Members of the public watching the firm "Gordonia" by Tom Reilly at Gap Filler's "Film in the Gap!" project. The film was projected onto the wall of Mitre 10 in Beckenham.
A photograph of a van parked on High Street which has been packed with items from the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes.
A photograph of workers loading a trailer with items salvaged from people's homes during the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes.
A photograph of two workers loading a truck with items from people's homes during the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes.
A photograph of a trailer loaded with items from the Residential Access Project being driven down High Street. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes.
A photograph of workers loading a trailer with items salvaged from people's homes during the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes.
The project report for Knit Happens, part of Gap Filler project 20, Walls. Knit Happens was a mural with a pattern reminiscent of a jersey. It was painted on the exposed wall of a brick building on Madras Street.
A photograph of workers from HireQuip loading a trailer with items from people's homes during the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes.
A PDF copy of pages 190-191 of the book Christchurch: The Transitional City Pt IV. The pages document the transitional project 'Gap Projects in Kaiapoi'. Photos: Gap Filler
A photograph of an Urban Search and Rescue team member examining the contents of a flat on Poplar Street during the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes. The buildings wall has crumbled leaving the room exposed.
A photograph of Danica Nel and other workers standing in line with their authorization forms for the Residential Access Project. The project gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake.
A photograph of a Christchurch City Council completed authorization form. This form was part of the Residential Access Project which gave residents temporary access within the red-zone cordon in order to retrieve items from their homes after the 22 February 2011 earthquake. Personal information has been removed from this photograph in order to protect the individual's privacy.
A diagram created in 2011, showing the communication structure across rebuild agencies.
An outline, created in 2011, of the levels of service and condition of the horizontal infrastructure within the central city, providing a broad indication of damage, service levels provided to residents and business owners, and used to estimate the cost of repairs following the earthquake events.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document outlining the methodology for rebuilding horizontal infrastructure in the central city, covering wastewater (local reticulation and trunk), wastewater pump stations, storm water (local reticulation and trunk), potable water, roads, and bridges.
A document outlining how the rebuild of wastewater, water supply, storm water and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan, developed in 2011, outlining the communication and community engagement that supported SCIRT's central city programme and kept Christchurch residents informed about this work.
A PDF copy of a spreadsheet used to identify the impacts of traffic management in the central city.
A detailed presentation created in 2011, outlining the approach to the central city rebuild and associated risk management.
A shortened version of a presentation created in 2011, outlining the approach to the central city rebuild.
A diagram illustrating how the rebuild of the three waters and roading infrastructure was to be managed and coordinated with other programmes of work in the central city.
A copy of the plan developed in 2011 to facilitate a collaborative approach between all stakeholders and minimise the impact on the traffic network, because of the extensive repair works necessary to repair vertical and horizontal infrastructure.
A copy of the plan, created in 2011, detailing how the rebuild of the three waters and road infrastructure was to be coordinated with other utility operators.
Two people relaxing at Gap Filler's first project at 832 Colombo Street.
Volunteers setting up at Gap Filler's first project at 832 Colombo Street.
A shed on at Gap Filler's first project at 832 Colombo Street.
Volunteers setting up at Gap Filler's first project at 832 Colombo Street.
A man performing at Gap Filler's first project at 832 Colombo Street.
A chart indicating hire costs for Gap Filler project 22, the Pallet Pavilion.