legal, and financial challenges when making decisions regarding the future of their buildings impacted by the earthquakes. The paper presents a framework to understand the factors influencing post-earthquake decisions (repair or demolish) on multi-storey concrete buildings in Christchurch. The study, conducted in 2014, includes in-depth investigations on 15 case-study buildings using 27 semi-structured interviews with various property owners, property managers, insurers, engineers, and government authorities in New Zealand. The interviews revealed insights regarding the multitude of factors influencing post-earthquake decisions and losses. As expected, the level of damage and repairability (cost to repair) generally dictated the course of action. There is strong evidence, however, that other variables have significantly influenced the decision on a number of buildings, such as insurance, business strategies, perception of risks, building regulations (and compliance costs), and government decisions. The decision-making process for each building is complex and unique, not solely driven by structural damage. Furthermore, the findings have put the spotlight on insurance policy wordings and the paradoxical effect of insurance on the recovery of Christchurch, leading to other challenges and issues going forward.

Images, Alexander Turnbull Library

A signpost pointing 'West' and 'East'. The sign pointing West is intact; that indicating East is broken and barely hanging on to the post. Refers to the condition of Christchurch City after the earthquakes of 2010 and 2011; the western wealthier suburbs were less damaged than the poorer Eastern suburbs. Also, progress on repair and rehabilitation of eastern housing had been slow. The redesign of the city centre seemed to be a western suburb priority which ignored the poverty and misery of living conditions on the east. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

In the top frames two children shout 'four point one', 'three point six', and 'five point two' and in the frame below it is seen that they are responding to bumps in the road as their mother drives through Christchurch streets. Context - The children have become expert at guessing the seismic intensity of earthquakes in Christchurch and are now applying them to bumps in the road. Colour and black and white versions available Quantity: 2 digital cartoon(s).

Images, Alexander Turnbull Library

Maori Party MP for Te Tai Tonga, Rahui Katene' is buried up to her neck in earthquake rubble as she reads a newspaper headline referring to her statement that the aftermath of the earthquake has demonstrated 'racism and ethnic profiling'. Rahui Katene's head is disintegrating and two engineers who are examining the damage decide that 'This can't be repaired, it needs to be condemned'. Rahui Katene says the authorities, who kicked a Christchurch family out of a welfare centre that was set up after the Christchurch earthquake that struck on the 4th September, should apologise for judging them too early and shaming them publicly. Mrs Katene was also concerned about claims that Maori youth were being targeted by police. "I've heard from whanau that in one particular area rangatahi who were volunteering in their community and helping their whanau were accused by police of theft. The whanau are trying to work these issues through with the police, but I'm growing concerned about what appears to be ethnic profiling." Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

A woman says to a builder 'Christchurch people will really appreciate your help to rebuild - What you construct looks like it's already been hit by an earthquake'. They are standing in front of a very shoddily-built cottage and the garden is festooned with litter. Context - After the Christchurch earthquakes there is a huge emphasis on fast rebuilding with the potential for below standard results.. Quantity: 1 digital cartoon(s).

Research papers, University of Canterbury Library

The earthquake engineering community is currently grappling with the need to improve the post-earthquake reparability of buildings. As part of this, proposals exist to change design criteria for the serviceability limit state (SLS). This paper reviews options for change and considers how these could impact the expected repair costs for typical New Zealand buildings. The expected annual loss (EAL) is selected as a relevant measure or repair costs and performance because (i) EAL provides information on the performance of a building considering a range of intensity levels, (ii) the insurance industry refers to EAL when setting premiums, and (iii) monetary losses are likely to be correlated with loss of building functionality. The paper argues that because the expected annual loss is affected by building performance over a range of intensity levels, the definition of SLS criteria alone may be insufficient to effectively limit losses. However, it is also explained that losses could be limited effectively if the loadings standard were to set the SLS design intensity considering the potential implications on EAL. It is shown that in order to achieve similar values of EAL in Wellington and Christchurch, the return period intensity for SLS design would need to be higher in Christchurch owing to differences in local hazard conditions. The observations made herein are based on a simplified procedure for EAL estimation and hence future research should aim to verify the findings using a detailed loss assessment approach applied to a broad range of case study buildings.

Audio, Radio New Zealand

Jim Hay keeps ticking along in a career that's spanned more than 30 years. He's a watchmaker and although he'll be the first to tell you time's just about run out on wrist watches, his skills in clock repairs are in demand since the Christchurch earthquake.

Audio, Radio New Zealand

Work has finally begun dismantling Lancaster Park in Christchurch, six years after it was damaged beyond repair in the February earthquake. It comes at the same time the city's leaders debate what a new stadium could look like and who will pay.

Videos, UC QuakeStudies

A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.

Images, Alexander Turnbull Library

Text reads 'Solution to Christchurch sewage problems?...' A woman, with a roll of toilet paper in her hand, climbs a ladder to a toilet that is positioned on a sewage pipe high above the ground. There are further toilets at intervals on the pipe. Her husband stands in the garden and observes that it is 'Easy to access and easy to repair'. Context - the Christchurch earthquakes and continuing aftershocks have done huge damage to sewage infrastructures which suggests having the pipes above ground as a solution. Quantity: 1 digital cartoon(s).

Images, Alexander Turnbull Library

Shows Christchurch's Anglican cathedral receiving extensive treatment including blood, ambulances, scaffold and signs reading 'save!' In the background Christchurch's Catholic Cathedral says it wants its share of attention as well. Context: The focus of repairing the Christchurch Anglican cathedral appeared to draw focus and resources from the equally historic and damaged Catholic Cathedral. Quantity: 1 digital cartoon(s).

Images, UC QuakeStudies

A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.

Audio, Radio New Zealand

Time is nearly up for owners of on-sold quake damaged properties in Canterbury to apply to claim money for botched repairs. The Government announced last year it would give an ex-gratia payment to home-owners with properties that went over the Earthquake Commission's then cap of $100,000. Today is the last day for applications after the original August deadline was extended due to Covid-19. But there are calls to extend that deadline again, as applications have flooded in over the past month.

Audio, Radio New Zealand

As we approach the tenth anniversary of the Christchurch earthquake there are renewed calls for an inquiry into how Southern Response dealt with Canterbury earthquake claimants. Last year the government set up a support package for those who were short changed by Southern Response for their earthquake repairs. It came after a landmark High Court case found Southern Response misled and deceived Karl and Alison Dodds. Insurance claimants advocate, Ali Jones, says ten years on, lessons haven't been learned from how people were treated by Southern Response. She told RNZ reporter Sally Murphy that dealing with them is hell.

Audio, Radio New Zealand

The Aromaunga Baxters Flowers nursery in Heathcote, Christchurch sits right above the point where the earthquake struck on 22 February 2011. The greenhouses on the steep slopes of the Port Hills, as well as a big old villa and other brick buildings were badly damaged. Ten years on co-owner John Baxter says the earthquake damage is still being repaired, but sales have been boosted by a lack of imported flowers due to Covid-19 restrictions.

Research papers, University of Canterbury Library

One of the most controversial issues highlighted by the 2010-2011 Christchurch earthquake series and more recently the 2016 Kaikoura earthquake, has been the evident difficulty and lack of knowledge and guidelines for: a) evaluation of the residual capacity damaged buildings to sustain future aftershocks; b) selection and implementation of a series of reliable repairing techniques to bring back the structure to a condition substantially the same as prior to the earthquake; and c) predicting the cost (or cost-effectiveness) of such repair intervention, when compared to fully replacement costs while accounting for potential aftershocks in the near future. As a result of such complexity and uncertainty (i.e., risk), in combination with the possibility (unique in New Zealand when compared to most of the seismic-prone countries) to rely on financial support from the insurance companies, many modern buildings, in a number exceeding typical expectations from past experiences at an international level, have ended up being demolished. This has resulted in additional time and indirect losses prior to the full reconstruction, as well as in an increase in uncertainty on the actual relocation of the investment. This research project provides the main end-users and stakeholders (practitioner engineers, owners, local and government authorities, insurers, and regulatory agencies) with comprehensive evidence-based information to assess the residual capacity of damage reinforced concrete buildings, and to evaluate the feasibility of repairing techniques, in order to support their delicate decision-making process of repair vs. demolition or replacement. Literature review on effectiveness of epoxy injection repairs, as well as experimental tests on full-scale beam-column joints shows that repaired specimens have a reduced initial stiffness compared with the undamaged specimen, with no apparent strength reduction, sometimes exhibiting higher displacement ductility capacities. Although the bond between the steel and concrete is only partially restored, it still allows the repaired specimen to dissipate at least the same amount of hysteretic energy. Experimental tests on buildings subjected to earthquake loading demonstrate that even for severe damage levels, the ability of the epoxy injection to restore the initial stiffness of the structure is significant. Literature review on damage assessment and repair guidelines suggests that there is consensus within the international community that concrete elements with cracks less than 0.2 mm wide only require cosmetic repairs; epoxy injection repairs of cracks less and 2.0 mm wide and concrete patching of spalled cover concrete (i.e., minor to moderate damage) is an appropiate repair strategy; and for severe damaged components (e.g., cracks greater than 2.0 mm wide, crushing of the concrete core, buckling of the longitudinal reinforcement) local replacement of steel and/or concrete in addition to epoxy crack injection is more appropriate. In terms of expected cracking patterns, non-linear finite element investigations on well-designed reinforced concrete beam-to-column joints, have shown that lower number of cracks but with wider openings are expected to occur for larger compressive concrete strength, f’c, and lower reinforcement content, ρs. It was also observed that the tensile concrete strength, ft, strongly affects the expected cracking pattern in the beam-column joints, the latter being more uniformly distributed for lower ft values. Strain rate effects do not seem to play an important role on the cracking pattern. However, small variations in the cracking pattern were observed for low reinforcement content as it approaches to the minimum required as per NZS 3101:2006. Simple equations are proposed in this research project to relate the maximum and residual crack widths with the steel strain at peak displacement, with or without axial load. A literature review on fracture of reinforcing steel due to low-cycle fatigue, including recent research using steel manufactured per New Zealand standards is also presented. Experimental results describing the influence of the cyclic effect on the ultimate strain capacity of the steel are also discussed, and preliminary equations to account for that effect are proposed. A literature review on the current practice to assess the seismic residual capacity of structures is also presented. The various factors affecting the residual fatigue life at a component level (i.e., plastic hinge) of well-designed reinforced concrete frames are discussed, and equations to quantify each of them are proposed, as well as a methodology to incorporate them into a full displacement-based procedure for pre-earthquake and post-earthquake seismic assessment.

Images, Alexander Turnbull Library

Shows a carcass that represents the Christchurch Cathedral with many people rushing to try to save it from demolition. Context: the extremely controversial debate about whether the Christchurch Cathedral which was severely damaged in the earthquakes, should be demolished, rebuilt on the same site in the same style or partially demolished and made into a memorial. Quantity: 1 digital cartoon(s).

Research papers, The University of Auckland Library

Following the 2010/2011 Canterbury, New Zealand earthquakes, a detailed door-to-door survey was conducted in the Christchurch region to establish the earthquake performance of lightweight timber-framed residential dwellings with a masonry veneer external cladding system. The post-earthquake survey involved documenting the condition of dwellings in areas that had experienced different levels of earthquake shaking, allowing comparison between the performance of different veneer systems and different shaking intensities. In total, just fewer than 1,100 residential dwellings were inspected throughout the wider Christchurch area. The survey included parameters such as level of veneer damage, type of veneer damage, observed crack widths, and level of repair required. It is concluded that based on observed earthquake performance at the shaking intensities matching or exceeding ultimate limit state loading, the post-1996 veneer fixing details performed satisfactorily and continued use of the detail is recommended without further modification. AM - Accepted Manuscript

Images, Alexander Turnbull Library

The title reads 'Future Christchurch CBD?...' Two people stare at numerous large featureless blocks across the Avon River. One says 'Those buildings look pretty ugly' and the other points out that they are 'just the piles'. Context: The Christchurch City Council is moving to impose urban-design etiquette and avert architectural mistakes such as clashing with the neighbours, glaring corporate colours and the long, blank walls common to most suburban shopping malls. The proposed rules will be overseen by an urban-design panel of four experts drawn from a pool of 12 architects, designers, planners and valuers. Quantity: 1 digital cartoon(s).