A photograph of people gathered at the RAD Bikes bike shed on Gloucester Street for a restoration workshop, as part of FESTA 2013.
A photograph of a woman at the RAD Bikes bike shed for a hands-on talk. The talk was part of FESTA 2013.
A document which describes how SCIRT led the co-ordination of its huge repair programme with those of other utilities.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
Photograph captioned by BeckerFraserPhotos, "The Cathedral of the Blessed Sacrament on Barbadoes Street".
Scaffolding covering the outer walls of the James Hight Building at the University of Canterbury. The photograph has been captioned by BeckerFraserPhotos, "The repair work on the buildings at the University of Canterbury looks similar to the scenes in the CBD".
Posters created for Beca Heritage Week 2014, outlining SCIRT's repair work on the Armagh Street and Colombo Street bridges in the Central City. They were hung on the bridges for members of the public to read during SCIRT's walk and talk tours.
Roading machinery parked on the side of River Road. The road is under repair, but has not yet been resealed. The photographer comments, "Looking east to Banks Ave-Dallington Tce. River Rd nearly ready for re-sealing. Over the next year, the road subsided and was repaired 3 or 4 times".
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A photograph of a bike being restored at the RAD Bikes bike shed on Gloucester Street during a workshop. The workshop was part of FESTA 2013.
A photograph of a bike being restored during a hands-on workshop at the RAD Bikes bike shed. The event was part of FESTA 2013.
A photograph of a bike being restored at the RAD Bikes bike shed on Gloucester Street during a hands-on talk. The event was part of FESTA 2013.
A pile of tarseal scraped from the damaged River Road sits in front of a house. The photographer comments, "Road repairs and abandoned houses".
A variation to the consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
A view of the High to Hereford food court building from Hereford Street.
A photograph of a sign on the RAD Bikes bike shed on Gloucester Street. The sign reads "RAD Bikes Recycle A Dunger. This is an ex-demolition site. Hazards may exist. Please take care".
A document which specifies the technical requirements for the rehabilitation and repair of pipes using lining methodologies during the SCIRT programme of work.
A photograph captioned by BeckerFraserPhotos, "Christ's College, Rolleston Avenue. Damage to the top of this building has had temporary repairs carried out".
essential systems upon which the well-being and functioning of societies depend. They deliver a service or a good to the population using a network, a combination of spatially-distributed links and nodes. As they are interconnected, network elements’ functionality is also interdependent. In case of a failure of one component, many others could be momentarily brought out-of-service. Further problems arise for buried infrastructure when it comes to buried infrastructure in earthquake and liquefaction-prone areas for the following reasons: • Technically more demanding inspections than those required for surface horizontal infrastructure • Infrastructure subject to both permanent ground displacement and transient ground deformation • Increase in network maintenance costs (i.e. deterioration due to ageing material and seismic hazard) These challenges suggest careful studies on network resilience will yield significant benefits. For these reasons, the potable water network of Christchurch city (Figure 1) has been selected for its well-characterized topology and its extensive repair dataset.
An aerial photograph looking north-east over the Christchurch Arts Centre, where major repairs are underway. The Christchurch Art Gallery is visible in the distance.
Photograph captioned by BeckerFraserPhotos, "Bonnington House, aka Red Cross building, at 227 High Street".
A crane lifts containers off a goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
A crane lifts containers off a goods train stopped on the track beside SH71 near Rangiora. Trains were unable to run until buckled tracks were inspected and repaired.
Road cones along the side of Halswell Road where the road has been repaired and sealed after slumping. There are still cracks in the footpath and curb.
Workers repairing water mains along Galbraith Avenue in Avonside. A blue pipe carrying a temporary water supply to the neighbourhood can be seen running across the park.