A manual which assists SCIRT draughters to perform quality draughting.
A video filmed during the Liquefaction Trial detonation and immediately following (run time approximately one minute).
A revised memorandum of understanding that sets out how SCIRT and Connexis planned to work together to build an industry training framework and skilled workforce.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.
A tool, in the form of an A5 card, given to workshop and toolbox participants, outlining five easy steps to minimise the impact of roadworks on businesses.
A plan which outlines SCIRT's approach to Human Resource Management. The first version of this plan was produced on 30 August 2011.
A pdf copy of a work notice issued by SCIRT giving an overview of the Beachville Road seawall rebuild project.
A web story about the return of the stone lions to the Memorial Arch.
A pdf copy of one of a series of presentations which Red Cross presented to SCIRT, telling them about what the community is undergoing and how Red Cross helps.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A tool, including an outline, resources and a survey sheet, used by SCIRT's Transport Planning Manager when delivering a series of toolboxes to SCIRT traffic staff about working around businesses.
A presentation prepared by one of the site engineers restoring the Memorial Arch and Bridge of Remembrance, outlining the damage to the structures, the repair designs and the construction methodologies.
A presentation prepared by SCIRT's Downer Communciation Lead, providing an overview of the community engagement carried out by the Downer Team during the restoration of the Bridge and Arch.
A document describing Downer's use of column seismic clamps to prevent additional damage to the Arch columns.
A tool, including an outline, resources and a survey sheet, used by the SCIRT Communication Team when delivering a series of toolboxes to SCIRT subcontractors about working around businesses.
A paper presented at the New Zealand Concrete Industry Conference 2015 about the design and construction challenges faced when strengthening the Memorial Arch.
A runsheet created for the initial SCIRT and New Zealand Red Cross collaboration workshop.
A technical guideline which defines SCIRT Delivery Team requirements for as-built field surveying and attribute information.
A document which explains how to use the SCIRT GIS Viewer.
A plan which aims to ensure the SCIRT programme complies with set specifications, design and industry quality standards. The first version of this plan was produced on 20 July 2011.
A tool, including an outline and run sheet, used by the SCIRT Communication Team when delivering a series of workshops to SCIRT engineers about working around businesses.
A paper delivered at Building a Better New Zealand (BBNZ 2014) Conference. The paper examines the relationship between innovation and productivity improvement in the construction industry.
A memorandum which summarises the outcomes of the SCIRT/New Zealand Red Cross introductory session and the design thinking workshop.
A document which sets out the 12d standards at SCIRT.
A document which summarises the outcomes of the SCIRT/New Zealand Red Cross Datasync project collaboration.
A formal guideline to dewatering.
An example of a checklist used by SCIRT traffic management teams to perform site checks.
A flyer which was attached to an email inviting people to the Humaneers action learning group.
A tool, in the form of a poster, given to workshop and toolbox participants and hung up at worksites and in offices, outlining five easy steps to minimise the impact of roadworks on businesses.
A plan which outlines how projects will be estimated to generate project Target Out-turn Costs (TOCs), and how these link into the programme TOC. The first version of this plan was produced on 29 July 2011.