A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A paper which outlines SCIRT's approach to asset assessment, design and repair of damaged retaining walls, and presents a case study of a retaining wall rebuild, on Cunningham Terrace, Lyttelton.
Photograph captioned by BeckerFraserPhotos, "Procope Coffee House on Victoria Street, under repair from earthquake damage".
A crane sits beside the sewage treatment ponds in Bromley. The photographer comments, "Bromley sewage treatment ponds, under repair".
A crane sits beside the sewage treatment ponds in Bromley. The photographer comments, "Bromley sewage treatment ponds, under repair".
A crane sits beside the sewage treatment ponds in Bromley. The photographer comments, "Bromley sewage treatment ponds, under repair".
A photograph of the RAD Bikes bike shed on Gloucester Street.
Photograph captioned by BeckerFraserPhotos, "Running repairs on the huge hydraulic nibbler".
Repair work being done to the Victoria Clock Tower on the corner of Montreal Street and Victoria Street.
Repair work being done to the Victoria Clock Tower on the corner of Montreal Street and Victoria Street.
Photograph captioned by BeckerFraserPhotos, "Repairing the damaged footpath at the Bridge of Remembrance, Cashel Street".
A photograph of the entrance to the RAD Bikes bike shed on Gloucester Street.
A photograph of Richard Sewell outside the RAD Bikes bike shed on Gloucester Street.
A photograph of the entrance to the RAD Bikes bike shed on Gloucester Street.
Scaffolding around store fronts on High Street.
A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.
A report which details the findings of a follow-up performance audit carried out by the Office of the Auditor-General to assess the effectiveness and efficiency of arrangements to repair Christchurch's horizontal infrastructure.
A consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
Repair work being done to the Victoria Clock Tower on the corner of Montreal Street and Victoria Street.
Tape and glue has been used to repair a window on the Cathedral of the Blessed Sacrament on Barbadoes Street.
Photograph captioned by BeckerFraserPhotos, "The almost-repaired west end of Woodham Road where the ground rose about 40 cm".
A photograph of Richard Sewell giving a talk about the RAD Bikes community shed as part of FESTA 2013.
A photograph of a partially-assembled bike on a stand at the RAD Bikes bike shed on Gloucester Street.
A guideline which provided clarity to designers, asset owners and others on the meaning of terminology to describe the type of roading works proposed/undertaken.
A photograph of Richard Sewell giving a talk about the RAD Bikes community shed as part of FESTA 2013.
Photograph captioned by BeckerFraserPhotos, "Facade of the McKenzie & Willis building corner High and Tuam Streets (to be repaired)".
A machine pumps sewage into the river in Kaiapoi. This is a temporary solution while the sewage system is being repaired.
A photograph of two young men in the RAD Bikes bike shed during a hands-on workshop as part of FESTA 2013.
A document which describes how SCIRT led the co-ordination of its huge repair programme with those of other utilities.
A paper prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.