Search

found 209 results

Images, UC QuakeStudies

A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.

Images, UC QuakeStudies

A view looking south down Durham Street during the aftermath of the 22 February 2011 earthquake. On the left are the ruins of the historic stone Provincial Council Legislative Chamber. The building's roof and walls have already collapsed, as has the scaffolding which was erected to repair it after the 4 September 2010 earthquake. An aftershock has caused masonry to dislodge from the building, sending dust into the air.

Research papers, The University of Auckland Library

As part of the 'Project Masonry' Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. In addition, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake and brief suggestions are provided regarding appropriate seismic retrofit and remediation techniques for stone masonry buildings. http://www.nzsee.org.nz/publications/nzsee-quarterly-bulletin/

Images, eqnz.chch.2010

The temporary (10 years?) and cheap ($4-6 million) Anglican Cathedral being built a few hundred meters away from the old stone structure that was the centre of Christchurch. Both buildings (the original and this) have caused a lot of controversy, many wanting the old stone one to be repaired (the church want to demolish it), and this as a waste ...

Images, UC QuakeStudies

In a vacant lot opposite the CTV building where a building has been demolished, is a commemoration to those who died in the earthquake. It includes a pile of demolition rubble and 185 white stones in honour of each person who lost their life on 22nd February 2011. Around it are also item such as a frame photograph and flowers left by the public.

Images, UC QuakeStudies

In a vacant lot opposite the CTV building where a building has been demolished, is a commemoration to those who died in the earthquake. It includes a pile of demolition rubble and 185 white stones in honour of each person who lost their life on 22nd February 2011. Around it are also item such as a frame photograph and flowers left by the public.

Images, UC QuakeStudies

In a vacant lot opposite the CTV building where a building has been demolished, is a commemoration to those who died in the earthquake. It includes a pile of demolition rubble and 185 white stones in honour of each person who lost their life on 22nd February 2011. Around it are item such as a frame photograph and flowers left by the public.

Research papers, The University of Auckland Library

Case study unreinforced masonry (URM) buildings that were seismically retrofitted prior to the 2010/11 Canterbury earthquake sequence and exhibited successful performance during these earthquakes are presented herein. Selected buildings were divided into the following categories based on size and complexity: (1) simple, single storey box type buildings (i.e. electrical substations), (2) common and simple commercial buildings, and (3) large and complex clay brick and stone URM buildings. The retrofitted case study URM buildings were evaluated based on overall structural seismic performance as well as the categories of initial seismic design, heritage preservation, architectural appeal, and cost. Detailed observations of 4 representative case study buildings and a summary of findings are reported herein. http://db.nzsee.org.nz/2017/Orals.htm