Search

found 15155 results

Images, UC QuakeStudies

The west-side of the Arts Centre along Rolleston Avenue near the entrance to the Botanic Gardens. Wire fencing and road cones have been placed around the building as a cordon. To the left, a crane is parked next to the building. The spire has been removed and braced on the footpath to limit damage.

Images, UC QuakeStudies

A photograph of a paste-up depicting Roger Sutton, the CEO of CERA, with a band-aid over his mouth; Warwick Isaacs, the Deputy Chief Executive of CERA, with hearing protection over his ears; and Jerry Brownlee, Minister for Canterbury Earthquake Recovery, with a blindfold over his eyes. The paste-up has been stuck on a bus stop timetable.

Images, UC QuakeStudies

The north-west end of the Arts Centre on the corner of Rolleston Avenue and Worcester Boulevard. The tip of the gable is missing as well as the spire which has been removed and braced on the footpath to limit damage. Wire fencing and road cones have been placed around the building as a cordon. In the distance, a crane is working on the building.

Images, UC QuakeStudies

A photograph of a paste-up depicting Roger Sutton, the CEO of CERA, with a band-aid over his mouth; Warwick Isaacs, the Deputy Chief Executive of CERA, with hearing protection over his ears; and Jerry Brownlee, Minister for Canterbury Earthquake Recovery, with a blindfold over his eyes. The paste-up has been stuck on a wall.

Images, UC QuakeStudies

A photograph of the entrance to the Crowne Plaza Hotel. The window to the left has been boarded up with plywood, and tape has been placed in front to keep the area clear. A green sticker can be seen in the window to the right, indicating that the hotel is safe to enter.

Images, UC QuakeStudies

A photograph of a map of Christchurch in a temporary Civil Defence headquarters set up at the Mainland Foundation Ballpark after the 4 September 2010 earthquake. Red, green and blue markings on the map indicate where flooding, sand and closures are located. Post-it notes and a key with a tag reading, "Manchester" are attached to the map.

Images, UC QuakeStudies

A photograph of a paste-up depicting Roger Sutton, the CEO of CERA, with a band-aid over his mouth; Warwick Isaacs, the Deputy Chief Executive of CERA, with hearing protection over his ears; and Jerry Brownlee, Minister for Canterbury Earthquake Recovery, with a blindfold over his eyes. The paste-up has been stuck on a sign board attached to a cordon fence.

Images, UC QuakeStudies

Damage to Christchurch city following the 22 February earthquake 2011. A collapsed building on the corner of Ferry Road and Lancaster Street. The brick walls of the building have crumbled, bringing the roof down with them. The wall of the building opposite has been exposed, and there is now a doorway to nowhere.

Images, UC QuakeStudies

A photograph of a barbeque brunch and public talk opposite the former Christchurch City Council offices on Tuam Street. The design team from Sustainable Habitat Challenge discussed the build of a sub-consent, off-grid office for Life in Vacant Spaces Trust. The event was part of FESTA 2012.

Images, UC QuakeStudies

A view down Cashel Street from the Bridge of Remembrance, showing earthquake damage to several buildings along Cashel Mall. In the background the Hotel Grand Chancellor can be seen, a Christchurch hotel that was badly damaged in the February 2011 earthquake. The collapse of a key supporting shear wall caused the building to visibly lean to one side.

Images, UC QuakeStudies

A view down Maling Street in Avonside showing damage to the road surface and the footpath that has resulted from the 4 September 2010 earthquake. Beside the footpath the blue lids of septic tanks can be seen. These tanks were installed in front of Avonside properties to allow residents to use their toilets after the earthquake.

Images, UC QuakeStudies

An aerial photograph captioned by BeckerFraserPhotos, "This aerial photo of the Square, taken on 13 December 2011, shows the Novotel, the Marque Hotel, the Millenium Hotel and Heritage Hotel. These hotels all have significant work to do, and mostly have an opening date of 2013".