A final year paper prepared by University of Canterbury students examining the positive effects of SCIRT on the New Zealand construction industry's health and safety performance.
A document which outlines how to work safely at height and depth, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to keep site staff and public safe around mobile plant, created to discuss with site staff at on-site "toolbox talks".
A document which outlines how to keep site staff and public safe around traffic, created to discuss with site staff at on-site "toolbox talks".
A paper which outlines what had been achieved by SCIRT's Training Team, and proposing an approach to ensure that the learnings from SCIRT be transferred to wider industry.
A presentation to the IPWEA conference of a paper which shares the process followed for the assessment and prioritisation of the retaining walls within the Port Hills in Christchurch.
A plan which sets out how SCIRT will carry out internal communication over the life of its programme of work. The first version of this plan was produced on 24 January 2011.
A plan which defines the framework for performance measurement to align SCIRT with the objectives from the Alliance Agreement objectives. The first version of this plan was produced on 20 August 2011.
A plan which defines the risk and opportunity management activities to be applied by SCIRT to meet SCIRT objectives. The first version of this plan was produced on 12 September 2011.
A pdf copy of one of a series of presentations which Red Cross presented to SCIRT, telling them about what the community is undergoing and how Red Cross helps.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A document describing the use of a remotely operated hydraulic jaw crusher to avoid the need to make confined space entries.
A document describing Downer's planned approach for neutralising the high pH of any potential bentonite or grout discharge into the Avon river.
A pdf copy of a PowerPoint presentation prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
A paper for the SCIRT Board which requests that the Board provide support to recruit a Project Manager to support the development of a civil trade qualification.
A document which outlines how to work safely with powered plant and tools, created to discuss with site staff at on-site "toolbox talks".
A copy of the award application which SCIRT, the Christchurch City Council, Environment Canterbury and Beca submitted for the New Zealand Planning Institute Best Practice Award in February 2013.
A plan which describes how SCIRT would manage the risks associated with rebuilding horizontal infrastructure within Christchurch's central city area. The first version of this plan was produced on 24 October 2013.
An example of a briefing provided to support staff hosting an event so they fully understood their roles and the focus of the event. The document was created in 2012.
A plan which documents the process SCIRT will follow to identify and pass on learnings from its programme of work. The first version of this plan was produced on 21 June 2016.
A conference paper prepared for the 4th Australasian Engineering Heritage Conference which outlines the challenges faced by SCIRT when repairing the Armagh Bridge, Colombo Bridge and Antigua Bridge.
A paper delivered at Building a Better New Zealand (BBNZ 2014) Conference. The paper examines the relationship between innovation and productivity improvement in the construction industry.
The roof of a tram stop resting on blocks on the lawn outside the Arts Centre. In front is a bust of Sir Miles Warren, a prominent Christchurch architect.
A photograph of campervans parked in Hagley Park. These were used as temporary accommodation for many emergency management personnel who travelled to Christchurch after the 22 February 2011 earthquake.
A photograph of a hallway in a building in the Christchurch city centre. Concrete blocks and other rubble fill the stairwell on the left-hand side of the hallway.
A photograph of campervans parked in Hagley Park. These were used as temporary accommodation for many emergency management personnel who travelled to Christchurch after the 22 February 2011 earthquake.
A photograph of campervans parked in Hagley Park. These were used as temporary accommodation for many emergency management personnel who travelled to Christchurch after the 22 February 2011 earthquake.
A photograph of the earthquake damage to a room inside a house in Christchurch. Large sections of the plaster have crumbled from the walls, revealing the brick wall underneath.
An aerial photograph looking north-east over the Christchurch CBD. The brightly coloured roofs of the Re:Start mall can be seen in the bottom centre of the photograph.