A photograph of Fletcher Construction Operations Manager, Jack Harris, inspecting the bar of the Hotel Grand Chancellor.
A photograph captioned by Paul Corliss, "Watermark River Precinct construction starts, at the boatshed on the Avon".
A photograph captioned by Paul Corliss, "Watermark River Precinct construction starts, at the boatshed on the Avon".
A volunteer posing in his kilt on St Andrew's Day, during the construction of the Pallet Pavilion.
A photograph of construction near the site of the Crowne Plaza, corner of Kilmore, Durham and Victoria Streets.
A photograph of construction near the site of the Crowne Plaza, corner of Kilmore, Durham and Victoria Streets.
A photograph of construction near the site of the Crowne Plaza, corner of Kilmore, Durham and Victoria Streets.
Construction vehicles levelling a bank beside the Kaiapoi River in Kaiapoi to be laid with a new footpath.
Photograph captioned by BeckerFraserPhotos, "New construction of residential units at the Linwood Village, 402 Worcester Street".
A photograph of the site of the Crowne Plaza Hotel on the corner of Kilmore and Durham Streets. The hotel has been demolished into large piles of rubble which two excavators are working to clear. A sign on the cordon fence indicates that the demolition is being carried out by Grant Mackay Demolition Co. and Leigh Construction.
A photograph captioned by BeckerFraserPhotos, "Brick cladding covering up concrete slab - strong and attractive! Montreal Street".
An article that explains the innovative work of SCIRT in a post-disaster environment.
A paper published in the Management, Procurement and Law Journal Volume 168 Issue MP3, which describes a different form of alliancing.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A sign on a wire fencing around a construction site reading, "Quake repairs, keep out, for your own safety".
Photograph captioned by BeckerFraserPhotos, "60 Cashel Street under de-construction. Only the shell of the building remains".
Photograph captioned by BeckerFraserPhotos, "60 Cashel Street under de-construction. Only the shell of the building remains".
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of the EPIC Innovation Centre under construction on the corner of St Asaph Street and Manchester Street.
A photograph of four architecture students working on the construction of part of the Pavilions & Lighting Devices market for LUXCITY.
Two construction workers on Kilmore Street with hard hats and high-visibility jackets. A large pipe is running beside them.
Furniture made of recycled wood situated in an empty construction site. The furniture was part of the Gap Filler project.
Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake.
Construction equipment parked on the former site of the Oxford on Avon, seen through the cordon fencing around Victoria Square.
An award submission nominating SCIRT Women in Construction (SWIC) for the Hays NAWIC Excellence Awards 2015: Category: Helen Tippett Award.
Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake.
Urban Search and Rescue personnel escorting construction workers down Colombo Street in the aftermath of the 22 February 2011 earthquake.
An early presentation which summarises SCIRT's commercial model in a simple way.