
The site of the Robert Falcon Scott statue. Here is what it looked like before (lining up ICE from POLICE on the Police building) www.flickr.com/photos/johnstewartnz/5921425414/in/set-721...
The South New Brighton Domain jetty into the Avon-Heathcote Estuary. A new jetty replaced an older one about 6-8 years ago, then the earthquakes happened! Before the earthquakes it was straight and level and open!
20110304_1866_1D3-24 Liquefaction [EQNZ] The last pile of liquefied silt to be cleaned up, from our lawn. #876
20100904_3322_1D3-200 Bridge Street bridge, Christchurch earthquake South Brighton Bridge. See the gap between the abutment and the bridge itself (just to right of lower person).
None
None
None
The footpath besides ANZAC Drive and the Bexley Wetlands. Liquefaction silt from well underground has flowed to the surface. Photo taken less than three hours after the 4:35am earthquake.
None
Cathedral of the Blessed Sacrameny aka Christchurch Basilica
A historic plate smashed in the February Christchurch earthquake. Ashley Gorge Scenic Reserve was established by my Great-Grandmother (maternal) many years ago.
When this building was first brought on site I spent a few hours removing the tape/paper that had been covering every window.
20100905_3336_1D3-24 Ground movement Pacific Park - Christchurch earthquake A house in Pacific Park (Bexley) that borders the Bexley Wetlands. Land moved towards the wetlands and the closer to wetlands the more severe the damage.
20130312_4425_1D3-150 South New Brighton boardwalk track [Explored] Damaged in the earthquakes, now with more bends and not level as it was before. Selected for Explore. #306 12/05/13 #3402
External stairs on the Forsyth Barr building in Christchurch. Portions of the internal stairwell collapsed during the earthquake of February 22nd 2011, necessitating use of various means of getting people out of the building. Was the fourth highest building in the city pre earthquakes, but it's future is uncertain. Was for sale "as is, where ...
Closed due to earthquake damage. But it looks in better condition than the building I work in!
20100918_3507_1D3-47 Pumping Station - Christchurch earthquake The pumping station at the corner of New Brighton Road and Palmers Road. New Brighon Road is still closed (2 weeks after quake) at this point. #403
Sewer repairs due to earthquake damage have our street totally closed off apart from pedestrian traffic down the footpath.
None
20161211_0216_1D3-24 Six years on A view that was impossible six years ago. There was a group of buildings including another high-rise in the vacant area in the middle ground. #7986
20120805_7441_1D3-600 Newstalk ZB building starting to go down 06 #2642
The city side of the South Brighton bridge. Approaches on both sides will need extensive work before this bridge can re-open. Bridge opened for traffic less than a week later, but still (23/09) has 30kmh speed restriction.
A couple of city blocks away from the now damaged Cathedral a temporary $4million cathedral has been built using large cardboard tubes and sheeting.
Haha! This is the day before Mainzeal (see sign on fence at left) announced they had gone into receivership owing millions to the banks and sub-contractors like Smiths whose equipment is here.
Awaiting the demolition ball! See the hole punched in by the neighbouring building (now demolished) during the February 22 2011 earthquake. This building is leaning to the north (left) while it's now demolished neighbour was leaning to the south (right). All because the crap land gave way underneath!
Exactly 2½ years (27/02/11 - 27/08/13) since the Queensland (Australia) SAR team TF1 spray painted this on a concrete fence in Armagh Street. Not many of these signs left now as many buildings have been demolished.
185 pieces of Rock from Halswell Quarry to represent the 185 lives lost as a result of the 22/02/11 earthquake.
20120805_7586_1D3-600 30 seconds later the dust drifts across the city. Following the demolition of the earthquake damaged Newstalk ZB building. #2649
Following the 5.8 and 6.0 quakes of 23/12/11 there is further damage to the track separating the Bexley Wetlands from the Pacific Park housing area.
Following the 5.8 and 6.0 quakes of 23/12/11 there is further damage to the track separating the Bexley Wetlands from the Pacific Park housing area.