Search

found 1948 results

Images, eqnz.chch.2010

A bit of the now demolished QEII (Queen Elizabeth II) Park running track in the "Gap Filler" on the old Deka site in New Brighton (last occupied by a charity barn before a major fire and subsequent demolition).

Images, UC QuakeStudies

Wheelbarrows belonging to the Student Volunteer Army stacked up outside the UCSA's "Big Top". The tent was erected to provide support for students at the University of Canterbury in the aftermath of the 22 February 2011 earthquake.

Images, UC QuakeStudies

Damage to the south-west corner of the Cathedral of the Blessed Sacrament. A section of wall has collapsed, exposing the rooms within. Some of the stones have fallen onto a vehicle parked nearby. The photographer comments, "A bike ride around the CBD. Catholic Cathedral, Barbadoes St".

Images, UC QuakeStudies

Reconstruction work on Terrace on the Park Apartments. Two of the building required urgent demolition, while the others in the complex are being cleared out for demolition. Some furniture from the apartments can been seen on the balcony, whereas in other apartments, deconstructed furnishings can be seen.

Images, UC QuakeStudies

Students sit outside the InTentCity 6.3 Cafe, which was set up in a tent in the Law car park while University of Canterbury buildings were closed for structural testing. The photographer comments, "The University restarts its teaching, and the techies in e-learning move out of NZi3".

Images, UC QuakeStudies

A photograph of members of the Wellington Emergency Management Office Emergency Response Team and the New Zealand Police standing on the corner of Worcester and Barbadoes Streets. In the background several emergency response vehicles are parked on the street.

Images, UC QuakeStudies

A photograph looking west down Armagh Street towards the intersection with Colombo Street. In the background, a crane is parked on the road next to the Forsyth Barr Building. In the foreground, the pavement has risen near the tram tracks.