Search

found 225 results

Images, eqnz.chch.2010

Rugby World Cup 2011 (RWC 2011) Tournament partners have reluctantly announced that Christchurch will be unable to host the seven matches currently scheduled to be played at the AMI/Lancater Park Stadium in Christchurch. This follows a detailed assessing of damage to the Stadium, grounds and infrastructure caused by the 6.3 magnitude earthquake ...

Videos, UC QuakeStudies

A vide of an interview with Darren Shand, the manager of the All Blacks, about the upcoming test match at the Christchurch Stadium in Addington. Shand talks about the team's excitement about returning to Christchurch. The video also includes footage of the All Blacks training at Linfield Park.

Images, eqnz.chch.2010

The ticket office at Lancaster Park (AMI Stadium), not used since the February 2011 earthquake. Windows broken and door boarded up. We are still waiting to see what the outcome is for this stadium. Government want a new one closer to the CBD, so there is talk of this being demolished, while others want it repaired.

Images, UC QuakeStudies

The top of the water slides in the QEII swimming pool, exposed by its demolition. The slides themselves have been broken off, leaving only the entry points. The photographer comments, "After assessment of the damage caused by the numerous earthquakes in Christchurch, New Zealand they decided to demolish the QEII stadium and it's swimming pool".

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office lining up outside a Maggi van which is distributing soup. The van is parked outside Cowles Stadium on Pages Road, which was set up by Civil Defence as temporary accommodation for those displaced by the 4 September 2010 earthquake.

Audio, Radio New Zealand

Christchurch has a big bill to contend with, if it still wants the multi-use stadium that's been in the works since the earthquakes 11 years ago. The problem-plagued project has blown out another $150 million, meaning it's going to cost $680 million and counting. The finish date's been pushed out too - to April 2026. Christchurch City Council's punting the hefty decision making back to the ratepayers. The options - increase the budget, scale back the project, or halt work altogether. Tessa Guest reports, and Crusaders CEO Colin Mansbridge talks to Lisa Owen.

Videos, UC QuakeStudies

A video about members of the Irish rugby team touring the Christchurch central city Red Zone. The team is in Christchurch for a test match against the All Blacks at the new Christchurch Stadium. The video includes interviews with scrum coach Greg Feek and coach Declan Kidney. It also includes footage of Irish construction workers meeting the team in Cathedral Square.

Images, UC QuakeStudies

A photograph of a panaroma of Christchurch with Spencer Park, Parklands Library, QEII Park, Bottle Lake Forest, Cowles Stadium, Animal Control, and the Waste Water Treatment Plant labelled. The panaroma is on the wall of the temporary Civil Defence headquarters set up at the Christchurch Art Gallery after the 4 September 2010 earthquake.

Images, UC QuakeStudies

A photograph submitted by Sarndra to the QuakeStories website. The description reads, "Lancaster Street/Ferry Road corner with AMI Stadium in the background.".

Images, UC QuakeStudies

A photograph submitted by Sarndra to the QuakeStories website. The description reads, "Pages Road near Cowles Stadium. 23 February 2011. Through the car window.".