Search

found 345 results

Images, UC QuakeStudies

A person takes a photograph during the Rally for the Cathedral in Cranmer Square. He is wearing a mask identified with the "Anonymous" movement. The rally protested the proposed demolition of the ChristChurch Cathedral.

Images, UC QuakeStudies

Members of the public take photographs of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.

Images, UC QuakeStudies

Members of the public take photographs of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.

Images, UC QuakeStudies

The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Images, UC QuakeStudies

The damaged cathedral is supported with steel bracing and cordoned off with fencing and barriers. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.

Research papers, Victoria University of Wellington

This topic was chosen in response to the devastation caused to Cathedral Square, Christchurch, New Zealand following earthquakes in 2010 and 2011. Working amongst the demolition bought to attention questions about how to re-conceive the square within the rebuilt city. In particular, it raised questions as to how a central square could be better integrated and experienced as a contemporary addition to Christchurch city. This thesis seeks to investigate the ways in which central squares can be better integrated with the contemporary city and how New Urbanist design principles can contribute toward this union. The research principally focuses on the physical and spatial integration of the square with the contemporary city. A drawing-based analysis of select precedent case studies helped to determine early on that overall integration of the contemporary square could be attributed to several interdependent criteria. The detailed studies are supplemented further with literature-based research that narrowed the criteria to five integrative properties. These are: identity, scale and proportion, use, connectivity and natural landscape. These were synthesised, in part, from the integrative New Urbanist movement and the emerging integrative side of the more contemporary Post Urbanist movement. The literature-based research revealed that a more inclusive approach toward New Urbanist and Post Urbanist design methodologies may also produce a more integrated and contemporary square. Three design case studies, using the redesign of Cathedral Square, were undertaken to test this hypothesis. The case studies found that overall, integration was reliant on a harmonious balance between the five integrative properties, concluding that squares can be better integrated with the contemporary city. Further testing of the third concept, which embraced an allied New Urbanist / Post Urbanist approach to design, found that New Urbanism was limited in its contribution toward the integration of the square.

Videos, UC QuakeStudies

A video of the reopening ceremony for the Heritage Hotel in Cathedral Square, which has been closed since the 22 February 2011 earthquake. The video shows Governor General Sir Jerry Mateparae opening the building while a string trio plays. It also includes footage of a speech by the Governor General, and a tour of the hotel.

Videos, UC QuakeStudies

A video about the time capsule found in the foundations of the former Press Building in Cathedral Square. Heritage consultant Jenny May shows the contents of the time capsule, including several coins, newspaper articles, and messages. The capsule was left by the architects and the people working on the building, rather than the editors of The Press.

Images, UC QuakeStudies

A CERA information sign on the fence in the Cathedral, placed to provide information to the public about the buildings seen from Cathedral Square. This one says "Regent Theatre: This has been demolished (see bottom left, now vacant site in photograph".

Images, UC QuakeStudies

The Wizard of Christchurch talking to members of the public outside of the damaged Christ Church Cathedral. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.

Images, UC QuakeStudies

The Citizens' Memorial statue beside the cathedral, with bracing around the neck and waist of the angel to prevent further damage. Taken on a day when a walkway was opened up between Re:Start Mall and Cathedral Square to allow temporary public access.