A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of an office in the Department of Civil and Natural Resources Engineering at the University of Canterbury after the 4 September 2010 earthquake.
A photograph of volunteers from the Wellington Emergency Management Office eating pizza on the side of Park Terrace near the intersection with Salisbury Street.
A photograph of volunteers from the Wellington Emergency Management Office standing on a pile of bricks from an earthquake-damaged building in the Christchurch central city.
Photograph captioned by BeckerFraserPhotos, "The Old Post Office in Cathedral Square with the Telecom exchange building behind, and Clarendon Tower under demolition".
The inside of the Gap Filler Headquarters. Members of the Gap Filler team are working on a table in the centre of the office.
Photograph captioned by BeckerFraserPhotos, "The old Post Office, Cathedral Square. Note the clocks have been covered or removed".
Photograph captioned by BeckerFraserPhotos, "Old post office building with demolition site of Regent Theatre, Cathedral Square".
A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down Worcester Street towards Latimer Square.
A photograph of a map of the Greendale fault line in Canterbury used by volunteers from the Wellington Emergency Management Office.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team sitting against a fence on Worcester Street near Latimer Square.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team eating lunch in Latimer Square.
Members of Gap Filler and volunteers posing for a photograph in front of the half complete 10m2 office building in Sydenham.
Members of the public enjoying Coffee Zone, a cafe in a shack next to the 10 square metre office building in Sydenham.
The ceiling of the 10 square metre office building, soon to be Gap Filler Headquarters. Metal bracing can be seen between the wooden beams.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men add insulation to the back wall.
The construction of the 10 square metre office building which is to serve as Gap Filler Headquarters. Two men put the walls together.
A photograph captioned by BeckerFraserPhotos, "The former Post Office clock tower in Cathedral Square, the clock face boarded up with plywood".
A photograph of a minister from the International Disaster Relief Team giving a volunteer from the Wellington Emergency Management Office a massage.
A photograph of a minister from the International Disaster Relief Team giving a volunteer from the Wellington Emergency Management Office a massage.
A photograph of a minister from the International Disaster Relief Team giving a volunteer from the Wellington Emergency Management Office a massage.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team walking down St Asaph towards Antigua Street.
A photograph of volunteers from the Wellington Emergency Management Office standing on a pile of bricks from an earthquake-damaged building in the Christchurch central city.
A photograph of volunteers from the Wellington Emergency Management Office preparing for their journey to Christchurch after the 22 February 2011 earthquake.
A photograph of members of the Wellington Emergency Management Office Emergency Response Team standing on Antigua Street near Corys Electrical.
A photograph of volunteers from the Wellington Emergency Management Office walking down a street in Christchurch. A portaloo has been placed on the side of the road.
The site in Sydenham where the 10 square metre office building of Gap Filler Headquarters sits, with the Coffee Zone shack next door.
Volunteers drill holes in corrugated iron on the outside of the 10 square metre office building, soon to be Gap Filler Headquarters.