A video of an interview with Arts Centre CEO Andre Lovatt about the restoration of the Arts Centre after the 22 February 2011 earthquake. The video also includes a tour of the Arts Centre, including the Boys' High School swimming pool and gymnasium which was exposed after another building was demolished.
The aftermath of three earthquakes has forced Christchurch to re-plan and rebuild. New perspectives of a sustainable city have arisen granting Christchurch the chance of becoming an example to the world. This work is centred on bioclimatic landscape design as a base for greening strategies. It deals with strategic landscape design adapted to a specific climate, from a user’s perspective. The investigation will be applied to Christchurch’s urban centres, assessing cultural adaptability to the local climate and implications for landscape design. Climatic data shows that humidity is not a local problem. However, the wind is the determinant. In Christchurch the solar radiation and the prevailing winds are the most important microclimatic variables, the latter intensifying the loss of surface heat, decreasing the radiant temperature and affecting thermal sensation. The research objective is to explore design parameters at the street-scale and identify ways to maximise thermal comfort in outdoor spaces through design-based strategies. The investigation will apply methods of participant observation, depth interviews, climatic data collection and design experimentation based on thermal comfort models and computer simulation tools. Case study sites chosen for investigation are places with current levels of activity that may be anticipated in the rebuild of the central city. The research will have two main outcomes: improved understanding of local urban culture adaptation to microclimate, and a demonstration of how design can enhance adaption. These outcomes will inform designers and city managers about good design practices and strategies that can be used to ensure a long term liveable city.
"Extraordinary powers for extraordinary times."The Government says that's what it's giving to the new Christchurch earthquake authority it's set up to lead the rebuild.
Nearly two years' after Christchurch's February earthquake and almost 6 months after the blueprint for the city centre was revealed, many questions remain about how much it will cost and who will pay for it.
There has not been substantial research conducted in the area of fraud and natural disasters. Therefore, this study sought to examine the perceptions of Canterbury residents toward the recovery process following the September 2010 and February 2011 earthquakes and whether residents felt as though contractor fraud occurs in Canterbury. A questionnaire was developed to gauge information about Canterbury residents’ self-reports involving the earthquakes, specific contractors involved, parties involved with the recovery process in general, and demographic information. Participants included a total of 213 residents from the Canterbury region who had been involved with contractors and/or insurance companies due to the recovery process. Results indicated that a high percentage of the participants were not satisfied with the recovery process and that almost half of the participants reported feeling scammed by contractors in Canterbury after the 2010 and 2011 earthquakes. Moreover, the results indicate that participants neither agreed with the assessments made about their property losses nor the plans made to recover their properties. In many cases, participants felt pressured and even reluctant to accept these assessments and/or plans. The present study does not seek to explain why contractor fraud exists or what motivates scammers. Conversely, it attempts to demonstrate the perceptions of contractor fraud and satisfaction that have taken place in the aftermath of the Canterbury earthquakes.
The cartoon, which looks like a woodcut depicts a muscled workman wearing a black singlet; his arms are folded and the fingers of one hand are crossed. On his arms are tattoos of a helmet and pick, a '$' symbol, a petrol pump, and a high magnitude earthquake graph. Behind him are buildings, including the Christchurch Cathedral, damaged following the Christchurch earthquake of 22 February 2011. Below the cartoon are the words 'Apologies to Nigel Brown' - a black singlet is a recurring motif in the work of New Zealand artist Nigel Brown. Quantity: 1 digital cartoon(s).
Cartoon shows a game of hopscotch that illustrates the changing face of the entity with responsibility for the Christchurch rebuild after the earthquakes. Three versions of this cartoon are available Quantity: 3 digital cartoon(s).
Nikki Ross is still waiting on an insurance settlement almost seven years after her family home was damaged in the February, 2011 Christchurch earthquake. Trish Keith from EQC says they're hoping to offer the family a settlement in the next three weeks.
It's more than eight years since the earthquakes saw Christchurch crumble. Forty billion dollars has been poured into rebuilding - but what's missing now, is people.
The country's political parties are uncertain about whether a special tax might be needed to help pay to rebuild Christchurch after this week's devastating earthquake.
The All Blacks have announced this morning that they'll play an extra test match this year, to raise money for the rebuild of Christchurch.
The Prime Minister, has promised people in Canterbury they will know next Wednesday whether they can rebuild on ground badly damaged by this month's earthquake.
The Christchurch City Council is proposing a rate increase of more than 7 percent to help cover the rebuild of the city's earthquake damaged infrastructure.
The EQC (Earthquake Commission) has developed new standards and designs to help rebuild Christchurch after the earthquakes of 2010 and 2011. The Department of Building and Housing have produced some generic building foundation and floor designs that can be used for residential homes being built or repaired on liquefied, tilting, unsettled and/or damaged land. (RebuildChristchurch.co.nz) Quantity: 1 digital cartoon(s).
The Royal Commission into the Canterbury earthquakes has been told illegal building techniques are being used in the Christchurch rebuild because the engineering profession is in crisis.
A helicopter from Christchurch flies over New Zealand looking for somewhere to rebuild but everywhere are notices referring to fires, floods, oily beaches, volcanoes and geysers, quakes, landslides. Nowhere seems to be safe. Quantity: 1 digital cartoon(s).
A video of Lianne Dalziel announcing her decision to run for the mayoralty of Christchurch. Dalziel talks about the rebuild of Christchurch, and the daily lives of those living in post-earthquake Christchurch. She also talks about her decision to run independently, her experience as a minister, and the need for transparency and financial integrity in the Christchurch City Council. Lastly, she talks about the building consent crisis at the Council, and the need for the Council to connect with communities.
A video of a tour of Gloucester Street from Dallington to Rolleston Avenue, a five kilometre journey which can be seen as a cross-section of the Canterbury rebuild. The video includes footage of the site of the demolished St George's Presbyterian Church in Linwood, New Regent Street, the Rendezvous Hotel, the Isaac Theatre Royal, the Press building, the Christchurch Art Gallery, and Christ's College.
Some Christchurch building owners say a bulldozer's the best option, despite the city council calling for government help to rebuild heritage buildings damaged by the earthquake.
Since September 2010 Christchurch, New Zealand, has experienced a number of significant earthquakes. In addition to loss of life, this has resulted in significant destruction to infrastructure, including road corridors; and buildings, especially in the central city, where it has been estimated that 60% of buildings will need to be rebuilt. The rebuild and renewal of Christchurch has initially focused on the central city under the direction of the Christchurch City Council. This has seen the development of a draft Central City Plan that includes a number of initiatives that should encourage the use of the bicycle as a mode of transport. The rebuild and renewal of the remainder of the city is under the jurisdiction of a specially set up authority, the Christchurch Earthquake Recovery Authority (CERA). CERA reports to an appointed Minister for Canterbury Earthquake Recovery, who is responsible for coordinating the planning, spending, and actual rebuilding work needed for the recovery. Their plans for the renewal and rebuild of the remainder of the city are not yet known. This presentation will examine the potential role of the bicycle as a mode of transport in a rebuilt Christchurch. The presentation will start by describing the nature of damage to Christchurch as a result of the 2010 and 2011 earthquakes. It will then review the Central City Plan (the plan for the rebuild and renewal for central Christchurch) focusing particularly on those aspects that affect the role of the bicycle. The potential for the success of this plan will be assessed. It will specifically reflect on this in light of some recent research in Christchurch that examined the importance of getting infrastructure right if an aim of transport planning is to attract new people to cycle for utilitarian reasons.
A structural engineer has told the Canterbury Earthquakes Royal Commission that illegal building techniques are being used in the Christchurch rebuild because the engineering profession is in crisis.
Christchurch's earthquake rebuild authority, Regenerate Christchurch, has released a new report setting out a timeline for what to do with the land - but angry residents are calling for action.
Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding".
Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding".
Photograph captioned by Fairfax, "Gunyah homestead was badly damaged during the September 4th 2010 earthquake, but the Cotterill family are picking up the pieces and rebuilding".
A video of a public forum being held to discuss the Anglican Church's three options for the restoration of the ChristChurch Cathedral. The three options are restoring the original cathedral, reinterpreting the original cathedral in modern materials, or building a contemporary cathedral. The video includes footage of speeches by Bishop Victoria Matthews and RCP project manager Marcus Read. It also includes footage of Matthews, Read, and Warren and Mahoney architect Bill Gregory answering questions from the public.
A PDF copy of pages 18-19 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Revival'. Photos: Sam Heap
A video of interviews with members of the public about which option they prefer for the restoration of the ChristChurch Cathedral. The options considered are those unveiled by the Anglican Church: the restoration option which would restore the current cathedral; the traditional option which would reinterpret the original cathedral in modern materials; and the contemporary option which would create a new building featuring a lightweight timber frame, more glazing, and modern interiors.
The new Cabinet is reportedly considering a rebuild plan for the Christchurch Cathedral, damaged in the 2011 earthquake. Supporters of restoring the cathedral say the signs are promising.
A Christchurch City Councillor is worried the wishes of local residents and the council could be by-passed once the Earthquake Recovery Authority takes over rebuilding the city.