Search

found 164 results

Images, UC QuakeStudies

A sign on the cordon fence near Victoria Square gives the opening hours for public access to the recently re-opened square. In the background, the Cathedral is visible, seen through the gap where a building has been demolished.

Images, eqnz.chch.2010

Working at getting things out of the Victoria Square before it is demolished. www.stuff.co.nz/the-press/news/christchurch-earthquake-20... What I found on my walk around the city January 15, 2014 Ch...

Images, eqnz.chch.2010

After my visit at the hospital for physiotherapy on my hand I took a walk around the city on my way home. Demolition of the Victoria Square apartments February 12, 2014 Christchurch New Zealand. www.s...

Audio, UC QuakeStudies

Part five of the audio that makes up Gap Filler's 29th project, the Transitional City Audio Tour. This part of the tour begins on Montreal Street near Cranmer Square. It includes commentary on the Cranmer Centre and the Windsor Hotel, two demolished buildings which were on the opposite corners of Armagh and Montreal Streets. The tour then moves down Armagh Street, providing commentary on the Canterbury Provincial Chambers Buildings. When the tour reaches the bridge over the Avon River, it crosses to the other side and follows the river to Gloucester Street where there is commentary on Chancery Lane. The tour then travels up Colombo Street and back to Victoria Square, with commentary on the Queen Victoria and James Cook statues. The tour finishes at the Pallet Pavilion, where it began, on the corner of Kilmore and Durham Streets.

Images, UC QuakeStudies

An aerial photograph captioned by BeckerFraserPhotos, "Victoria Square is at the centre of this picture with its green lawns and trees. The bare patch of earth in front s the demolition sites of the Allan McLean building, the Oxford on Avon, and Plunket House. The contract to demolish the Crowne Plaza Hotel has been let, while the fate of the Town Hall is still undecided. The Convention Centre is coming down. On the very bottom, slightly to the right is the Medlab building which is also to be demolished. In the bottom left corner is the PWC building which is also to be demolished".

Audio, UC QuakeStudies

Part one of the audio that makes up Gap Filler's 29th project, the Transitional City Audio Tour. This part of the tour begins at the Pallet Pavilion on the corner of Kilmore and Durham Streets. It includes commentary on the Crowne Plaza Hotel and the Town Hall, as well as the Captain Cook and Queen Victoria statues in Victoria Square. The tour then moves down Armagh Street to New Regent Street where there is a discussion of Trambiance, a series of sound performances in the Christchurch tram. The tour also includes commentary on the rebuild of New Regent Street and the Isaac Theatre Royal.

Images, UC QuakeStudies

A snapshot from GPS Boomerang's SmartBird flight over the Christchurch red zone on 5 June 2012, looking over the Town Hall and Victoria Square with the site of the Crowne Plaza Hotel visible in the bottom left.