Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
Mechanical Engineer students having lectures at Ohoka/Mandeville Showground. Lectures have been held in tents and in the bar at Ohoka/Mandeville showground since the February earthquake.
An engineer who worked for the company that designed the CTV building, has criticised the attitude of his former boss at the Canterbury Earthquakes Royal Commission.
The head of an international team of engineers who are expert in designing for disasters says Wellington should look closely at the lessons from the Canterbury earthquake.
A tool, including an outline and run sheet, used by the SCIRT Communication Team when delivering a series of workshops to SCIRT engineers about working around businesses.
An earthquake engineer has told the Canterbury Earthquakes Royal Commission that the intense vertical shaking during the February 2011 earthquake wasn't unique and was similar to events overseas.
A video of Emily Marriot, from Corbel Construction, and Agata Bulksa, from Kirk Roberts Engineers, taking part in a boxing match as part of the Battle of the Rebuild fight night. The Battle of the Rebuild bought together major construction and engineering companies involved in the rebuild of Christchurch. The event raised more than $169,000 for the Aranui and Linwood College Breakfast Club, the Champion Centre, and the Canterbury Youth Development Programme Trust.
Quick and reliable assessment of the condition of bridges in a transportation network after an earthquake can greatly assist immediate post-disaster response and long-term recovery. However, experience shows that available resources, such as qualified inspectors and engineers, will typically be stretched for such tasks. Structural health monitoring (SHM) systems can therefore make a real difference in this context. SHM, however, needs to be deployed in a strategic manner and integrated into the overall disaster response plans and actions to maximize its benefits. This study presents, in its first part, a framework of how this can be achieved. Since it will not be feasible, or indeed necessary, to use SHM on every bridge, it is necessary to prioritize bridges within individual networks for SHM deployment. A methodology for such prioritization based on structural and geotechnical seismic risks affecting bridges and their importance within a network is proposed in the second part. An example using the methodology application to selected bridges in the medium-sized transportation network of Wellington, New Zealand is provided. The third part of the paper is concerned with using monitoring data for quick assessment of bridge condition and damage after an earthquake. Depending on the bridge risk profile, it is envisaged that data will be obtained from either local or national seismic monitoring arrays or SHM systems installed on bridges. A method using artificial neural networks is proposed for using data from a seismic array to infer key ground motion parameters at an arbitrary bridges site. The methodology is applied to seismic data collected in Christchurch, New Zealand. Finally, how such ground motion parameters can be used in bridge damage and condition assessment is outlined. AM - Accepted manuscript
With Andrew Cleland - Chief Executive of the Institution of Professional Engineers NZ. Dr Maan Alkaisi - Co-chair Christchurch Earthquake Families Group. Maurice Williamson - Minister for Building and Construction.
Civil Engineer Professor Jason Ingham discusses his extensive projects investigating seismic retrofit of structures in earthquake regions he's been to over the past 12 months, Indonesia, Chile and of course, Christchurch.
An American engineer has told the Canterbury Earthquakes Royal Commission he was shocked at the failure of builders to properly fix the floors of the PGC building to its walls.
An earthquake engineer says designing buildings to resist earthquakes is as much an art as it is a science and you can never make a structure completely quake-proof.
A pdf copy of a PowerPoint presentation used by Duncan Gibb when presenting his Brunel lecture.
The Royal Commission investigating the Canterbury earthquakes has heard that the premises where a man was killed by a falling concrete wall was not inspected by structural engineers between the September and February quakes.
The Canterbury Earthquake Royal Commission has heard that a breakdown in communication between structural engineers, a property manager and owner led the tenants of a building to wrongly assume their shop was safe.
One silver medal awarded to SCIRT in October 2013 from the Institution of Civil Engineers in the United Kingdom in recognition of the excellent in civil engineering. Includes storage case and explanation sheet.
It's emerged that engineers involved in the most serious building collapse of the Christchurch earthquake are unlikely to face any external action, with the profession's two top bodies telling the Government their hands are tied.
Base isolation has generally been considered an expensive system used mainly in commercial buildings to make them more earthquake resilient. Katy Gosset meets the University of Canterbury engineers who've developed a safe, low cost model that could work in our homes.
Misko Cubrinovski, Civil Engineer, photographed with liquefaction and lateral spreading on Oxford Terrace. Misko's area is geotechnical earthquake engineering and foundation engineering, and he will feature in a UC in the News pull out supplement inThe Press.
A Red Sticker on the window, the heading says 'Do not approach or enter this building'. These placards were used following the September earthquake to inform the public about the status of a building after it had been checked by engineers.