Slipping of the tectonic plates caused tension cracks on this previously unknown faultline that runs through this paddock; magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
Slipping of the tectonic plates caused tension cracks on this previously unknown faultline that runs through this paddock; magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
Collapsed silos at David Bell Daffodil Farm in Leeston; aftermath of the magnitude 7.1 earthquake that struck mid-Canterbury on Saturday 4 September 2010.
The faultline cuts across Telegraph Road, leaving a kink in its originally straight alignment; aftermath of the magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
On the previously unknown faultline on Highfield Road in mid-Canterbury! This was where two tectonic plates slipped, causing the magnitude 7.1 earthquake on Saturday 4 September 2010.
The faultline cuts across Telegraph Road, leaving a kink in its originally straight alignment; aftermath of the magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
Slipping of the tectonic plates caused tension cracks on this previously unknown faultline that runs through this paddock; magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
Slipping of the tectonic plates caused tension cracks on this previously unknown faultline that runs through this paddock; magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
This originally straight farm fence has been laterally displaced at least 2 metres where it crosses the previously unknown faultline from which the Saturday 4 September 2010 earthquake originated.
This originally straight farm fence has been laterally displaced at least 2 metres where it crosses the previously unknown faultline from which the Saturday 4 September 2010 earthquake originated.
Looking along this previously unknown faultline that runs through this paddock, note how the ground had heaved and subsided; magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
The faultline cuts across Telegraph Road, leaving a kink in its originally straight alignment; aftermath of the magnitude 7.1 earthquake in mid-Canterbury on Saturday 4 September 2010.
Prime Minister John Key drives a tractor to which is attached a crane and a huge demolition ball in the shape of MP Gerry Brownlee's head; the ball smashes against a historic building bringing stone pediments down. Context - Gerry Brownlee, who is Earthquake Recovery Minister, has caused a stir by suggesting that if he had his way some of Christchurch's older buildings would be "down tomorrow". He also said the price of saving some historic buildings badly damaged in the February 22 earthquake was too high. People had died in the quake because of attempts to save historic buildings badly damaged in the September 4 quake. Brownlee said he had no regrets despite the stir his comments caused - but he was annoyed by suggestions the Cathedral and Riccarton House were among buildings he thought should be bowled. He believed those buildings should be saved, and they would be. "I'm not a philistine; I was chairman of the trust that actually saved Riccarton House from the bulldozers in 1990. "I understand conservation architecture very well and I do have an appreciation of heritage buildings." Original cartoon held at A-474-048 Quantity: 1 digital cartoon(s).
The cartoon shows a monstrous machine with an enormous crushing ball attached to a giant crane. It moves past a signpost that points towards Christchurch. A man watches and tells his friend 'Gerry Brownlee borrowed it from Auckland! Context - Brownlee has caused a stir by suggesting that if he had his way some of Christchurch's older buildings would be "down tomorrow". He also said the price of saving some historic buildings badly damaged in the February 22 earthquake was too high. People had died in the quake because of attempts to save historic buildings badly damaged in the September 4 quake. Brownlee said he had no regrets despite the stir his comments caused - but he was annoyed by suggestions the Cathedral and Riccarton House were among buildings he thought should be bowled. He believed those buildings should be saved, and they would be. "I'm not a philistine; I was chairman of the trust that actually saved Riccarton House from the bulldozers in 1990. "I understand conservation architecture very well and I do have an appreciation of heritage buildings." Colour and black and white versions available Quantity: 2 digital cartoon(s).
The 2015 New Zealand strong-motion database provides a wealth of new strong motion data for engineering applications. An important component of this database is the compilation of new site metadata, describing the soil conditions and site response at GeoNet strong motion stations. We have assessed and compiled four key site parameters for the ~460 GeoNet stations that recorded significant historical ground motions. Parameters include: site classification (NZS1170.5), Vs30, fundamental site period (Tsite) and depth to bedrock (Z1.0, i.e. depth to material with Vs > 1000 m/s). In addition, we have assigned a quality estimate (Quality 1 – 3) to these parameters to provide a qualitative estimate of the uncertainty. New highquality Tsite estimates have largely been obtained from newly available HVSR amplification curves and spectral ratios from inversion of regional strong motion data that has been reconciled with available geological information. Good quality Vs30 estimates, typically in urban centres, have also been incorporated following recent studies. Where site-specific measurements of Vs30 are not available, Vs30 is estimated based on surface geology following national Vs30 maps. New Z1.0 values have been provided from 3D subsurface models for Canterbury and Wellington. This database will be used in efforts to guide development and testing of new and existing ground motion prediction models in New Zealand. In particular, it will allow reexamination of the most important site parameters that control and predict site response in a New Zealand setting. Furthermore, it can be used to provide information about suitable rock reference sites for seismological research, and as a guide to site-specific references in the literature. We discuss compilation of the database, preliminary insights so far, and future directions.
In this paper, we perform hybrid broadband (0-10 Hz) ground motion simulations for the ten most significant events (Mw 4.7-7.1) in the 2010-2011 Canterbury earthquake sequence. Taking advantage of having repeated recordings at same stations, we validate our simulations using both recordings and an empirically-developed ground motion prediction equation (GMPE). The simulation clearly captures the sedimentary basin amplification and the rupture directivity effects. Quantitative comparisons of the simulations with both recordings and the GMPE, as well as analyses of the total residuals (indicating model bias) show that simulations perform better than the empirical GMPE, especially for long period. To scrutinize the ground motion variability, we partitioned the total residuals into different components. The total residual appears to be unbiased, and the use of a 3D velocity structure reduces the long period systematic bias particularly for stations located close to the Banks Peninsula volcanic area.
There are hopes an earthquake simulation in Porirua might result in homes being better prepared for a big shake. Houses on Christchurch's Port Hills suffered more damage than houses in other areas during the Canterbury Earthquakes - even though the ground shaking was roughly the same. Now the Earthquake Commission is on a mission to find out why that was - and prevent the same level of damage in a future quake. Checkpoint reporter Logan Church and video journalist Dom Thomas start their report up on a hilly farm above Wellington.
Hundreds of children and 12 schools have pre-registered for swimming lessons at Christchurch's new Taiora QE2 sports centre, which opens today. The Canterbury earthquakes damaged the complex beyond repair, and almost six years after it was demolished, a new QE2 has risen from rubble - admittedly smaller and without the athletics track the old one was so well known for. Schools in particular are welcoming today's opening, after having to spend big bucks on transport to get their students to pools for lessons since the quakes. Logan Church reports.
We're broadcasting today from Christchurch on the second anniversary of the six point three magnitude earthquake which devastated this city. One hundred and eighty five died in the quake and today at midday a memorial service will be held in Latimer Square. After two years, the pace of the rebuild is growing, but for some, so is frustration. More than seven thousand property owners in the residential red zone received a buyout offer from the government. Most of those have taken it - but there are a few who haven't.
RNZ is launching a new podcast today marking the tenth anniversary of Christchurch earthquake. It's called Fragments: Firsthand accounts of the February 2011 earthquakes. The podcast features interviews done with quake survivors recorded in the months following the devastating earthquake recorded by locals Julie Hutton and Sandra Close. RNZ checked in with some of the people Hutton and Close spoke to ten years on from the disaster. Katy Gosset produced and presented the podcast. An earlier version of this article failed to reference the work from Julie Hutton and Sandra Close.
Its budget may have blown out by almost a third more than the original figure, but this weekend the doors to the Christchurch Town Hall will re-open for the first time since the 2011 earthquakes. It was touch and go whether the 47 year-old building would even be repaired after the 6.2 quake eight years ago today. 167-million-dollars later and the city is finally getting its town hall back. Conan Young was allowed inside for a sneak peak ahead of Saturday's official opening.
Two skeletal people sit in armchairs waist-deep in silt. The man is reading the newspaper and says 'The wait's over! The Land Report's due out dear!... DEAR?' He realises that his wife, whose bony hand clutches 'EQC update No. 37', is dead. Context - On Thursday 23 June Prime Minister John Key, Canterbury Earthquake Recovery Minister Gerry Brownlee and representatives from engineering consultants Tonkin & Taylor announced the first part of the Government's long-awaited land report that revealed the fate of up to 5000 quake-damaged homes. Quantity: 1 digital cartoon(s).
A crowd of rather sad people queue for jobs and work at the Christchurch rebuild; all around them are signs that read 'Pike River', 'leaky buildings', 'Chch quake rebuild', 'EQC levy hike', '200,000 children in poverty', 'food prices up', 'deficit', and 'GST hike'. Prime Minister John Key in the centre of the crowd yells 'Hey everyone - look up there!' as he kicks a rugby ball into the sky. Context: John Key attempts to divert the attention of people from New Zealand's current woes. Quantity: 1 digital cartoon(s).
The Canterbury earthquakes caused huge amounts of damage to Christchurch and the surrounding area and presented a very challenging situation for both insurers and claimants. While tourism has suffered significant losses as a result, particularly due to the subsequent decrease in visitor numbers, the Canterbury region was very fortunate to have high levels of insurance coverage. This report, based on data gathered from tourism operators on the ground in Canterbury, looks at how this sector has been affected by the quakes, claims patterns, and the behaviour and perceptions of tourism operators about insurance.
A few older Christchurch Earthquake Pics from after the 6.3 last Feb (2011). And yes the aftershocks are still happening.. Twitter | Facebook |
St Marys Church
A few older Christchurch Earthquake Pics from after the 6.3 last Feb (2011). And yes the aftershocks are still happening.. Twitter | Facebook |
A few older Christchurch Earthquake Pics from after the 6.3 last Feb (2011). And yes the aftershocks are still happening.. Twitter | Facebook |
St Marys Church
Damage to the St John The Evangelist Catholic Church in Leeston suffered during the magnitude 7.1 earthquake that struck mid-Canterbury on Saturday 4 September 2010.