Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Ngai Tahu Property development manager Gordon Craig inspects the damage".
Photograph captioned by Fairfax, "The new Christchurch Council building has suffered only cosmetic damage in the September 4th earthquake. Ngai Tahu Property development manager Gordon Craig inspects the damage".
Photograph captioned by Fairfax, "Christchurch begins the slow recovery process after last weeks devastating 7.1 earthquake. The historic MLC Building on Manchester Street is due for demolition. Manchester Courts".
The performance of buildings in recent New Zealand earthquakes (Canterbury, Seddon and Kaikōura), delivered stark lessons on seismic resilience. Most of our buildings, with a few notable exceptions, performed as our Codes intended them to, that is, to safeguard people from injury. Many buildings only suffered minor structural damage but were unable to be reused and occupied for significant periods of time due to the damage and failure of non-structural elements. This resulted in substantial economic losses and major disruptions to our businesses and communities. Research has attributed the damage to poor overall design coordination, inadequate or lack of seismic restraints for non structural elements and insufficient clearances between building components to cater for the interaction of non structural elements under seismic actions. Investigations have found a clear connection between the poor performance of non-structural elements and the issues causing pain in the industry (procurement methods, risk aversion, the lack of clear understanding of design and inspection responsibility and the need for better alignment of the design codes to enable a consistent integrated design approach). The challenge to improve the seismic performance of non structural elements in New Zealand is a complex one that cuts across a diverse construction industry. Adopting the key steps as recommended in this paper is expected to have significant co-benefits to the New Zealand construction industry, with improvements in productivity alongside reductions in costs and waste, as the rework which plagues the industry decreases.
The University of Canterbury's CEISMIC project is building a digital archive of earthquake-related information
Page 6 of Section O of the Christchurch Press, published on Wednesday 23 February 2011.
Page 16 of Section A of the Christchurch Press, published on Wednesday 27 June 2012.
Page 3 of Section A of the Christchurch Press, published on Wednesday 13 April 2011.
Page 1 of Section A of the Christchurch Press, published on Thursday 5 July 2012.
Page 8 of Section C of the Christchurch Press, published on Saturday 28 January 2012.
Page 5 of Section A of the Christchurch Press, published on Saturday 26 October 2013.
Page 14 of Section A of the Christchurch Press, published on Wednesday 2 March 2011.
Page 13 of Section A of the Christchurch Press, published on Saturday 26 March 2011.
Page 2 of Section A of the Christchurch Press, published on Tuesday 24 December 2013.
Page 3 of Section A of the Christchurch Press, published on Friday 6 December 2013.
Page 8 of Section A of the Christchurch Press, published on Monday 9 December 2013.
Page 11 of Section A of the Christchurch Press, published on Tuesday 1 April 2014.
Page 3 of Section A of the Christchurch Press, published on Friday 22 February 2013.
Page 7 of Section A of the Christchurch Press, published on Friday 13 December 2013.
Page 5 of Section A of the Christchurch Press, published on Tuesday 18 September 2012.
Page 3 of Section C of the Christchurch Press, published on Saturday 15 September 2012.
Page 4 of Section A of the South Island edition of the Christchurch Press, published on Monday 9 May 2011.
A video showing part of the demolition of the Ozone Hotel in New Brighton. Steve Taylor comments "She put up a good fight. The Ozone in New Brighton was damaged in the February earthquake in Christchurch, New Zealand. Here is the main corner of the structure being, as they say, deconstructed. At the end there is a reverent bow by the excavator. Just before this the claw had caught on the floor/ceiling and the whole building shook from side to side, but it still stayed in place."
Light timber framed (LTF) structures provide a cost-effective and structurally efficient solution for low-rise residential buildings. This paper studies seismic performance of single-storey LTF buildings sheathed by gypsum-plasterboards (GPBs) that are a typical lining product in New Zealand houses. Compared with wood-based structural panels, GPBs tend to be more susceptible to damage when they are used in bracing walls to resist earthquake loads. This study aims to provide insights on how the bracing wall irregularity allowed by the current New Zealand standard NZS 3604 and the in-plane rigidity of ceiling diaphragms affect the overall seismic performance of these GPB-braced LTF buildings. Nonlinear time-history analyses were conducted on a series of single-storey baseline buildings with different levels of bracing wall irregularities and ceiling diaphragm rigidity. The results showed significant torsional effect caused by the eccentric bracing wall layout with semi-rigid/rigid ceiling diaphragms. On average, bracing wall drift demand caused by the extreme bracing wall irregularities was three times of that in the regular bracing wall layout under the rigid diaphragm assumption. This finding agreed well with the house survey after the 2011 Canterbury Earthquake in which significantly more damage was observed in the houses with irregular bracing wall layouts and relatively rigid diaphragms. Therefore, it is recommended to limit the level of bracing wall eccentricity and ensure the sufficiently rigid diaphragms to avoid excessive damage in these LTF buildings in future events.
Implementing seismic risk mitigation is a major challenge in many earthquake prone regions. The objective of this research is to investigate how property investment market practices can be used to enhance building owners’ decisions to improve seismic performance of earthquake prone buildings (EPBs). A case study method adopted, revealed the impacts of the property market stakeholders’ practices on seismic retrofit decisions. The findings from this research provide significant new insights on how property market-based incentives such as such as mandatory disclosure of seismic risks in all transactions in the property market, effective awareness seismic risk program and a unified earthquake safety assessment information system, can be used to enhance EPBs owners seismic retrofit decisions. These market-based incentives offer compelling reasons for the different property market stakeholders and the public at large to retain, care, invest, and act responsibly to rehabilitate EPBs. The findings suggest need for stakeholders involved in property investment and retrofit decisions to work together to foster seismic rehabilitation of EPBs.
Emily Cooper, who worked as a reporter in the CTV building, which was destroyed by the earthquake.
A digitally manipulated photograph of a building on Poplar Lane. The photographer comments, "I felt that this building had a real Italian feel about it. It is actually in Christchurch, New Zealand. It appears on the list to be partially demolished after the Christchurch earthquake, so it might not be around for much longer".
Photograph captioned by Fairfax, "Christchurch Earthquake. People searching for missing family and friends report to the Papanui Police to file reports. Omar Elhadad after reporting people missing in the CTV building".
A video about the demolition of the Manchester Courts on the corner of Manchester and Hereford Streets. The video includes an interview with Richard Peebles, the co-owner of the building.
Photograph captioned by Fairfax, "Christchurch earthquake. The Press makeshift news room in the paper sales building Gloucester Street after The Press was declared unsafe after a large aftershock caused further damage".