Yellow stickered building means restricted access, and the building will need to be repaired and certified fit for use; aftermath of the magnitude 7.1 earthquake that hit Christchurch on 4 September 2010.
A pdf copy of a PowerPoint presentation prepared for the Ozwater 2013 conference detailing the story of the damage to, and subsequent repair of, Huntsbury Reservoir.
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Photograph captioned by Fairfax, "Damage from the February 22nd earthquake in Christchurch. Chimney repair work at a house on Hackthorne Road, Cashmere".
Photograph captioned by Fairfax, "Workers from Calcon repair burst water pipes at the corner of Avonside Drive and Linwood Avenue after Saturday's earthquake".
Some Christchurch residents fear there's a risk to the region's history if headstones damaged by September's 7.1 magnitude earthquake are not repaired.
Victoria Square, the slightly less famous cousin of nearby Cathedral Square was re-opened today following $7.5 million worth of earthquake repairs.
Repairing the bush telegraph File Ref: CCL-2011-03-17-St Albans-IMG_0380 From the collection of Christchurch City Libraries.
Repairing the bush telegraph File Ref: CCL-2011-03-17-St Albans-IMG_0379 From the collection of Christchurch City Libraries.
A photograph of Wayne Smith and Ken Vickery inside the Observatory at the Christchurch Arts Centre, taken in the 1970s. Smith and Vickery are pictured next to the Townsend Telescope, which they have just refurbished. No repair work was necessary during this process.
Recent severe earthquakes, such as the 2010-2011 Christchurch earthquake series, have put emphasis on building resilience all over the world. To achieve such resilience, procedures for low damage seismic design have been developed to satisfy both life safety requirements and the need to minimize undesirable economic effects of required building repair or structural member replacement following a major earthquake. Seismic resisting systems following this concept are expected to withstand severe earthquakes without requiring major post-earthquake repairs, using isolating mechanisms or sacrificial systems that either do not need repair or are readily repairable or replaceable. These include the sliding hinge joint with asymmetric friction connections (SHJAFCs) in beam-to-column connections of the moment resisting steel frames (MRSFs) and symmetric friction connections (SFCs) in braces of the braced frames. A 9 m tall, configurable three-storey steel framed composite floor building incorporating frictionbased connections is to be tested using two linked bi-directional shake tables at the International joint research Laboratory of Earthquake Engineering (ILEE) facilities, Shanghai, China. The structural systems are configurable, allowing different moment and braced frame structural systems tested in two horizontal directions. The structure is designed and detailed to undergo, at worst, minor damage under a planned series of severe earthquakes.
Blog of Action for Christchurch East, a group campaigning for the rights of residents in the Eastern suburbs of Christchurch. Includes discussion of political and social issues, delays to insurance payments and repairs, and protest actions in response.
Repairs being carried out on this restaurant (converted from a church) at the Hereford Street / Manchester Street intersection;aftermath of the magnitude 7.1 earthquake that struck Christchurch on Saturday 4 September 2010.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
This beautiful building on Madras Street is red stickered and may be condemned if the structural damage it suffered in the magnitude 7,1 earthquake on Saturday 4 September 2010 cannot be repaired.
More than 600 Christchurch home-owners face a wait of up to 18 months before its decided who foots the bill for earthquake repairs that could cost hundreds of millions of dollars. The problem - first revealed on Checkpoint in March - is that owners bought homes thinking all quake damage had been identified and fixed - only to find more problems that weren't addressed. The people affected cannot claim on their insurance - because the damage pre-dates them buying the house - and any grant from the Earthquake Commission is capped. EQC has publicly apologised to those affected but the Minster, Megan Woods, says it's unclear who will pay for the needed repairs.
Scaffolding covering the outer walls of the James Hight Building at the University of Canterbury. The photograph has been captioned by BeckerFraserPhotos, "The repair work on the buildings at the University of Canterbury looks similar to the scenes in the CBD".
One landscape colour digital photograph taken on 19 November 2011 showing the alleyway next to 29 London Street. These steps provided access to the Wunderbar and the Monsta Bar (closed). Visible to the left is the Lyttelton Coffee Company building being repaired. Prior earthquake strengthening enabled the Lyttelton Coffee Company to undertake w...
A photograph of an office in the Diabetes Centre. The office furniture has been pushed together to prepare the room for earthquake repair work.
A variation to the consent granted by the Christchurch City Council, providing consent to carry out earthquake repair work that may affect protected vegetation.
Fletcher Construction has won the largest building contract in New Zealand history to repair half of the Canterbury homes damaged in last month's earthquake.
The owners of more than three-thousand properties damaged by the Canterbury earthquake have been told the repair job could take nearly three years.
Two years on from the February twenty second earthquake, large parts of Christchurch Hospital are a construction site as repairs to damaged wards continue.
A Christchurch construction firm says businesses who are complaining about losing money on earthquake repair jobs should work more closely with their project managers.
Christchurch council has asked its residents to tell it if earthquake repairs haven't been done so it can accurately assess their property's value.
Photograph captioned by Fairfax, "A crane lifts the turret of the top of the Great Hall at The Arts Centre for repairs after the earthquake".
Photograph captioned by Fairfax, "A crane lifts the turret of the top of the Great Hall at The Arts Centre for repairs after the earthquake".