Photo manual and guide provided to design and delivery teams at SCIRT.
A document which describes the SCIRT model and how it drove both collaboration and competition.
An award application for the Civil Contractors NZ Hirepool Construction Excellence Awards 2015 which details Downer's approach to repairing the Armagh Street bridge.
A plan which describes how SCIRT is to carry out construction works. The first version of this plan was produced on 10 August 2011.
A document created in 2011, demonstrating the design parameters for the rebuild of wastewater, storm water, water supply and roading in the central city.
A document which describes SCIRT's approach to ensuring zero harm during its five and a half year programme of work.
A video of a CTV News broadcast of a Ministry of Women's Affairs initiative to attract more women into trades and construction related jobs.
A pdf copy of a presentation which SCIRT presented to Red Cross volunteers, telling them about what SCIRT is and what it does.
An example of a paper which explains the role of an Asset Owner's Representative - Transport Structures at SCIRT.
An example of a paper which explains the role of an Asset Owner's Representative - Water Supply at SCIRT.
A guideline which defined what is and isn't 'on job training', with the purpose of encouraging more 'on job training'.
A guideline which defined the process and ownership of templates used by the design team and the management of the design team electronic library.
A plan which details how SCIRT managed its construction work and ensured a consistent best-practice approach across the approximately 700 projects in the rebuild programme.
A plan which describes how SCIRT will carry out design work. The first version of this plan was produced on 1 September 2011.
A plan which outlines SCIRT's approach to Human Resource Management. The first version of this plan was produced on 30 August 2011.
A photograph taken in 2013, showing one of the 32 large 'Open for Business' signs placed on all of the main routes into the CBD.
A poster which was prepared to go with the award application for the Canterbury Heritage Awards 2016.
A guideline, created in May 2014, to show TMP (traffic management plan) planners how to use the SCIRT proforma.
This document describes the tool developed for capturing the abandoned and removed assets using the SCIRT GIS viewer.
A presentation prepared for the 2016 New Zealand Spatial Excellence Awards: Category: Award for Technical Excellence.
An example of a paper which explains the role of an Asset Owner's Representative - Three Waters at SCIRT.
A document describing the use of 3D modelling for construction methodology.
A document which describes the process that SCIRT took to repair the Sumner Road retaining wall - stage 4.
A guideline to inform designers of the pipe profilometer operation, including requesting profile surveys, standards and assessments of the survey results.
A photograph captioned by BeckerFraserPhotos, "The Christchurch Chinese Methodist Church on Papanui Road. The steeple was removed after the September earthquake. The future of church is unclear, but the church hall has been demolished".
A photograph captioned by BeckerFraserPhotos, "The Christchurch Chinese Methodist Church on Papanui Road. The steeple was removed after the September earthquake. The future of church is unclear, but the church hall has been demolished".