Search

found 161 results

Images, UC QuakeStudies

The laying of new sewers in Bridge Street, South Brighton. Road cones have been placed along the road works. Temporary road signs indicate that the current speed limit is 30 km/h. Diggers, four-wheel drive vehicles and a truck are parked beside piles of gravel and a yellow sewer pump.

Images, UC QuakeStudies

The northern side of the Christ Church Cathedral with the cafe and store in the foreground. Shipping containers have been placed around the eastern side of the Cathedral to protect the road from falling debris. Wire fencing has also been placed around the building as a cordon. To the right, the damaged and party deconstructed tower can be seen with the missing spire which fell during the 22 February 2011 earthquake.