Search

found 262 results

Images, UC QuakeStudies

Rubble from TJ's Kazbah on the corner of Marine Parade and Bowhill Road. The Ozone Hotel is visible in the foreground. The photographer comments, "A bike ride to New Brighton and the beach 3 weeks after the Feb 22 quake. Roads were still very rough and under reconstruction. There was a building on the corner, but not now".

Images, UC QuakeStudies

A van partially submerged in liquefaction. The photographer comments, "A van that unluckily drove into a hole caused by the terrible liquefaction on Beach Road, North New Brighton during the Christchurch earthquake".

Images, UC QuakeStudies

The laying of new sewers in Bridge Street, South Brighton. Road cones have been placed along the road works. Temporary road signs indicate that the current speed limit is 30 km/h. Diggers, four-wheel drive vehicles and a truck are parked beside piles of gravel and a yellow sewer pump.

Images, UC QuakeStudies

Damage to TJ's Kazbah in New Brighton. The east and north walls and part of the upper floor have collapsed, tipping rubble and the contents of the rooms out onto the street. The photographer comments, "The occupants of the business and rooms all managed to escape alive. A digger was used to make the building safe and then used to sift through the rubble for any surviving belongings. It was a very emotional time for the ex-occupants".