Search

found 2341 results

Audio, Radio New Zealand

Monday's 10 year anniversary of the devastating earthquake that took the lives of 185 people in Christchurch, will be marked with a special service near the city's earthquake memorial. Large crowds are expected from half past twelve this afternoon on the lawn just across the river from the memorial wall. Among those speaking is the prime minister, Jacinda Ardern. A message from former mayor, Sir Bob Parker, will be read out. Sir Bob, who led the city through one of its most challenging periods, recently suffered a major stroke and heart attack. The names of the 185 who died will be read before a minute's silence at twelve fifty one, the exact moment the quake struck. Flowers will then be laid at the memorial wall.

Images, eqnz.chch.2010

Edgeware Supervalue Supermarket being demolished after the 6.3 magnitude quake hit Christchurch 22 February 2011. ♥An attempt to capture the movement of the wall coming down with 3 exposure and HDR processing.

Research papers, The University of Auckland Library

As part of a seismic retrofit scheme, surface bonded glass fiber-reinforced polymer (GFRP) fabric was applied to two unreinforced masonry (URM) buildings located in Christchurch, New Zealand. The unreinforced stone masonry of Christchurch Girls’ High School (GHS) and the unreinforced clay brick masonry Shirley Community Centre were retrofitted using surface bonded GFRP in 2007 and 2009, respectively. Much of the knowledge on the seismic performance of GFRP retrofitted URM was previously assimilated from laboratory-based experimental studies with controlled environments and loading schemes. The 2010/2011 Canterbury earthquake sequence provided a rare opportunity to evaluate the GFRP retrofit applied to two vintage URM buildings and to document its performance when subjected to actual design-level earthquake-induced shaking. Both GFRP retrofits were found to be successful in preserving architectural features within the buildings as well as maintaining the structural integrity of the URM walls. Successful seismic performance was based on comparisons made between the GFRP retrofitted GHS building and the adjacent nonretrofitted Boys’ High School building, as well as on a comparison between the GFRP retrofitted and nonretrofitted walls of the Shirley Community Centre building. Based on detailed postearthquake observations and investigations, the GFRP retrofitted URM walls in the subject buildings exhibited negligible to minor levels of damage without delamination, whereas significant damage was observed in comparable nonretrofitted URM walls. AM - Accepted Manuscript

Images, UC QuakeStudies

The damaged Provincial Council Legislative Chamber on Durham Street in the aftermath of the 22 February earthquake. The building's roof and walls have collapsed, as has the scaffolding which was erected to repair it after the 4 September earthquake.

Images, UC QuakeStudies

A photograph of a badly-damaged shop on Colombo Street. The front wall of the top storey of the building has crumbled into the street, exposing the inside of the building. Steel and wooden bracing is keeping the ceiling up.