Following the Christchurch earthquake of 22 February 2011 a number of researchers were sent to Christchurch, New Zealand to document the damage to masonry buildings as part of “Project Masonry”. Coordinated by the Universities of Auckland and Adelaide, researchers came from Australia, New Zealand, Canada, Italy, Portugal and the US. The types of masonry investigated were unreinforced clay brick masonry, unreinforced stone masonry, reinforced concrete masonry, residential masonry veneer and churches; masonry infill was not part of this study. This paper focuses on the progress of the unreinforced masonry (URM) component of Project Masonry. To date the research team has completed raw data collection on over 600 URM buildings in the Christchurch area. The results from this study will be extremely relevant to Australian cities since URM buildings in New Zealand are similar to those in Australia.
Micro - electro - mechanical system (MEMS) based accelerometers are now frequently used in many different parts of our day - to - day lives. It is also increasingly being used for structural testing applications. Researchers have had res ervation of using these devices as they are relatively untested, but now with the wider adoption, it provides a much cheaper and more versatile tool for structural engineering researchers. A number of damaged buildings in the Christchurch Central Business District (CBD) were instrumented with a number of low - cost MEMS accelerometers after the major Christchurch earthquakes. The accelerometers captured extremely high quality building response data as the buildings experienced thousands of aftershocks. This d ata set was amongst one of only a handful of data set s available around the world which provides building response data subjected to real ground motion. Furthermore, due to technological advances, a much larger than usual number of accelerometers has been deployed making the data set one of the most comprehensive available. This data set is utilised to extract modal parameters of the buildings. This paper summarises the operating requirements and preference for using such accelerometers for experimental mod al analysis. The challenges for adapting MEMS based devices for successful modal parameters identification are also discussed.
Ingham and Biggs were in Christchurch during the M6.3, 22 February 2011 earthquake and Moon arrived the next day. They were enlisted by officials to provide rapid assessment of buildings within the Central Business District (CBD). In addition, they were asked to: 1) provide a rapid assessment of the numbers and types of buildings that had been damaged, and 2) identify indicator buildings that represent classes of structures that can be used to monitor changing conditions for each class following continuing aftershocks and subsequent damage. This paper explains how transect methodology was incorporated into the rapid damage assessment that was performed 48 hours after the earthquake. Approximately 300 buildings were assessed using exterior Level 1 reporting techniques. That data was used to draw conclusions on the condition of the entire CBD of approximately 4400 buildings. In the context of a disaster investigation, a transect involves traveling a selected path assessing the condition of the buildings and documenting the class of each building, and using the results in conjunction with prior knowledge relating to the overall population of buildings affected in the area of the study. Read More: http://ascelibrary.org/doi/abs/10.1061/9780784412640.033
The performance of retrofitted unreinforced masonry (URM) bearing wall buildings in Christchurch is examined, considering ground motion recordings from multiple events. Suggestions for how the experiences in Christchurch might be relevant to retrofit practices common to New Zealand, U.S. and Canada are also provided. Whilst the poor performance of unretrofitted URM buildings in earthquakes is well known, much less is known about how retrofitted URM buildings perform when subjected to strong ground shaking.
This paper shows an understanding of the availability of resources in post-disaster reconstruction and recovery in Christchurch, New Zealand following its September 4, 2010 and February 22, 2011 earthquakes. Overseas experience in recovery demonstrates how delays and additional costs may incur if the availability of resources is not aligned with the reconstruction needs. In the case of reconstruction following Christchurch earthquakes, access to normal resource levels will be insufficient. An on-line questionnaire survey, combined with in-depth interviews was used to collect data from the construction professionals that had been participated in the post-earthquake reconstruction. The study identified the resources that are subject to short supply and resourcing challenges that are currently faced by the construction industry. There was a varied degree of impacts felt by the surveyed organisations from resource shortages. Resource pressures were primarily concentrated on human resources associated with structural, architectural and land issues. The challenges that may continue playing out in the longer-term reconstruction of Christchurch include limited capacity of the construction industry, competition for skills among residential, infrastructure and commercial sectors, and uncertainties with respect to decision making. Findings provide implications informing the ongoing recovery and rebuild in New Zealand. http://www.iiirr.ucalgary.ca/Conference-2012
Test results are presented for wall-diaphragm plate anchor connections that were axially loaded to rupture. These connection samples were extracted post-earthquake by sorting through the demolition debris from unreinforced masonry (URM) buildings damaged in the Christchurch earthquakes. Unfortunately the number of samples available for testing was small due to the difficulties associated with sample collection in an environment of continuing aftershocks and extensive demolition activity, when personal safety combined with commercial activity involving large demolition machinery were imperatives that inhibited more extensive sample collection for research purposes. Nevertheless, the presented data is expected to be of assistance to structural engineers undertaking seismic assessment of URM buildings that have existing wall-diaphragm anchor plate connections installed, where it may be necessary to estimate the capacity of the existing connection as an important parameter linked with determining the current seismic capacity of the building and therefore influencing the decision regarding whether supplementary connections should be installed.
The 2010/2011 Canterbury earthquakes have provided a unique opportunity to investigate the seismic performance of both traditional and modern buildings constructed in New Zealand. It is critical that the observed performance is examined and compared against the expected levels of performance that are outlined by the Building Code and Design Standards. In particular, in recent years there has been a significant amount of research into the seismic behaviour of precast concrete floor systems and the robustness of the support connections as a building deforms during an earthquake. An investigation of precast concrete floor systems in Christchurch has been undertaken to assess both the performance of traditional and current design practice. The observed performance for each type of precast floor unit was collated from a number of post-earthquake recognisance activities and compared against the expected performance determined for previous experimental testing and analysis. Possible reasons for both the observed damage, and in some cases the lack of damage, were identified. This critical review of precast concrete floor systems will assist in determining the success of current design practice as well as identify any areas that require further research and/or changes to design standards.
As part of the ‘Project Masonry’ Recovery Project funded by the New Zealand Natural Hazards Research Platform, commencing in March 2011, an international team of researchers was deployed to document and interpret the observed earthquake damage to masonry buildings and to churches as a result of the 22nd February 2011 Christchurch earthquake. The study focused on investigating commonly encountered failure patterns and collapse mechanisms. A brief summary of activities undertaken is presented, detailing the observations that were made on the performance of and the deficiencies that contributed to the damage to approximately 650 inspected unreinforced clay brick masonry (URM) buildings, to 90 unreinforced stone masonry buildings, to 342 reinforced concrete masonry (RCM) buildings, to 112 churches in the Canterbury region, and to just under 1100 residential dwellings having external masonry veneer cladding. Also, details are provided of retrofit techniques that were implemented within relevant Christchurch URM buildings prior to the 22nd February earthquake. In addition to presenting a summary of Project Masonry, the broader research activity at the University of Auckland pertaining to the seismic assessment and improvement of unreinforced masonry buildings is outlined. The purpose of this outline is to provide an overview and bibliography of published literature and to communicate on-going research activity that has not yet been reported in a complete form. http://sesoc.org.nz/conference/programme.pdf
A photograph of an installation titled 'In Your Face'. The installation is part of the LUXCITY event. Tutor: Fraser Horton
An artist's impression of the installation 'eLITE', created as part of the LUXCITY event. Tutors: Cameron Rowe, Kate Rogan
An artist's impression of the LUXCITY event. The image depicts installations on Gloucester and Colombo Streets. Student: Erica Austin
A photograph of crowds at the LUXCITY event.
An artist's impression of the installation 'In Your Face', created as part of the LUXCITY event. Tutor: Fraser Horton
An artist's impression of the installation 'Atmosphere', created as part of the LUXCITY event. Tutor: Sue Hillery
A snapshot from GPS Boomerang's SmartBird flight over the Christchurch red zone on 23 December 2012, looking over the Town Hall and Victoria Square with the site of the Crowne Plaza Hotel visible in the bottom left, GapFiller's Pallet Pavillion now in the space.
An artist's impression of the installation 'Tonic', created as part of the LUXCITY event. Tutors: Annabel Pretty, Cesar Wagner, Peter McPherson
An artist's impression of the installation 'In Your Face', created as part of the LUXCITY event. Tutor: Fraser Horton
An artist's impression of the installation 'Etch-a-Sketch', created as part of the LUXCITY event. Tutors: Anna Tong, Chris Holmes
A montage of photographs of the installation 'Tonic', created as part of the LUXCITY event. Tutors: Annabel Pretty, Cesar Wagner, Peter McPherson
A photograph of an installation on the corner of Manchester Street and Worcester Street. The installation is titled "Archrobatics", and is part of the LUXCITY event.
Various walls on the street of Christchurch have become public art spaces. This work, "The Phoenix", by professional graffiti artists, Jacob, aka Yikes, Nick, aka Icarus and Wongi includes a fire Phoenix and the words "Christchurch destined to rise". Above it is an advertisement for Phonequip.
An artist's impression of the installation 'Etch-a-Sketch', created as part of the LUXCITY event. Tutors: Anna Tong, Chris Holmes
The front of Christ Church Cathedral. The upper wall has crumbled leaving the inside space exposed. Steel bracing has been placed against the front wall to limit further damage. A walkway from Gloucester Street to the Square was opened up for a few days to allow the public a closer look at the cathedral.
A montage of photographs of the creation of the installation 'Tonic'. The installation is part of the LUXCITY event. Tutors: Annabel Pretty, Cesar Wagner, Peter McPherson
A photograph of an installation that forms part of the '60 Lights Market' at the LUXCITY event. Coordinators: Jeongbin Ok, Tiago Rorke, Jonathan Coates; student: Tom Hall
A photograph of crowds at the LUXCITY event. The photograph shows an installation on Worcester Street, with the new Press building in the background. The installation is titled "Murmur".
A photograph of an installation on the corner of Gloucester Street and Colombo Street. The installation is titled "Etch-a-Sketch", and is part of the LUXCITY event.
A photograph of Andrew Just of F3 Design giving a talk about ArtBox on the corner of St Asaph Street and Madras Street. The photograph was taken during a public talk about the temporary studio and gallery space. The event was part of FESTA 2012.
A panoramic photograph taken at the front of Christ Church Cathedral. The front of the cathedral has steel bracing against it to limit further damage. The upper part of the front wall has crumbled completely, exposing the inside space. The Chalice sculpture is to the right and the BNZ building can be seen in the background.
A photograph of an installation on the corner of Manchester Street and Gloucester Street. The installation is titled "60 Lights Market", and is part of the LUXCITY event.