EQC's manager for the Canterbury home repair programme, Reid Stiven, respondes to claims of misleading estimates of damage to household foundations from the 2010 and 2011 earthquakes.
Some Christchurch residents are frustrated at the time it's taking to work out what sort of foundations their homes will require when earthquake repairs are carried out.
People who've bought houses in Canterbury since the September 2010 earthquake and are still battling with insurance companies over repairs, have been told that if they want to take the matter to court, today is their last chance. Earthquake claims specialist Lisa Taylor from the law firm Anthony Harper joins us.
Canterbury earthquake victims with the most damaged homes could have to wait more than two and half years for their houses to be fixed - but one owner says her problems are nothing compared to the misery of the Pike River mine disaster.
© 2018 Springer Nature B.V. This study compares seismic losses considering initial construction costs and direct-repair costs for New Zealand steel moment-resisting frame buildings with friction connections and those with extended bolted-end-plate connections. A total of 12 buildings have been designed and analysed considering both connection types, two building heights (4-storey and 12-storey), and three locations around New Zealand (Auckland, Christchurch, and Wellington). It was found that buildings with friction connections required design to a higher design ductility, yet are generally stiffer due to larger beams being required to satisfy higher connection overstrength requirements. This resulted in the frames with friction connections experiencing lower interstorey drifts on most floors but similar peak total floor accelerations, and subsequently incurring lower drift-related seismic repair losses. Frames with friction connections tended to have lower expected net-present-costs within 50 years of the building being in service for shorter buildings and/or if located in regions of high seismicity. None of the frames with friction connections in Auckland showed any benefits due to the low seismicity of the region.
Photograph captioned by Fairfax, "Aerial shot of the fault line that ruptured, causing Saturday's 7.1 earthquake. The fault line ripped across a road which has been repaired".
The company that has the main contract for repairing houses in Christchurch, Fletcher Earthquake Recovery, is assuring taxpayers it's doing everything it can to avoid any fraudulent behaviour.
The chief medical officer of health for the region, Dr Alistair Humphrey, says people carrying out repairs on their earthquake-stricken properties need to be wary of asbestos.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Lyttelton area.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
The repair of Christchurch's earthquake damaged arts centre has revealed details hidden from view for forty years including a badminton court and the site of an old swimming pool.
Tower Insurance has increased the amount it is willing to pay towards repairing an earthquake-damaged Christchurch home, but is still refusing to pay for a more expensive rebuild.
EQC CEO Sid Miller says the agency is currently defending 316 legal cases over the Christchurch earthquakes, and is considering legal action against Fletcher's for its project management of the repairs.
The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.
A little spot of coffee and cheerfulness plus a man up the mast repairing the "bush telegraph" File Ref: CCL-2011-03-17-St Albans-IMG_0387 From the collection of Christchurch City Libraries.
Steel frames are being used to shore the unstable facade of the St John the Baptist Church at Latimer Square while the building is being repaired and strengthened following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
Photograph captioned by Fairfax, "Christchurch Earthquake. Shops on the corner of Cranford Street and Westminster Street were torn down this afternoon as they had been deemed too dangerous after Saturday's earthquake in Christchurch. Lindsay Troo owner of Altron TV repair shop talks about his loss".
The Plumbers industry body says some plumbers helping Christchurch quake victims are struggling to stay afloat, because the Earthquake Commission is not paying out fast enough for emergency repairs.
More than ten weeks after being damaged beyond repair by the Christchurch earthquake, there is still no decision about how or when the Grand Chancellor Hotel will be demolished.
An authority granted by the New Zealand Historic Places Trust, providing the authority to carry out earthquake repair work that may affect archaeological sites within the Christchurch City area.
A message in a bottle, hidden under the floor of a Christchurch home for over fifty years, has been discovered during earthquake repairs and its writer's been tracked down.
A protest is underway outside insurance company Vero's Christchurch's office, with building owners dismayed to be still fighting for earthquake repairs 10 years on. The protest was organised by the owners of an 11 unit apartment block in New Brighton, who says Vero is purposefully delaying progress to wear them down. RNZ's reporter Rachel Graham is at the protest and spoke to Meriana Johnsen
One landscape colour digital photograph taken on 28 April 2012 looking south from Cunningham Terrace, Lyttelton. The photograph shows a homemade figure of Humpty Dumpty with a bandaged head sitting on a fence on top of a retaining wall awaiting repair. Contractor involved in repair work The retaining walls above and below Cunningham Terrace wer...
One landscape colour digital photograph taken on 26 May 2013 on the corner of Norwich Quay and Canterbury Street, Lyttelton. The photograph shows the sites of the Royal Hotel, Shadbolt House, and the Lyttelton Hotel along Norwich Quay. The Wunderbar and the repair and strengthening work underway on the Lyttelton Working Mens Club/The Loons are v...