Following the 5.8 and 6.0 quakes of 23/12/11 there is further damage to the track separating the Bexley Wetlands from the Pacific Park housing area.
20120805_7586_1D3-600 30 seconds later the dust drifts across the city. Following the demolition of the earthquake damaged Newstalk ZB building. #2649
Following the 5.8 and 6.0 quakes of 23/12/11 there is further damage to the track separating the Bexley Wetlands from the Pacific Park housing area.
Looking across several properties to a yet to demolished (or possibly removed) house on Seabreeze Close, Pacific Park, Bexley.
The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open. Bridge opened for traffic less than a week later, but still (23/09) has 30kmh speed restriction.
Awaiting the demolition ball! See the hole punched in by the neighbouring building (now demolished) during the February 22 2011 earthquake. This building is leaning to the north (left) while it's now demolished neighbour was leaning to the south (right). All because the crap land gave way underneath!
Deconstruction has been halted, but this was the front of Christchurch's most famous landmark. The tower/spire was above the nearest bit of remains.
Exactly 2½ years (27/02/11 - 27/08/13) since the Queensland (Australia) SAR team TF1 spray painted this on a concrete fence in Armagh Street. Not many of these signs left now as many buildings have been demolished.
Cunningham House at the Christchurch Botanic Gardens is still closed due to earthquake damage. I wonder if it will ever re-open or suffer the demolition fate many other iconic structures in Christchurch have.
The damaged (and once iconic Christchurch Cathedral) waits it's fate (repaired or demolish/rebuild) with the Millenium hotel in background.
The Avon River loop around Porritt Park has risen with the quake. Huge cracks are all through Porritt Park (rowing, hockey and cricket venue). The main section of the river is in a man made cut behind the buildings in the background of this pic.
The historic Deans Homestead 23 months ago. Now destroyed in the Canterbury earthquake of September 4th 2010. This photo was taken on the PSNZ 2008 Southern Regional Photographic Convention bus trip.
What more can one say except that Shag Rock is now about one third it's original height. Whitewash Head in the background with the road that now drops over a cliff.
Across the river were a row of several houses - all gone now. That side of the river is "Red Zone" and will be devoid of houses soon. #4077
This is the Summit Road below Mt Cavendish and shows a few remaining high buildings in the central city beyond (in setting sun). Just above centre is the doomed AMI Stadium (1) aka Lancaster Park, home to Canterbury cricket and rugby till the erathquakes.
20130312_4425_1D3-150 South New Brighton boardwalk track [Explored] Damaged in the earthquakes, now with more bends and not level as it was before. Selected for Explore. #306 12/05/13 #3402
Further damage to the bank following the two quakes on 23/12/11. The sewer line broke here and was repaired (patched) by council staff on Christmas Eve. It is hard to beleve that this rock wall was level with the land here, before any of the quakes.
Annette Preen's house in background. See the angle the front of house is on. This maybe a write off as it is trashed inside with liquification occurring right under the house and bursting through concrete floor. Annette was featured on TV3 news tonight. Go to TV3 website to see news item.
A view that was impossible six years ago. There was a group of buildings including another high-rise in the vacant area in the middle ground.
According to the sign it can take about 30 minutes to walk from the entry point (near the small statue) to the centre and out again. What you can do with a few thousand old bricks and gravel. See next photo for more detail.
20130211_2645_1D3-840 South New Brighton bridge damage (under repair) Earthquake damage (that right hand abutment should be vertical with the bridge and the hand rail level). Bridge is closed to eastbound traffic (to left) and has a 3500kg weight limit as well. The eastern approach is the same. Damage caused mainly in the 04/09/10 and 22/02/11...
Trees cut down so a house being removed from behind could get out above the fence on one of those elevating house removal trailers. I don't know the story about the yellow (recycling) wheelie bin - the wheels have been removed.
According to the sign it can take about 30 minutes to walk from the entry point (here) to the centre and out again. That is without stepping across the gaps between bricks. What you can do with a few thousand old bricks and gravel!
The old Esplanade Tavern is being demolished due to damage suffered in the earthquakes of 2011. Another one of New Brighton's iconic buildings to go.
A month after the 1st anniversary of the deadly Christchurch earthquake (22/02/11) a road cone lies on New Brighton Road, alongside the Avon River. Part of the earthquake 1st anniversary remembrance was for people to place flowers in road cones (and there are hundreds of thousands in the city). Many had flowers in them, as this one did. Photo ...
Shot from up Hunstbury Hill with a 600mm f/4 on a very grey morning. 8am demolition. The guy behind me only looked up when the sounds of the explosion reahed us and the building was half way down!
Work is continuing on the earthquake damaged South New Brighton bridge. Avon River to the left, Avon-Heathcote Estuary the other side of the bridge.
The electrical supply substation built into the Lion Breweries Canterbury Draught brewery in St Asaph Street, Christchurch. Now the whole complex is being demolished due to earthquake damage.
This is a temporary pile of silt piled on the old Bexley landfill sight. Some trucks are addng to the pile, while other truck and trailer units are taking it away to the old Bottle Lake landfill sight, a few km to the north of here.
Cleaning up Manning Signs of the silt from liquefaction. Three fellow workers man the shovels while two building engineers talk to the boss (hidden). After doing the car park we then turned our hands to the inside of the factory, once clearance was given that we could go inside.