Search

found 259 results

Images, UC QuakeStudies

A photograph of the earthquake damage to St Paul's-Trinity-Pacific Church on the corner of Cashel and Madras Streets. Large sections of the church have collapsed and the bricks and other rubble have spilled onto the footpath and street in front. Sections of the scaffolding, constructed up the side of the building before the earthquake, have also collapsed.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Canterbury Provincial Chambers Buildings on Durham Street. Large sections of the masonry have collapsed, spilling onto the road. Wire fencing has been placed around the building as a cordon. Scaffolding erected up the side of the building after the 4 September 2010 earthquake has collapsed. In the distance, a crane is parked on the street.

Images, UC QuakeStudies

A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.

Images, UC QuakeStudies

A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.

Images, UC QuakeStudies

A photograph of emergency management personnel examining the back of a building on Tuam Street. Scaffolding has been constructed up the sides of the building and wire fencing has been placed around the back. To the right is a large pile of rubble from other earthquake-damaged buildings. Rubble is also piled up on the side of the road in the distance.

Images, UC QuakeStudies

A photograph of the rubble of the Observatory tower in the South Quad of the Christchurch Arts Centre. The tower collapsed during the 22 February 2011 earthquake. A digger was used to clear the rubble away from the building. Scaffolding constructed around the tower has also collapsed and is amongst the rubble. In the background is a shipping container. A red sticker has been placed on the door to the Physics Building.

Images, UC QuakeStudies

A photograph of the earthquake-damaged Stone Chamber of the Canterbury Provincial Council Buildings on Durham Street North. Large sections of the Chamber have collapsed and the masonry and other rubble has spilled onto the footpath in front. To the left scaffolding constructed up the side of the building has also collapsed and twisted out of shape. Wire fences have been placed along the side of the building as a cordon.

Images, UC QuakeStudies

A photograph of the earthquake-damaged Our City O-Tautahi Building on the corner of Worcester Street and Oxford Terrace. Steel bracing has been placed against the building to secure the brick walls. The bracing is supported by large concrete blocks. Wire fences have also been placed around the bottom of the building as a cordon. Scaffolding has been erected around the tower to the right.

Images, UC QuakeStudies

A photograph of the earthquake damage to the Carlton Hotel on the corner of Papanui Road and Bealey Avenue. The wall of the top storey of the building has crumbled, and bricks have fallen onto the footpath. Wire fencing, road cones, and cordon tape have been placed around the building as a cordon. Scaffolding and steel bracing can be seen against the front of the building.

Images, UC QuakeStudies

A photograph submitted by Alastair to the QuakeStories website. The description reads, "ChristChurch Cathedral with scaffolding stabilising the facade. Sunday 11/12/11".

Images, UC QuakeStudies

The Arts Centre photographed shortly after the 22 February 2011 earthquake. A large crack can be seen in the tower and part of the brickwork around the clock has collapsed onto the pavement below. Scaffolding was placed up against the building after the 4 September 2010 earthquake and the gable was braced with wooden planks. This probably limited the damage to this part of the building. The building has been cordoned off with tape reading, 'Danger keep out'. A sign in front of the door reads, 'Site closed'.