The quake-damaged facade of the Baptist Church at the Kilmore Street / Madras Street intersection being propped up while repairs are in progress.
Photograph captioned by Fairfax, "Christchurch Earthquake. Shops on the corner of Cranford Street and Westminster Street were torn down this afternoon as they had been deemed too dangerous after Saturday's earthquake in Christchurch. Lindsay Troo owner of Altron TV repair shop talks about his loss".
The repair of Christchurch's earthquake damaged arts centre has revealed details hidden from view for forty years including a badminton court and the site of an old swimming pool.
Tower Insurance has increased the amount it is willing to pay towards repairing an earthquake-damaged Christchurch home, but is still refusing to pay for a more expensive rebuild.
The Plumbers industry body says some plumbers helping Christchurch quake victims are struggling to stay afloat, because the Earthquake Commission is not paying out fast enough for emergency repairs.
More than ten weeks after being damaged beyond repair by the Christchurch earthquake, there is still no decision about how or when the Grand Chancellor Hotel will be demolished.
A message in a bottle, hidden under the floor of a Christchurch home for over fifty years, has been discovered during earthquake repairs and its writer's been tracked down.
Canterbury earthquake victims with the most damaged homes could have to wait more than two and half years for their houses to be fixed - but one owner says her problems are nothing compared to the misery of the Pike River mine disaster.
Steel frames are being used to shore the unstable facade of the St John the Baptist Church at Latimer Square while the building is being repaired and strengthened following the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
© 2018 Springer Nature B.V. This study compares seismic losses considering initial construction costs and direct-repair costs for New Zealand steel moment-resisting frame buildings with friction connections and those with extended bolted-end-plate connections. A total of 12 buildings have been designed and analysed considering both connection types, two building heights (4-storey and 12-storey), and three locations around New Zealand (Auckland, Christchurch, and Wellington). It was found that buildings with friction connections required design to a higher design ductility, yet are generally stiffer due to larger beams being required to satisfy higher connection overstrength requirements. This resulted in the frames with friction connections experiencing lower interstorey drifts on most floors but similar peak total floor accelerations, and subsequently incurring lower drift-related seismic repair losses. Frames with friction connections tended to have lower expected net-present-costs within 50 years of the building being in service for shorter buildings and/or if located in regions of high seismicity. None of the frames with friction connections in Auckland showed any benefits due to the low seismicity of the region.
EQC CEO Sid Miller says the agency is currently defending 316 legal cases over the Christchurch earthquakes, and is considering legal action against Fletcher's for its project management of the repairs.
The old Christchurch Railway Station Clock Tower was damaged during the 7.1 magnitude quake on 4 September 2010 and was braced by the wooden sleeve until repaired. However, although the sleeve did its job during the 6.3 magnitude quake on 22 February 2011, the lower part of the tower started to break away.
Shell shocked residents still picking up the pieces in one of the worst earthquake affected parts of Canterbury, say a looming rates rise to pay for repairs will cripple them.
A Christchurch man says EQC misled him about the earthquake damage to his home and deliberately under-scoped the repairs that were needed. David Townshend said his warnings were ignored.
A protest is underway outside insurance company Vero's Christchurch's office, with building owners dismayed to be still fighting for earthquake repairs 10 years on. The protest was organised by the owners of an 11 unit apartment block in New Brighton, who says Vero is purposefully delaying progress to wear them down. RNZ's reporter Rachel Graham is at the protest and spoke to Meriana Johnsen
Relates to the three new categories for residential foundation design that have been developed and will be required for repairing and rebuilding homes in Canterbury following the earthquakes of 2010 and 2011. The 'zones' referred to in the cartoon are the colours designated to different degrees of damage to particular areas or buildings in Christchurch after the earthquakes. Quantity: 1 digital cartoon(s).
Glazing systems are non-structural elements in a building that, more often than not, appear to be given little consideration in seismic design. Recent experimental work into glazing systems at the University of Canterbury, however, has shown that glazing systems can be very susceptible to serviceability damage, defined as loss of water-tightness. The focus of this paper is to highlight the difference in vulnerability of standard and seismic glazing systems and consider the implications of this for future repair costs and losses. The paper first describes the damage states chosen for glazing units according to the repair strategies required and expected repair costs. This includes three damage states: DS1: Water Leakage, DS2: Gasket Failure and DS3: Frame/Glass Failure. Implementing modern performance-based earthquake engineering, the paper proceeds to highlight a case study comparing costs and expected losses of a standard glazing unit and a seismic glazing unit installed on a case study building. It is shown that the use of seismic glazing units is generally beneficial over time, due to the early onset of serviceability damage in standard glazing units. Finally, the paper provides suggestions for designers aimed at reducing costs related to earthquake induced repairs of glazing.
As Auckland and Northland brace for more atrocious weather, city leaders are calling for funding to repair the city's broken infrastructure to be along the lines of the help given to Christchurch after the quakes. Auckland deputy mayor Desley Simpson says that the damage so far is equivalent to the biggest non earthquake event the country has ever had and should be treated accordingly. The Opportunities Party says the "alliance" model established after the earthquakes, was effective and would work for Auckland's rebuild, because it provides a structure that the Central Government can fund directly. ToP leader Raf Manji was a Christchurch councillor after the quakes and closely involved in the rebuild. He tells Kathryn Ryan it is vital to ensure water and transport infrastructure is repaired quickly and efficiently, especially with a view to future extreme weather events - and there is much to learn from the post-quake rebuild.
The Earthquake Commission has been forced into an embarrassing admission that the details of all 83-thousand clients in its Canterbury Home Repair programme have been accidentally emailed to the wrong address.
Some 10 years on from the devastating Canterbury quakes, the wait is still not over when it comes to law changes needed to improve the Earthquake Commission. The government will not get it done until 2021, if it's re-elected. Meanwhile cases of botched quake repairs needing a fix are still flooding into EQC, Greater Christchurch Regeneration Minister Megan Woods told Checkpoint.
A project manager for a company doing home repairs in the Christchurch earthquake rebuild says it is highly likely as many as 60-thousand people have been exposed to potentially lethal asbestos fibres.
Christchurch's Blessed Sacrament Cathedral was set to be repaired following the Canterbury earthquakes, but the new Bishop Paul Martin has decided it's too expensive and has decided to rebuild closer to the city centre.
A photograph captioned, "After the September earthquake, it was more a simple case of something gets broken and it gets repaired. Then came February, and June as well, and suddenly it's just not so straightforward anymore".
More than four years after earthquakes first damaged home in Christchurch, hundreds of Canterbury homeowners are finding out that they may have to wait another two years before their damaged homes are repaired.
The cartoon shows an enormous ball of red tape and all around frustrated workers carry away their ladders and tools. Context - Three months after a quake that scored a direct hit under Christchurch, many residents are struggling with mountains of paperwork required to get their homes repaired and rebuilt. Reference numbers, codes and Pin numbers permeate our daily living now as we deal with the aftermath of two major earthquakes in six months. People feel they are lucky that they have the EQC pot to draw on, but there are a lot of complexities, anomalies and frustrations. (BBC News 21 May 2011) Colour and black and white versions available Quantity: 2 digital cartoon(s).
The Earthquake Commission has admitted its privacy breach was almost 10 times worse than it had said, with the details of all 83-thousand clients in its Canterbury Home Repair programme being emailed out.
Almost 200 workers in Christchurch have lost their jobs with the closure of the Canterbury Spinners Plant - which the owners say was so badly damaged in last month's earthquake that it is beyond repair.
Despite Government pressure on the Christchurch City Council to sell off some of its assets to help fund its 40% share of the city's earthquake repairs, the council has instead decided to raise rates, and rents.
The Earthquake Commission has admitted the details of all 83-thousand clients in its Canterbury Home Repair programme have been accidentally emailed to the wrong place, not just the almost 10 thousand it said on Friday
During recent earthquake repairs at a residential property on well-known Sumner Road in Lyttelton, our archaeologists uncovered a small assemblage of artefacts that represented everyday Victorian household items. At first glance these appeared a somewhat ordinary – but when Lydia … Continue readi...