A group of people on the Gap Filler "Dance-o-mat" dance floor in Re:Start mall.
The disco ball suspended above the Gap Filler "Dance-o-mat" dance floor in Re:Start mall.
Damage to a building on the corner of Madras and Hereford Streets, the upper floor of which has collapsed.
Damage to an apartment complex on Durham Street. The building has collapsed on the ground floor level.
Damage to an apartment complex on Durham Street. The building has collapsed on the ground floor level.
Underfloor deposits are as exasperating as they are exciting. Exasperating because the context is not particularly secure: objects usually accumulate under a house over time (thrown or swept from the outside, lost or dropped between the floorboards, dragged in by … Continue reading →
A photograph of cracks in the floor of an earthquake-damaged building at the University of Canterbury.
A photograph of cracks in the floor of an earthquake-damaged building at the University of Canterbury.
A photograph of cracks in the floor of an earthquake-damaged building at the University of Canterbury.
Earthquake damage in a Commerce office on campus, papers fallen on the floor, and a filing cabinet toppled.
It's been a year since Pip Ranby was rescued from the top floor of the five storey Canterbury Television building.
A photograph captioned by BeckerFraserPhotos, "First floor of a collapsed building at 143 Manchester Street".
Sticky Fingers Restaurant & Bar, on the ground floor of the Clarendon Tower, seen from across from the Avon river.
A photograph of a crack in the floor of an earthquake-damaged building at the University of Canterbury.
Insulation waiting to be installed into the floor of one of the temporary classrooms in the Ilam Oval.
Pieces of decorative stonework that have been arranged on the floor of the Durham Street Methodist Church.
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
A volunteer painting a sheet of wood for the dance floor of Gap Filler's "Dance-O-Mat".
(It was already opened up mid-way through a repair. But it wasn't on the floor!)
A worker inserts glue between the insulation panels in the floor of one of the temporary buildings on the Ilam Oval.
Piles in the ground, waiting for the floors of temporary classrooms to be built on top, on the Ilam Oval.
The multi-storey Pacific Brands building on Victoria Street has been cordoned off. The Cranfield shop occupied the first floor.
Rob Clark was on the sixth floor of his office building when the quake struck, and got stuck in gridlock leaving the CBD.
A staff member takinga photograph of grains and beans fallen from bags onto the floor of Piko Wholefoods.
The Copy Centre operating out of a space at the ground floor of the UCSA building, adjacent to the food court.
A photograph captioned by BeckerFraserPhotos, "5 Poplar Street with damage from 23 December 2011 on the second floor".
A computer tipped over and files fallen on the floor in the English department office after the 23 December 2011 earthquake.
Photograph captioned by BeckerFraserPhotos, "Press Building, Cathedral Square. Top floor collapsed during the February 22 earthquake".