Livelihood holds the key to a rapid recovery following a large-scale devastating disaster, building its resilience is of paramount importance. While much attention has been given to how to help people who are displaced from their jobs to regain employment, little research on livelihood resilience has been undertaken for those relocated communities following a disaster event. By studying five re-located villages post-2004 Indian Ocean Tsunami in Banda Aceh and Aceh Besar, Indonesia, this research has identified the indicators of livelihood resilience and the critical factors driving it for post-disaster relocated communities. A mixed approach, combining questionnaire surveys, semistructured interviews, and field observations, was used for the collection of data. Housing entitlement, the physical and mental health of residents, access to external livelihood support and the provision of infrastructure and basic services were identified as amongst the most critical indicators that represent the level of livelihood resilience. Early recovery income support, physical and mental health, availability and timeliness of livelihood support, together with cultural sensitivity and governance structure, are amongst the most important factors. Given the nature of resettlement, access to infrastructure, location of relocated sites, the safety of the neighbourhood and the ability to transfer to other jobs/skills also play an important role in establishing sustained employment for relocated communities in Indonesia. Those indicators and factors were synthesised into a framework which was further tested in the recovery of Christchurch, and Kaikoura, New Zealand during their recovery from devastating earthquakes. It is suggested that the framework can be used by government agencies and aid organisations to assess the livelihood resilience of post-disaster relocated communities. This will help better them plan support policies and/or prioritise resilience investment strategies to ensure that the recovery needs of those relocated are best met.
Since September 2010 Christchurch, New Zealand, has experienced a number of significant earthquakes. In addition to loss of life, this has resulted in significant destruction to infrastructure, including road corridors; and buildings, especially in the central city, where it has been estimated that 60% of buildings will need to be rebuilt. The rebuild and renewal of Christchurch has initially focused on the central city under the direction of the Christchurch City Council. This has seen the development of a draft Central City Plan that includes a number of initiatives that should encourage the use of the bicycle as a mode of transport. The rebuild and renewal of the remainder of the city is under the jurisdiction of a specially set up authority, the Christchurch Earthquake Recovery Authority (CERA). CERA reports to an appointed Minister for Canterbury Earthquake Recovery, who is responsible for coordinating the planning, spending, and actual rebuilding work needed for the recovery. Their plans for the renewal and rebuild of the remainder of the city are not yet known. This presentation will examine the potential role of the bicycle as a mode of transport in a rebuilt Christchurch. The presentation will start by describing the nature of damage to Christchurch as a result of the 2010 and 2011 earthquakes. It will then review the Central City Plan (the plan for the rebuild and renewal for central Christchurch) focusing particularly on those aspects that affect the role of the bicycle. The potential for the success of this plan will be assessed. It will specifically reflect on this in light of some recent research in Christchurch that examined the importance of getting infrastructure right if an aim of transport planning is to attract new people to cycle for utilitarian reasons.
The New Zealand city of Christchurch suffered a series of devastating earthquakes in 2010-11 that changed the urban landscape forever. A new rebuilt city is now underway, largely based on the expressed wishes of the populace to see Christchurch return to being a more people-oriented, cycle-friendly city that it was known for in decades past. Currently 7% of commuters cycle to work, supported by a 200km network of mostly conventional on-road painted cycle lanes and off-road shared paths. The new "Major Cycleways" plan aims to develop approximately 100km of high-quality cycling routes throughout the city in 5-7 years. The target audience is an unaccompanied 10-year-old cycling, which requires more separated cycleways and low-volume/speed "neighbourhood greenways" to meet this standard. This presentation summarises the steps undertaken to date to start delivering this network. Various pieces of research have helped to identify the types of infrastructure preferred by those currently not regularly cycling, as well as helping to assess the merits of different route choices. Conceptual cycleway guidelines have now been translated into detailed design principles for the different types of infrastructure being planned. While much of this work is based on successful designs from overseas, including professional advice from Dutch practitioners, an interesting challenge has been to adapt these designs as required to suit local road environments and road user expectations. The first parts of the new network are being rolled out now, with the hope that this will produce an attractive and resilient network for the future population that leads to cycling being a major part of the local way of life.
The Canterbury region of New Zealand experienced a sequence of strong earthquakes during 2010-2011. Responses included government acquisition of many thousands of residential properties in the city of Christchurch in areas with severe earthquake effects. A large and contiguous tract of this ‘red zoned’ land lies in close proximity to the Ōtākaro / Avon River and is known as the Avon-Ōtākaro Red Zone (AORZ). The focus of this study was to provide an overview of the floodplain characteristics of the AORZ and review of international experience in ecological restoration of similar river margin and floodplain ecosystems to extract restoration principles and associated learnings. Compared to pre-earthquake ground levels, the dominant trend in the AORZ is subsidence, together with lateral movement especially in the vicinity of waterway. An important consequence of land subsidence in the lower Ōtākaro / Avon River is greater exposure to flooding and the effects of sea level rise. Scenario modelling for sea level rise indicates that much of the AORZ is exposed to inundation within a 100 year planning horizon based on a 1 m sea level rise. As with decisions on built infrastructure, investments in nature-based ‘green infrastructure’ also require a sound business case including attention to risks posed by climate change. Future-proofing of the expected benefits of ecological restoration must therefore be secured by design. Understanding and managing the hydrology and floodplain dynamics are vital to the future of the AORZ. However, these characteristics are shared by other floodplain and river restoration projects worldwide. Identifying successful approaches provides a useful a source of useful information for floodplain planning in the AORZ. This report presents results from a comparative case study of three international examples to identify relevant principles for large-scale floodplain management at coastal lowland sites.
A video of a press conference with Christchurch Mayor Lianne Dalziel and Raf Manji, Chair of the Christchurch City Council Finance Committee, about the KordaMentha report. KordaMentha is an independent auditing firm which specialises in insolvencies and corporate recovery. The report analysed the Christchurch City Council's three year budgeting plan and the financial strategies that lay behind it. Much of this budget dealt with the challenges in Christchurch caused by the 2010 and 2011 earthquakes. Dalziel talks about the cost of mending Christchurch's infrastructure, the Council's insurance settlement, and the need to address the findings in the report. Manji talks about the Council's financial options following the report.
We present the initial findings from a study of adaptive resilience of lifelines organisations providing essential infrastructure services, in Christchurch, New Zealand following the earthquakes of 2010-2011. Qualitative empirical data was collected from 200 individuals in 11 organisations. Analysis using a grounded theory method identified four major factors that aid organisational response, recovery and renewal following major disruptive events. Our data suggest that quality of top and middle-level leadership, quality of external linkages, level of internal collaboration, ability to learn from experience, and staff well-being and engagement influence adaptive resilience. Our data also suggest that adaptive resilience is a process or capacity, not an outcome and that it is contextual. Post-disaster capacity/resources and post-disaster environment influence the nature of adaptive resilience.
As the future of the world’s oil reserves becomes progressively more uncertain, it is becoming increasingly important that steps are taken to ensure that there are viable, attractive alternatives to travel by private motor vehicle. As with many of New Zealand’s major urban centres, Christchurch is still exceptionally reliant on private motor vehicles; although a significant proportion of the population indicate that they would like to cycle more, cycling is still an underutilised mode of transport. Following a series of fatal earthquakes that struck the city in 2010 and 2011, there has been the need to significantly redevelop much of the city’s horizontal infrastructure – subsequently providing the perfect platform for significant changes to be made to the road network. Many of the key planning frameworks governing the rebuild process have identified the need to improve Christchurch’s cycling facilities in order to boost cycling numbers and cyclist safety. The importance of considering future growth and travel patterns when planning for transport infrastructure has been highlighted extensively throughout literature. Accordingly, this study sought to identify areas where future cycle infrastructure development would be advantageous based on a number of population and employment projections, and likely future travel patterns throughout the city. Through the use of extensive GIS analysis, future population growth, employment and travel patterns for Christchurch city were examined in order to attain an understanding of where the current proposed major cycleways network could be improved, or extended. A range of data and network analysis were used to derive likely travel patterns throughout Christchurch in 2041. Trips were derived twice, once with a focus on simply finding the shortest route between each origin and destination, and then again with a focus on cyclist safety and areas where cyclists were unlikely to travel. It was found that although the proposed major cycleways network represents a significant step towards improving the cycling environment in Christchurch, there are areas of the city that will not be well serviced by the current proposed network in 2041. These include a number of key residential growth areas such as Halswell, Belfast and Prestons, along with a number of noteworthy key travel zones, particularly in areas close to the central city and key employment areas. Using network analysis, areas where improvements or extensions to the proposed network would be most beneficial were identified, and a number of potential extensions in a variety of areas throughout the city were added to the network of cycle ways. Although it has been found that filling small gaps in the network can have considerable positive outcomes, results from the prioritisation analysis suggested that initially in Christchurch demand is likely to be for more substantial extensions to the proposed major cycleways network.
In four frames a man watches the news on TV. He hears that 'Severe aftershocks continue as the demolition crew move into the red zone.. amidst the badly damaged infrastructure..' His wife offers him a cup of tea and assumes the report is about Christchurch but it is not, it is about 'Phil Goff & Labour' Context - Christchurch continues to have aftershocks following the February 22 earthquake and the Labour Party is suffering one bodyblow after another - the last being the Darren Hughes affair. This is disastrous for Labour because the 2011 election is in November. Quantity: 1 digital cartoon(s).
JAN TINETTI to the Minister of Education: What actions has the Government taken to increase the number of New Zealanders participating in vocational education? Hon PAUL GOLDSMITH to the Minister of Finance: What measures, if any, does he have in place to ensure New Zealanders receive good value for money from the Government’s major spending initiatives? Hon JUDITH COLLINS to the Minister of Housing: Will there be any further delays to the conclusion of the KiwiBuild reset, including due to the resignation of the KiwiBuild head of delivery? Dr DUNCAN WEBB to the Minister for Courts: What recent reports has he seen regarding the Canterbury Earthquakes Insurance Tribunal? Hon NIKKI KAYE to the Associate Minister of Education: Does she stand by her statement regarding learning support coordinator allocations, “I’m pleased, I’m really pleased. I know there are people complaining, and that’s OK. We seem to live in a world where somebody’s got to complain about everything”? Hon MARK MITCHELL to the Minister responsible for Pike River Re-entry: Does he stand by all his statements, policies, and actions on the Pike River Mine? ANGIE WARREN-CLARK to the Minister for the Environment: What action is the Government taking to enhance urban development and protect elite soils? TODD MULLER to the Minister of Agriculture: Does he have confidence in New Zealand’s agricultural sector? Hon DAVID BENNETT to the Minister of Corrections: Does he stand by his statement, “We have never had to manage a prisoner like this before”, in relation to the alleged Christchurch gunman? JENNY MARCROFT to the Minister for Infrastructure: What recent announcements has he made regarding the New Zealand Infrastructure Commission-Te Waihanga? BRETT HUDSON to the Minister of Transport: Can he rule out any further increases in transport taxes or charges under this Government? DENISE LEE to the Minister for Women: Why did she say yesterday that the equal pay legislation was in select committee when it was reported back on 13 May, and has been sitting on the Order Paper for three months?
Questions to Ministers 1. RAHUI KATENE to the Associate Minister of Health: When was the Core Clinical Committee established in Kawerau and how are iwi involved in the membership and functions of this joint taskforce to tackle youth suicide? 2. DAVID BENNETT to the Minister for Infrastructure: What progress is the Government making on its infrastructure investment programme? 3. Hon ANNETTE KING to the Prime Minister: What advice did he rely on when commenting in Australia on the safety of the Pike River coal mine? 4. NICKY WAGNER to the Minister of Corrections: What support has the Corrections Department provided in Canterbury since the first earthquake struck in September last year? 5. Hon DAVID PARKER to the Minister of Finance: Does he believe that in the current economic environment kiwi companies should be considered favourably with regards to big government contracts? 6. TIM MACINDOE to the Minister for Social Development and Employment: What parenting support is being made available for first-time parents? 7. Hon TREVOR MALLARD to the Prime Minister: In light of the answer given on his behalf to Oral Question No 2 on 15 June, is it his opinion that real average after-tax wages do not go up when high-income earners get tax cuts and low-income workers lose their jobs? 8. PAUL QUINN to the Minister of Customs: What recent reports has he received on developments to technology at the border? 9. GRANT ROBERTSON to the Minister of Health: Has sufficient funding been allocated in Vote Health to meet the increasing costs facing organisations working in the health sector? 10. KEVIN HAGUE to the Minister of Labour: Was she satisfied before the first explosion in the Pike River coal mine, that her Government had done all it could to ensure the workplace safety of people working in underground coal mines; if so, why? 11. COLIN KING to the Minister of Fisheries: What recent announcement has he made about the recovery of the western hoki stock? 12. DARIEN FENTON to the Minister of Labour: Does she stand by all her answers to Oral Question No 10 yesterday?
Following the devastation of the Canterbury earthquake sequence a unique opportunity exists to rebuild and restructure the city of Christchurch, ensuring that its infrastructure is constructed better than before and is innovative. By installing an integrated grid of modern sensor technologies into concrete structures during the rebuild of the Christchurch CBD, the aim is to develop a network of self-monitored ‘digital buildings’. A diverse range of data will be recorded, potentially including parameters such as concrete stresses, strains, thermal deformations, acoustics and the monitoring of corrosion of reinforcement bars. This procedure will allow an on-going complete assessment of the structure’s performance and service life, both before and after seismic activity. The data generated from the embedded and surface mounted sensors will be analysed to allow an innovative and real-time health monitoring solution where structural integrity is continuously known. This indication of building performance will allow the structure to alert owners, engineers and asset managers of developing problems prior to failure thresholds being reached. A range of potential sensor technologies for monitoring the performance of existing and newly constructed concrete buildings is discussed. A description of monitoring work conducted on existing buildings during the July 2013 Cook Strait earthquake sequence is included, along with details of current work that investigates the performance of sensing technologies for detecting crack formation in concrete specimens. The potential market for managing the real-time health of installed infrastructure is huge. Civil structures all over the world require regular visual inspections in order to determine their structural integrity. The information recorded during the Christchurch rebuild will generate crucial data sets that will be beneficial in understanding the behaviour of concrete over the complete life cycle of the structure, from construction through to operation and building repairs until the time of failure. VoR - Version of Record
On November 14 2016 a magnitude 7.8 earthquake struck the south island of New Zealand. The earthquake lasted for just two minutes with severe seismic shaking and damage in the Hurunui and Kaikōura districts. Although these are predominantly rural areas, with scattered small towns and mountainous topography, they also contain road and rail routes that are essential parts of the national transport infrastructure. This earthquake and the subsequent recovery are of particular significance as they represent a disaster following in close proximity to another similar disaster, with the Canterbury earthquakes occurring in a neighboring district five years earlier. The research used an inductive qualitative case study to explore the nature of the Kaikōura recovery. That recovery process involved a complex interplay between the three parties; (a) the existing local government in the district, (b) central government agencies funding the recovery of the local residents and the national transport infrastructure, and (c) recovery leaders arriving with recent expertise from the earlier Canterbury disaster. It was evident that three groups: locals, government, and experts represented a multi-party governance debate in which the control of the Kaikōura earthquake recovery was shared amongst them. Each party had their own expertise, adgenda and networks that they brought to the Kaikōura recovery, but this created tensions between external expertise and local, community leadership. Recent earthquake research suggests that New Zealand is currently in the midst of an earthquake cluster, with further seismic disasters likely to occur in relatively close succession. This is likely to be compounded by the increasing frequency of other natural disasters with the effects of climate change. The present study investigates a phenomenon that may become increasingly common, with the transfer of disaster expertise from one event to another, and the interface between those experts with local and national government in directing recoveries. The findings of this study have implications for practitioners and policy makers in NZ and other countries where disasters are experienced in close spatial and temporal proximity.
Wellington is located on a fault line which will inevitably, one day be impacted by a big earthquake. Due to where this fault line geographically sits, the central city and southern suburbs may be cut off from the rest of the region, effectively making these areas an ‘island’. This issue has absorbed a lot of attention, in particular at a large scale by many different fields: civil engineering, architecture, infrastructure planning & design, policymaking. Due to heightened awareness, and evolved school of practice, contemporary landscape architects deal with post-disaster design – Christchurch, NZ has seen this. A number of landscape architects work with nature, following increased application of ecological urbanism, and natural systems thinking, most notably at larger scales. To create parks that are designed to flood, or implement projects to protect shorelines. A form of resilience less often considered is how design for the small scale - people’s 1:1 relationship with their immediate context in exterior space - can be influential in forming a resilient response to the catastrophe of a major earthquake. This thesis intends to provide a response to address the shift of scales, as a paradigm for preparation and recovery. After a large-scale earthquake, state and civic policies and agencies may or subsequentially not go into action. The most important thinking and acting will be what happens in the minds, and the immediate needs, of each and every person; and how they act communally. This is considered in general social terms in state and civic education programmes of civil defence, for example, but much less considered in how the physical design of the actual spaces we inhabit day-to-day can educate us to be mentally prepared to help each other survive a catastrophe. Specifically, the identification of design of typologies can provide these educative functions. Typology inherently a physical form or manipulation of a generic and substantial prototype applicable in contexts is something that exists in the mind. Working with the physical and social appearance and experience of typologies can also/will change people’s minds. Socially, and economically driven, the community-building power of community gardening is well-proven and documented, and a noticeably large part of contemporary landscape architecture. The designs of this thesis will focus on community gardening specifically to form typologies of resilience preparation and response to disaster. The foundation will remain at the small scale of the local community. The specific question this thesis poses: Can we design local typologies in landscape architecture to integrate community gardens, with public space by preparing for and acting as recovery from a disaster?
Roger Sutton, former chief executive of the the power lines company, Orion and since June 2011 Chief Executive Officer of the Canterbury Earhquake Recovery Authority, is shown in a straitjacket, raving. An unseen interviewer asks him how it feels after 'two years in the job'. Roger Sutton's work in leading the Earthquake Authority after the February earthquake was extremely stressful, considering the magnitude of the task. Quantity: 1 digital cartoon(s).
Study region: Christchurch, New Zealand. Study focus: Low-lying coastal cities worldwide are vulnerable to shallow groundwater salinization caused by saltwater intrusion and anthropogenic activities. Shallow groundwater salinization can have cascading negative impacts on municipal assets, but this is rarely considered compared to impacts of salinization on water supply. Here, shallow groundwater salinity was sampled at high spatial resolution (1.3 piezometer/km²), then mapped and spatially interpolated. This was possible due to a uniquely extensive set of shallow piezometers installed in response to the 2010–11 Canterbury Earthquake Sequence to assess liquefaction risk. The municipal assets located within the brackish groundwater areas were highlighted. New hydrological insights for the region: Brackish groundwater areas were centred on a spit of coastal sand dunes and inside the meander of a tidal river with poorly drained soils. The municipal assets located within these areas include: (i) wastewater and stormwater pipes constructed from steel-reinforced concrete, which, if damaged, are vulnerable to premature failure when exposed to chloride underwater, and (ii) 41 parks and reserves totalling 236 ha, within which salt-intolerant groundwater-dependent species are at risk. This research highlights the importance of determining areas of saline shallow groundwater in low-lying coastal urban settings and the co-located municipal assets to allow the prioritisation of sites for future monitoring and management.
The Canterbury region of New Zealand was shaken by major earthquakes on the 4th September 2010 and 22nd February 2011. The quakes caused 185 fatalities and extensive land, infrastructure and building damage, particularly in the Eastern suburbs of Christchurch city. Almost 450 ha of residential and public land was designated as a ‘Red Zone’ unsuitable for residential redevelopment because land damage was so significant, engineering solutions were uncertain, and repairs would be protracted. Subsequent demolition of all housing and infrastructure in the area has left a blank canvas of land stretching along the Avon River corridor from the CBD to the sea. Initially the Government’s official – but enormously controversial – position was that this land would be cleared and lie fallow until engineering solutions could be found that enabled residential redevelopment. This paper presents an application of a choice experiment (CE) that identified and assessed Christchurch residents’ preferences for different land use options of this Red Zone. Results demonstrated strong public support for the development of a recreational reserve comprising a unique natural environment with native fauna and flora, healthy wetlands and rivers, and recreational opportunities that align with this vision. By highlighting the value of a range of alternatives, the CE provided a platform for public participation and expanded the conversational terrain upon which redevelopment policy took place. We conclude the method has value for land use decision-making beyond the disaster recovery context.
The 22 February 2011, Mw6.2-6.3 Christchurch earthquake is the most costly earthquake to affect New Zealand, causing 181 fatalities and severely damaging thousands of residential and commercial buildings, and most of the city lifelines and infrastructure. This manuscript presents an overview of observed geotechnical aspects of this earthquake as well as some of the completed and on-going research investigations. A unique aspect, which is particularly emphasized, is the severity and spatial extent of liquefaction occurring in native soils. Overall, both the spatial extent and severity of liquefaction in the city was greater than in the preceding 4th September 2010 Darfield earthquake, including numerous areas that liquefied in both events. Liquefaction and lateral spreading, variable over both large and short spatial scales, affected commercial structures in the Central Business District (CBD) in a variety of ways including: total and differential settlements and tilting; punching settlements of structures with shallow foundations; differential movements of components of complex structures; and interaction of adjacent structures via common foundation soils. Liquefaction was most severe in residential areas located to the east of the CBD as a result of stronger ground shaking due to the proximity to the causative fault, a high water table approximately 1m from the surface, and soils with composition and states of high susceptibility and potential for liquefaction. Total and differential settlements, and lateral movements, due to liquefaction and lateral spreading is estimated to have severely compromised 15,000 residential structures, the majority of which otherwise sustained only minor to moderate damage directly due to inertial loading from ground shaking. Liquefaction also had a profound effect on lifelines and other infrastructure, particularly bridge structures, and underground services. Minor damage was also observed at flood stop banks to the north of the city, which were more severely impacted in the 4th September 2010 Darfield earthquake. Due to the large high-frequency ground motion in the Port hills numerous rock falls and landslides also occurred, resulting in several fatalities and rendering some residential areas uninhabitable.
The suburb of New Brighton in Christchurch Aotearoa was once a booming retail sector until the end of its exclusivity to Saturday shopping in 1980 and the aftermath of the devastating 2011 Christchurch earthquake. The suburb of New Brighton was hit particularly hard and fell into economic collapse, partly brought on by the nature of its economic structure. This implosion created an urban crisis where people and businesses abandoned the suburb and its once-booming commercial economy. As a result, New Brighton has been left with the residue of abandoned infrastructure and commercial propaganda such as billboards, ATM machines, commercial facades, and shopping trolleys that as abandoned fragments, no longer contribute to culture, society and the economy. This design-led research investigation proposes to repurpose the broken objects that were left behind. By strategically selecting objects that are symbols of the root cause of the economic devastation, the repurposed and re-contextualised fragments will seek to allegorically expose the city’s destructive economic narrative, while providing a renewed sense of place identity for the people. This design-led thesis investigation argues that the seemingly innocuous icons of commercial industry, such as billboards, ATM machines, commercial facades, and shopping trolleys, are intended to act as lures to encourage people to spend money; ultimately, these urban and architectural lures can contribute to economic devastation. The aim of this investigation is to repurpose abandoned fragments of capitalist infrastructure in ways that can help to unveil new possibilities for a disrupted community and enhance their awareness of what led to the urban disruption. The thesis proposes to achieve this research aim by exploring three principal research objectives: 1) to assimilate and re-contextualise disconnected urban fragments into new architectural interventions; 2) to anthropomorphise these new interventions so that they are recognisable as architectural ‘inhabitants’, the storytellers of the urban context; and 3) to curate these new architectural interventions in ways that enable a community-scale allegorical and didactic experience to be recognised.
Improving community resilience requires a way of thinking about the nature of a community. Two complementary aspects are proposed: the flows connecting the community with its surrounding environment and the resources the community needs for its ongoing life. The body of necessary resources is complex, with many interactions between its elements. A systems approach is required to understand the issues adequately. Community resilience is discussed in general terms together with strategies for improving it. The ideas are then illustrated and amplified by an extended case study addressing means of improving the resilience of a community on the West Coast of New Zealand to natural disasters. The case study is in two phases. The first relies on a mix of on-the-ground observations and constructed scenarios to provide recommendations for enhancing community resilience, while the second complements the first by developing a set of general lessons and issues to be addressed from observations of the Christchurch earthquakes of 2010 and 2011.
Modern cities are surprisingly dependent on tourism and competition among them for tourist dollars—both domestically and internationally—can be extreme. New Zealand’s second city, Christchurch, is no exception. In 2009, tourism reportedly earned $2.3 billion and accounted for more than 12 per cent of the region’s employment. Then came a series of devastating earthquakes that claimed 185 lives and decimated the city’s infrastructure. More than 10,000 earthquakes and aftershocks have radically altered Christchurch’s status as a tourism destination. Two years on, what is being done to recover from one of the world’s largest natural disasters? Can the “Garden City” reassert itself as a highly-desirable Australasian destination with a strong competitive advantage over rivals that have not been the target of natural disasters.
The 14 November 2016 Kaikōura earthquake had major impacts on New Zealand's transport system. Road, rail and port infrastructure was damaged, creating substantial disruption for transport operators, residents, tourists, and business owners in the Canterbury, Marlborough and Wellington regions, with knock-on consequences elsewhere. During both the response and recovery phases, a large amount of information and data relating to the transport system was generated, managed, analysed, and exchanged within and between organisations to assist decision making. To improve information and data exchanges and related decision making in the transport sector during future events and guide new resilience strategies, we present key findings from a recent post-earthquake assessment. The research involved 35 different stakeholder groups and was conducted for the Ministry of Transport. We consider what transport information was available, its usefulness, where it was sourced from, mechanisms for data transfer between organisations, and suggested approaches for continued monitoring.
When disasters and crises, both man-made and natural, occur, resilient higher education institutions adapt in order to continue teaching and research. This may necessitate the closure of the whole institution, a building and/or other essential infrastructure. In disasters of large scale the impact can be felt for many years. There is an increasing recognition of the need for disaster planning to restructure educational institutions so that they become more resilient to challenges including natural disasters (Seville, Hawker, & Lyttle, 2012).The University of Canterbury (UC) was affected by seismic events that resulted in the closure of the University in September 2010 for 10 days and two weeks at the start of the 2011 academic year This case study research describes ways in which e-learning was deployed and developed by the University to continue and even to improve learning and teaching in the aftermath of a series of earthquakes in 2010 and 2011. A qualitative intrinsic embedded/nested single case study design was chosen for the study. The population was the management, support staff and educators at the University of Canterbury. Participants were recruited with purposive sampling using a snowball strategy where the early key participants were encouraged to recommend further participants. Four sources of data were identified: (1) documents such as policy, reports and guidelines; (2) emails from leaders of the colleges and academics; (3) communications from senior management team posted on the university website during and after the seismic activity of 2010 and 2011; and (4) semi-structured interviews of academics, support staff and members of senior management team. A series of inductive descriptive content analyses identified a number of themes in the data. The Technology Acceptance Model 2 (Venkatesh & Davis, 2000) and the Indicator of Resilience Model (Resilient Organisations, 2012) were used for additional analyses of each of the three cases. Within the University case, the cases of two contrasting Colleges were embedded to produce a total of three case studies describing e-learning from 2000 - 2014. One contrast was the extent of e-learning deployment at the colleges: The College of Education was a leader in the field, while the College of Business and Law had relatively little e-learning at the time of the first earthquake in September 2010. The following six themes emerged from the analyses: Communication about crises, IT infrastructure, Availability of e-learning technologies, Support in the use of e-learning technologies, Timing of crises in academic year and Strategic planning for e-learning. One of the findings confirmed earlier research that communication to members of an organisation and the general public about crises and the recovery from crises is important. The use of communication channels, which students were familiar with and already using, aided the dissemination of the information that UC would be using e-learning as one of the options to complete the academic year. It was also found that e-learning tools were invaluable during the crises and facilitated teaching and learning whilst freeing limited campus space for essential activities and that IT infrastructure was essential to e-learning. The range of e-learning tools and their deployment evolved over the years influenced by repeated crises and facilitated by the availability of centrally located support from the e-Learning support team for a limited set of tools, as well as more localised support and collaboration with colleagues. Furthermore, the reasons and/or rate of e-learning adoption in an educational institution during crises varied with the time of the academic year and the needs of the institution at the time. The duration of the crises also affected the adoption of e-learning. Finally, UC’s lack of an explicit e-learning strategy influenced the two colleges to develop college-specific e-learning plans and those College plans complemented the incorporation of e-learning for the first time in the University’s teaching and learning strategy in 2013. Twelve out of the 13 indicators of the Indicators of Resilience Model were found in the data collected for the study and could be explained using the model; it revealed that UC has become more resilient with e-learning in the aftermath of the seismic activities in 2010 and 2011. The interpretation of the results using TAM2 demonstrated that the adoption of technologies during crises aided in overcoming barriers to learning at the time of the crisis. The recommendations from this study are that in times of crises, educational institutions take advantage of Cloud computing to communicate with members of the institution and stakeholders. Also, that the architecture of a university’s IT infrastructure be made more resilient by increasing redundancy, backup and security, centralisation and Cloud computing. In addition, when under stress it is recommended that new tools are only introduced when they are essential.
Text top left reads 'A tale of two quakes' In the first frame a man runs from 'radiation leaks' yelling 'The end of the world!' and in the second frame a man runs from the notion 'No World Cup?' yelling 'The end of the world!' Context - the terrible earthquake and tsunami in Japan 11 March 2011 that have led to the overheating of several nuclear power plants that are leaking radiation and threaten a nuclear catastrophe and the Christchurch earthquakes of 4 September 2010 and 22 February 2011 that have led to the decision that because of the amount of damage to the venue plus infrastructures and accommodation for visitors the Rugby World Cup will not be played in Christchurch. Quantity: 1 digital cartoon(s).
Hon DAVID PARKER to the Minister of Finance: Does he stand by his answer on Tuesday regarding jobs "I think that the number of 170,000 may come from the initial Budget forecast for 2009, perhaps. I cannot remember the year exactly."? Dr KENNEDY GRAHAM to the Minister for Climate Change Issues: Given the recent loss of Māori Party support for his Climate Change Response (Emissions Trading and Other Matters) Amendment Bill, will he consider working with opposition parties on amendments to improve it? LOUISE UPSTON to the Minister of Finance: How is the Government's infrastructure programme contributing to building a more competitive economy? Hon DAVID CUNLIFFE to the Minister for Economic Development: Does he agree with the NZIER shadow board that "the growth outlook for the second half of 2012 looks weak and unemployment remains stubbornly high."? IAN McKELVIE to the Minister for Social Development: What announcements has she made to review Child Youth and Family's complaints process? Hon MARYAN STREET to the Minister of Health: What progress has been made in the delivery of the Prime Minister's Youth Mental Health Project announced in April of this year with an extra $11.3 million provided to support it? JACQUI DEAN to the Minister for the Environment: What reports has she received on the time taken for decisions on notified consents issued under the Resource Management Act 1991? GARETH HUGHES to the Minister of Foreign Affairs: Why did New Zealand pull out of a joint proposal with the United States to create a marine reserve in Antarctica's Ross Sea? Rt Hon WINSTON PETERS to the Prime Minister: Does he stand by the answers he gave yesterday to supplementary question 5 on Oral Question No 7 and supplementary question 3 on Oral Question No 12? NICKY WAGNER to the Minister for Canterbury Earthquake Recovery: What progress has the Government made to support repairing damaged houses and infrastructure following the Canterbury earthquakes? SUE MORONEY to the Prime Minister: Does he stand by his statement on 3News last night, on the subject of Business New Zealand's assertion that women need retraining when returning to employment after extended parental leave that "no. It wouldn't be my view"? JAMI-LEE ROSS to the Minister of Immigration: What is the Government doing to ensure that New Zealanders have first priority for jobs in the Canterbury rebuild?
The Christchurch region of New Zealand experienced a series of major earthquakes and aftershocks between September 2010 and June 2011 which caused severe damage to the city’s infrastructure. The performance of tilt-up precast concrete buildings was investigated and initial observations are presented here. In general, tilt-up buildings performed well during all three major earthquakes, with mostly only minor, repairable damage occurring. For the in-plane loading direction, both loadbearing and cladding panels behaved exceptionally well, with no significant damage or failure observed in panels and their connections. A limited number of connection failures occurred due to large out-of-plane panel inertia forces. In several buildings, the connections between the panel and the internal structural frame appeared to be the weakest link, lacking in both strength and ductility. This weakness in the out-of-plane load path should be prevented in future designs.
On 4 September 2010, a magnitude Mw 7.1 earthquake struck the Canterbury region on the South Island of New Zealand. The epicentre of the earthquake was located in the Darfield area about 40 km west of the city of Christchurch. Extensive damage was inflicted to lifelines and residential houses due to widespread liquefaction and lateral spreading in areas close to major streams, rivers and wetlands throughout Christchurch and Kaiapoi. Unreinforced masonry buildings also suffered extensive damage throughout the region. Despite the severe damage to infrastructure and residential houses, fortunately, no deaths occurred and only two injuries were reported in this earthquake. From an engineering viewpoint, one may argue that the most significant aspects of the 2010 Darfield Earthquake were geotechnical in nature, with liquefaction and lateral spreading being the principal culprits for the inflicted damage. Following the earthquake, an intensive geotechnical reconnaissance was conducted to capture evidence and perishable data from this event. This paper summarizes the observations and preliminary findings from this early reconnaissance work.
New Zealand lies on the Pacific Ring of Fire – the belt of vulnerable, unpredictable fault lines which are the primary cause for earthquakes in this country. Most recently, as evident in the aftermath of the 2011 Christchurch earthquake -the destruction of the city centre led to the emergence of sub centres in different parts of the city each with different, desperate needs. The lack of preparedness in the wake of an earthquake hence, exacerbated this destitution. This research explores architecture’s role in the sub-centre. How can architecture facilitate resilience through this decentralised typology? The design-led approach critiques the implications of architecture as a tool for resilience whilst highlighting the desperate need for the engagement of architecture in planning before a disaster strikes. The resulting response explores resilience through an architectural lens that has a wider infrastructural, contextual and user-focussed need.
Shows a postman who has just put an 'Earthquake bill' for '$8.5 billion' into the government's letterbox. Context - The New Zealand government will spend about 8.5 billion NZ dollars (6.6 billion U.S. dollars) over the next few years rebuilding Christchurch. New Zealand Finance Minister Bill English said on Tuesday that the Treasury has estimated the direct cost of the two earthquakes is about 5.5 billion NZ dollars), which will be fully provided for in the Budget in May. He said about 3 billion NZ dollars of that relates to thegovernment's share of local government infrastructure, roads, insurance excesses on schools and housing, land remediation from the September quake, demolition, Accidents Compensation Corporation scheme and the business support package. (Xinhuanet 12 April 2011) Quantity: 1 digital cartoon(s).
Sewerage systems convey sewage, or wastewater, from residential or commercial buildings through complex reticulation networks to treatment plants. During seismic events both transient ground motion and permanent ground deformation can induce physical damage to sewerage system components, limiting or impeding the operability of the whole system. The malfunction of municipal sewerage systems can result in the pollution of nearby waterways through discharge of untreated sewage, pose a public health threat by preventing the use of appropriate sanitation facilities, and cause serious inconvenience for rescuers and residents. Christchurch, the second largest city in New Zealand, was seriously affected by the Canterbury Earthquake Sequence (CES) in 2010-2011. The CES imposed widespread damage to the Christchurch sewerage system (CSS), causing a significant loss of functionality and serviceability to the system. The Christchurch City Council (CCC) relied heavily on temporary sewerage services for several months following the CES. The temporary services were supported by use of chemical and portable toilets to supplement the damaged wastewater system. The rebuild delivery agency -Stronger Christchurch Infrastructure Rebuild Team (SCIRT) was created to be responsible for repair of 85 % of the damaged horizontal infrastructure (i.e., water, wastewater, stormwater systems, and roads) in Christchurch. Numerous initiatives to create platforms/tools aiming to, on the one hand, support the understanding, management and mitigation of seismic risk for infrastructure prior to disasters, and on the other hand, to support the decision-making for post-disaster reconstruction and recovery, have been promoted worldwide. Despite this, the CES in New Zealand highlighted that none of the existing platforms/tools are either accessible and/or readable or usable by emergency managers and decision makers for restoring the CSS. Furthermore, the majority of existing tools have a sole focus on the engineering perspective, while the holistic process of formulating recovery decisions is based on system-wide approach, where a variety of factors in addition to technical considerations are involved. Lastly, there is a paucity of studies focused on the tools and frameworks for supporting decision-making specifically on sewerage system restoration after earthquakes. This thesis develops a decision support framework for sewerage pipe and system restoration after earthquakes, building on the experience and learning of the organisations involved in recovering the CSS following the CES in 2010-2011. The proposed decision support framework includes three modules: 1) Physical Damage Module (PDM); 2) Functional Impact Module (FIM); 3) Pipeline Restoration Module (PRM). The PDM provides seismic fragility matrices and functions for sewer gravity and pressure pipelines for predicting earthquake-induced physical damage, categorised by pipe materials and liquefaction zones. The FIM demonstrates a set of performance indicators that are categorised in five domains: structural, hydraulic, environmental, social and economic domains. These performance indicators are used to assess loss of wastewater system service and the induced functional impacts in three different phases: emergency response, short-term recovery and long-term restoration. Based on the knowledge of the physical and functional status-quo of the sewerage systems post-earthquake captured through the PDM and FIM, the PRM estimates restoration time of sewer networks by use of restoration models developed using a Random Forest technique and graphically represented in terms of restoration curves. The development of a decision support framework for sewer recovery after earthquakes enables decision makers to assess physical damage, evaluate functional impacts relating to hydraulic, environmental, structural, economic and social contexts, and to predict restoration time of sewerage systems. Furthermore, the decision support framework can be potentially employed to underpin system maintenance and upgrade by guiding system rehabilitation and to monitor system behaviours during business-as-usual time. In conjunction with expert judgement and best practices, this framework can be moreover applied to assist asset managers in targeting the inclusion of system resilience as part of asset maintenance programmes.
An exceedingly large 'Gerry' Brownlee, the Minister for Earthquake Recovery, rises from a chair, holding a briefcase labeled 'CERA' and calling for 'Bob' Parker, the mayor of Christchurch. The thin Parker was flattened against Brownlee's enormous rear, when Brownlee sat on the chair. Brownlee and Parker had a strained relationship, with the government taking an increasing amount of control in local decision making. After ongoing assurances by Parker that Christchurch City Council would meet all of International Accreditation New Zealand's requirements on issuing building consents, Brownlee announced in June 2013 without Parker's prior knowledge that the authority had withdrawn its accreditation. Quantity: 1 digital cartoon(s).