Search

found 201 results

Articles, UC QuakeStudies

A PDF copy of pages 104-105 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'SCAPE'. Image: Ash Keating, Gardensity, 2010/11, commissioned by SCAPE with generous support from Leighs Construction and Portabuild, installed outside Christchurch Art Gallery. Photo used with permission: SCAPE.

Images, eqnz.chch.2010

On a walk over to Hagley Park to great some shots of the wonderful Cherry Blossom I past by the Knox Church rebuild and found that the scaffolding has come down at last. It sure was shinning in the midday light. Victoria Street September 12, 2014 Christchurch New Zealand

Images, UC QuakeStudies

The Asko Design store on Victoria Street has been given a yellow sticker. This was a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

The Surreal Hair & Beauty store on Victoria Street has been given a yellow sticker. This was a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

The Surreal Hair & Beauty store on Victoria Street has been given a yellow sticker. This was a building assessment system used following the February earthquake and indicates that this building has limited access and needs further evaluation.

Images, UC QuakeStudies

A view of Victoria Street from Mod's Hair where the building and adjoining building have been damaged, and cordoned off with fencing and road cones. Piles of building rubble can be seen outside on the footpath and road.

Images, UC QuakeStudies

A view of Victoria Street from Mod's Hair where the building and adjoining building have been damaged, and cordoned off with fencing and road cones. Piles of building rubble can be seen outside on the footpath and road.

Images, UC QuakeStudies

Damage to the Victoria Street clock tower which stopped at the time of the 22 February earthquake. Sections of the base have been covered by black plastic sheeting and shipping containers protecting the road from the danger of it falling.