A photograph of a room in the Diabetes Centre which has been sectioned off using plastic sheeting.
A photograph of a crack in the floor of the Diabetes Centre. The crack has been filled in and two planks have been placed on either side of the crack. Written on the planks is, "Do not step".
A photograph of a corridor in the Diabetes Centre. Plastic sheeting has been used to cover the carpet while the corridor is repaired.
A photograph of a room in the Diabetes Centre which has been prepared for repairs. The furniture has been stacked one side of the room and plastic sheeting has been used to cover the carpet.
A photograph of a room in the Diabetes Centre which has been walled off using tarpaulins. Cracks in the wall have been filled with epoxy resin.
A photograph of a room in the Diabetes Centre with building materials in the corner. Plastic sheeting has been placed over the carpet and has been used to create a temporary wall on the right.
A photograph of a repaired patch of wall in the stairwell of the Diabetes Centre on Hagley Avenue. The wall is unpainted.
A photograph of an office in the Diabetes Centre which has been prepared for earthquake repair work. Furniture and other office materials have been stacked in the corner of the room. Several tiles are missing from the ceiling above.
A photograph of a gap between two wall panels at the Diabetes Centre on Hagley Avenue.
A photograph of a green sticker on the window of the Diabetes Centre on Hagley Avenue. The sticker was placed on the building after the 4 September 2010 earthquake, indicating that has been inspected and is safe to enter.
A photograph of a crack in the wall panelling above a window in the Diabetes Centre.
A photograph of a tradesperson who has been painting a stairwell of the Diabetes Centre.
A photograph of casters which have broken off a desk at the Diabetes Centre on Hagley Avenue. The casters broke off during the 4 September 2010 earthquake.
A photograph of the Diabetes Centre on Hagley Avenue, taken from the car park.
A photograph of a yellow sticker on the window of the Diabetes Centre on Hagley Avenue. The sticker was placed on the building after the 4 September 2010 earthquake, indicating that access to the building was restricted. The engineer who surveyed the building describes the damage to the building as follows: "Panel damaged and displaced at rear - area cordoned off. Loose soffit linings. Damage to ceiling".
A photograph of a room in the Diabetes Centre which has been made ready for painting. The carpet has been covered in plastic and the furniture removed from the room. Painters scaffolding has also been set up inside the room.
A photograph of the Diabetes Centre on Hagley Avenue, taken from the car park.
A photograph of an office in the Diabetes Centre. Several filing cabinets have toppled, and the files have spilt across the floor.
A photograph of a panel hanging from the ceiling of the Diabetes Centre.
A photograph of a room in the Diabetes Centre with missing ceiling tiles.
A photograph of a panel hanging from the ceiling of the Diabetes Centre.
A photograph of a room in the Diabetes Centre which has been sectioned off using plastic sheeting.
A photograph of plastic sheeting blocking off a room in the Diabetes Centre on Hagley Avenue.
A photograph of a corridor in the Diabetes Centre. Desktops and whiteboards have been stacked against the wall to the left.
A photograph of a kitchen in the Diabetes Centre. The panelling has been removed from the wall of the kitchen, exposing the wooden frame and several pipes and wires.
A photograph of a ceiling in the Diabetes Centre with several missing panels.
A photograph of a displaced roof panel in the Diabetes Centre on Hagley Avenue. The panel was displaced during the 4 September 2010 earthquake.
A photograph of several filing cabinets in the Diabetes Centre which have opened and toppled over.
A photograph of files which have spilled out from the moveable stacks at the Diabetes Centre.
A photograph of the stairwell of the Diabetes Centre on Hagley Avenue. The hand rail on the right side has been removed from the wall and placed on the stairs while the walls are fixed and repainted. The gib has been removed from the facing wall.