Search

found 173 results

Research papers, University of Canterbury Library

Knowing how to rapidly rebuild disaster-damaged infrastructure, while deciding appropriate recovery strategies and catering for future investment is a matter of core interest to government decision makers, utility providers, and business sectors. The purpose of this research is to explore the effects of decisions and outcomes for physical reconstruction on the overall recovery process of horizontal infrastructure in New Zealand using the Canterbury and Kaikoura earthquakes as cases. A mixed approach including a systematic review, questionnaire survey and semi-structured interviews is used to capture perspectives of those involved in reconstruction process and gain insights into the effect of critical elements on infrastructure downtime. Findings from this research will contribute towards advancements of a systems dynamics model considering critical decision-making variables across phases of the reconstruction process to assess how these variables affect the rebuild process and the corresponding downtime. This project will improve the ability to explore alternative resilience improvement pathways and test the efficacy of alternative means for facilitating a faster and better reconstruction process.

Videos, UC QuakeStudies

A video of excavators demolishing the former railway station on Moorhouse Avenue. The building was only moderately damaged during the 22 February 2011 earthquake, but repair work was deemed too costly for the co-owner, Science Alive!.

Research papers, The University of Auckland Library

The skills agenda has grown in prominence within the construction industry. Indeed, skill shortages have been recognised as a perennial problem the construction industry faces, especially after a major disaster. In the aftermath of the Christchurch earthquakes, small and medium construction companies were at the forefront of rebuilding efforts. While the survival of these companies was seen to be paramount, and extreme events were seen to be a threat to survival, there is a dearth of research centring on their resourcing capacity following a disaster. This research aims to develop workforce resourcing best practice guidelines for subcontractors in response to large disaster reconstruction demands. By using case study methods, this research identified the challenges faced by subcontracting businesses in resourcing Christchurch recovery projects; identified the workforce resourcing strategies adopted by subcontracting businesses in response to reconstruction demand; and developed a best practice guideline for subcontracting businesses in managing the workforce at the organisational and/or project level. This research offers a twofold contribution. First, it provides an overview of workforce resourcing practices in subcontracting businesses. This understanding has enabled the development of a more practical workforce resourcing guideline for subcontractors. Second, it promotes evidence-informed decision-making in subcontractors’ workforce resourcing. Dynamics in workforce resourcing and their multifaceted interactions were explicitly depicted in this research. More importantly, this research provides a framework to guide policy development in producing a sustainable solution to skill shortages and establishing longterm national skill development initiatives. Taken together, this research derives a research agenda that maps under-explored areas relevant for further elaboration and future research. Prospective researchers can use the research results in identifying gaps and priority areas in relation to workforce resourcing

Research papers, University of Canterbury Library

The level of destruction from the 2011 Christchurch earthquakes led to changes in the New Zealand seismic building code. The destruction showed that the NZ building codes did not fully performed to expectation and needed Improvement to ensure that impact of future earthquakes would be minimised. The building codes have been amended to improve buildings resilience to earthquake and other related extreme loading conditions. Rebuilding Christchurch with the new modifications in the seismic building code comes with its own unique challenges to the entire system. This project investigates the impact of rebuilding Christchurch with the new seismic Building codes in terms of how the new changes affected the building industry and the management of construction.

Images, UC QuakeStudies

Photograph captioned by BeckerFraserPhotos, "Clarendon Tower (left), Westpac Bank (centre), Grant Thornton building (white right of the Westpac in the distance), ANZ Bank (white with vertical stripes below the Grant Thornton), BNZ bank (red), and Holiday Inn (right) all under demolition, viewed from Alice in Videoland".

Images, UC QuakeStudies

An aerial photograph of High, Lichfield, Manchester, and Tuam Streets. The photographs has been captioned by BeckerFraserPhotos, "High Street can be seen running from the bottom left to the top right of the photograph. The old Majestic Theatre is prominent halfway up on the left. The prominent streets are Lichfield Street (on the left) and Tuam Street (on the right)".

Videos, UC QuakeStudies

A video of Adam McGrath, Jess Shanks and Alice Ryan Williams from Lyttelton band The Eastern singing songs to people in the community. The song recipients were nominated by family, friends or workmates, and in total seven people were chosen, including a teacher, office worker and traffic controller. The video and event were organised by All Right?. The video was distributed by The Press and was posted to the All Right? Facebook Timeline in October 2014.

Images, UC QuakeStudies

An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "High Street runs across this photograph in the top third from the old Majestic Theatre at the intersection of Manchester and Lichfield Streets to the intersection of Madras and St Asaph Street which is just beyond the edge of the photo".

Images, UC QuakeStudies

An aerial photograph of the Christchurch central city. The photograph has been captioned by BeckerFraserPhotos, "The central city, with the Majestic Theatre in the centre of the photograph. Lichfield Street runs from bottom left diagonally up the photograph to the top right. The City Council building is prominent in the bottom left corner and Latimer Square in the top left corner".

Research papers, The University of Auckland Library

The rapid classification of building damage states or placards after an earthquake is vital for enabling an efficient emergency response and informed decision-making for rehabilitation and recovery purposes. Traditional methods rely heavily on inspector-led on-site surveys, which are often time-consuming, resource-intensive, and susceptible to human error. This study introduces a machine learning-supported surrogate model designed to streamline the assessment of building damage, focusing on the automated assignment of damage placards within the context of New Zealand's post-earthquake evaluation frameworks. The study evaluates two key safety evaluation protocols—Rapid Building Assessment (RBA) and Detailed Damage Evaluation (DDE)—and integrates corresponding databases derived from the 2010–2011 Canterbury Earthquake Sequence (CES) in Christchurch. Six ML classifiers—Multilayer Perceptron (MLP), Random Forest (RF), Support Vector Machine (SVM), K-Nearest Neighbours (KNN), Gradient Boosting Classifier (GBC), and Gradient Bagging (GBag)—were rigorously tested across both databases. The results indicate that the RF-based surrogate model outperforms the other classifiers across both RBA and DDE protocols. Two distinct sets of critical predictors have been further identified for each protocol, allowing for the rapid retrieval of essential data for future on-site surveys, while retaining the RF model's predictive accuracy. The developed surrogate model provides a pragmatic tool for practising engineers to rapidly assign placards to damaged structures and for policymakers and building owners to make informed recovery decisions for earthquake-affected buildings